Presentation is loading. Please wait.

Presentation is loading. Please wait.

Power System Supply ReliabilitySupply Reliability and Performance Pledges Tariff Why talk to CLPWhy talk to CLP? FAQ How Can CLP Help? Contact Us.

Similar presentations


Presentation on theme: "Power System Supply ReliabilitySupply Reliability and Performance Pledges Tariff Why talk to CLPWhy talk to CLP? FAQ How Can CLP Help? Contact Us."— Presentation transcript:

1 Power System Supply ReliabilitySupply Reliability and Performance Pledges Tariff Why talk to CLPWhy talk to CLP? FAQ How Can CLP Help? Contact Us

2 Power System Generation CLP has 3 generation plants located in the New Territories and 2 located on the Mainland. CLP and Hong Kong Electric’s (HEC) networks are interconnected to back up each other in cases of emergency. This means that there are no less than 6 supply sources to the CLP network at any point in time. Back to main page

3 Power System Transmission Network CLP’s transmission system is connected to Hong Kong Electric’s and to the China Southern Power Grid via transmission circuits. This connection safeguards CLP customers from any major power loss during cases of emergency. Back to main page

4 Distribution Network CLP’s distribution network is based on 11kV Closed Ring supply system. This ensures that there is enhanced supply security. This arrangement also provides substantial cost saving for data center operators trying to achieve n+1 supply reliability through cost avoidance. Power System Back to main page

5 Supply Reliability and Performance Pledge Back to main page Pledge Targets 2011 Results 2010 Reliability of electricity supply 99.99 % ☺ 3 days advance notice of planned outage 99 % ☺ Average arrival time for loss of supply inspection 36 minutes ☺ Average supply restoration time after fault outage 2 hrs ☺ Connect and supply within same day after satisfactory installation inspection 99.95% ☺ Answer emergency service hotline within 9 seconds 90% ☺

6 CLP’s tariff is amongst the lowest in the world for its level of reliability. In addition to being one of the lowest cost our tariff has the following features : Simple Structure – Data center operators have a choice of 3 simple tariff types, 2 of which are “time of use” based. Charges are based on actual demand and actual consumption. Transparent – All components of the tariff are published. Stable – CLP tariff is reviewed once per annum enabling customers budget certainty. Tariff Back to main page

7 Robust Network – 99.99% reliability Dedicated staff with technical and business skills to provide your data center electricity solutions Stable Tariff – Tariff is reviewed once per annum enabling customers certainty of budget Cares for the environment Why talk to CLP Power? Back to main page

8 CLP can help data center customers as follows Location selection Works interface – your internal installation and CLP’s installation Fast track power supply Project Management Asset purchase and installation Post installation asset maintenance Post installation energy management Working with CLP Power Back to main page

9 CLP has a dedicated team to handle all data center electricity supply enquiries. You may reach the team at the address provided below. Address: 7/F Shumshuipo center, No. 215 Fuk Wa Street Or you may send in your enquiry email to accmgr@clp.com.hk Working with CLP Power Back to main page

10 Q1: What is the supply lead time for the provision of electricity supply? Answer: The supply lead time will depend on the potential data center site and the requested electricity demand. It will also depend on CLP’s works programmes and other customer projects. CLP can provide the estimated supply lead time within a few days of notification of the location and the loading. Frequently Asked Questions (FAQ) Back to main page Q2: Can CLP fast track power supply? Answer : CLP will endeavour to fast track energisation and supply depending on load demand and commitments on uptake. We encourage you to speak to our team dedicated to handling all enquiries on data center power supply.

11 Q3: How can CLP maintain reliability levels at 99.99 % when it is the only supplier? Answer: It is not necessary for power supply to be sourced from two different generation companies for it to be more reliable. CLP strength lies in its network. With any electricity utility supply system, most power disturbances originate from the network i.e due to accidental cable damage, lightning etc. CLP’s robust network is able to eliminate any disturbances before it affects customers. Frequently Asked Questions (FAQ) Back to main page Q4: How does the interconnection between CLP, HEC and Guangdong Power Grid work? Answer: HEC supports CLP and vice versa in case of any power supply emergency. CLP purchases a portion of its power supply for its customers from Guangdong Daya Bay Nuclear Power Station.

12 Frequently Asked Questions (FAQ) Back to main page Q5 : Given CLP’s system connectivity with Hong Kong and Guangdong can a data center operator claim to be a tier 4 data center? Answer: The data center "tier" definitions were developed by data center professionals. It is not for CLP to determine whether a data center operator can claim to be a tier 4 data center based on CLP’s supply network. We can advise though, that CLP’s network can obtain power from multiple supply sources, 3 from power stations located in the New Territories and 2 on the Mainland. In addition, CLP and HEC back-up each other through the interconnection in case of a power supply emergency. Whether the data center operators conclude the above as being a dual or multiple source will depend on their interpretation of a “Tier 4” data center.

13 Frequently Asked Questions (FAQ) Back to main page Q6 : Are CLP electricity tariff rates negotiable? Answer: CLP’s tariff rates are fixed and all components are transparent. Customers may apply for the rate that is appropriate to their actual consumption. CLP’s tariff is amongst the most competitive in comparison with other world class cities. Our tariff table is available at https://www.clponline.com.hk/myBusiness/CustomerService/TariffOvervie w/Pages/Default.aspx https://www.clponline.com.hk/myBusiness/CustomerService/TariffOvervie w/Pages/Default.aspx Our dedicated data center team will be happy to advise you on the most appropriate tariff for your load.


Download ppt "Power System Supply ReliabilitySupply Reliability and Performance Pledges Tariff Why talk to CLPWhy talk to CLP? FAQ How Can CLP Help? Contact Us."

Similar presentations


Ads by Google