Artificial Rockwork Specialist MYOUNG-SAN. www.myoungsan.co.kr CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

Similar presentations


Presentation on theme: "Artificial Rockwork Specialist MYOUNG-SAN. www.myoungsan.co.kr CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,"— Presentation transcript:

1 Artificial Rockwork Specialist MYOUNG-SAN

2 CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities, Artificial Rock Products Certification: ISO 9001:2000 / ISO 10041:2004 / Innovative Biz Class A / Exclusive R&D Biz

3 CAPABILITY Patents on Artificial Rock -No : Artificial Rock Panel Structure Combining & Combining Method -No : Artificial Rock Construction Method -No : Artificial Garden Rock & Manufacturing Method -No : Manufacturing Method for Artificial Rock with Cracks -No : Manufacturing Method for Artificial Rock with Durability -No : Artificial Rock

4 TRACK RECORD Yeoju Sky Valley C.C. 1998Incheon International Airport 2001Rex Field C.C Gapyeong Benest Golf Club 2003 Jecheon Uirim-Reservoir 2004Shinlim Humansia Apartment 2006

5 TRACK RECORD Songdo Jack Nicklaus C.C Sungbok Hillstate Apartment 2010 CJ Nine Bridge C.C Pangyo Cullinan Housing 2007 Mudeungsan 2007 Gwangmyeong, Speeddom bicycle race park 2011

6 TRACK RECORD Ulsan, Posco The sharp apartment 2013Sunchen, Garden exhibition Kimhae, Lotte waterpark 2014 Inchen, Asian sports complex, 2014 Ara Waterway, Gulpo 2012

7 TRACK RECORD Overseas Projects CountryYearProject Japan 1990Artificial Rock for Edelweiss C.C (Saitama Prefecture) Exhibition Venue at Harumi (Tokyo) 1991Artificial Rock Construction at Sablés C.C (Nara Prefecture) USA 1998Artificial Rock Construction for Holiday Inn (New York) Miniature Golf Course Construction (New Jersey)

8 CONSTRUCTION Manufacturing Method for Durable Artificial Rock - Beautification work of retaining wall or concrete structure - Special construction process to prevent cracks and corrosion during installation Special Painting on top of Concrete Rock (5~6 times) Reinforcing Steel Bar Steel Cage Concrete Primer Concrete Finish Spray Steel Angle Retaining Concrete Wall or Structural Steel

9 CONSTRUCTION Artificial Rock Planter Construction - Provision of rock planter for better natural look - Also easily used for installing other equipment if required Reinforcing Steel Bar Concrete Spray Soil Stiffener Structural Steel Drainage Artificial Rock 10, 10a : Artificial Rock Surface 11 : Planter (Concrete Pot) 220, 410, P : Drainage 50 : Soil Precast Panel ConstructionIn Situ Construction

10 CONSTRUCTION Artificial Rock Construction Process 1. Fabrication of Steel Cage 2. Anchoring of Support Structure 3. Installation of Steel Cage

11 CONSTRUCTION Artificial Rock Construction Process 4. Scaffolding on Site 5. Primer Concrete Spray Coat 6. Finish Spray Coat & Sculpturing

12 CONSTRUCTION Artificial Rock Construction Process 7. Art-Painting 8. Site Clean up

13 CONSTRUCTION Texture & Color (nature-type) : Naturally exposed forms brown, dark brown, red : Old worn-out forms (faceted) brown, dark brown, blue : Old worn-out forms (rounded) brown, dark brown : Naturally exposed granite forms light brown, red : Partial moss-grown forms dark brown, red : Partial moss-grown forms dark brown, red

14 CONSTRUCTION : castle wall forms bright brown : masonry forms brown, dark brown, grey : semi-indeterminate form : indeterminate form Texture & Color (artificiality-type)

15 CASE STUDY _ Ara Waterway, Gulpo Progress of construction process Situation before Initial work 2. Steel-frame structure 3. Installation of Steel Cage 4,5. Set up a scaffold * The waterfall contains the largest artificial work of Domestic records

16 ,7. Sprayed a rough shotcrete 8. Facing a complete shotcrete 9. Painting structure 10. Create a plant pot CASE STUDY _ Ara Waterway, Gulpo Progress of construction process

17 Vertical Section ∙Perspective view 123 ① ② ③ CASE STUDY _ Ara Waterway, Gulpo Structural cross section

18 Completion image Test Run of Water Fall CASE STUDY _ Ara Waterway, Gulpo