Workforce & Engineering Design Optimization Plenary Session: Enterprise Resource Planning for Infrastructure and Utilities Gurgaon India Feb 7 2012 GIS.

Similar presentations


Presentation on theme: "Workforce & Engineering Design Optimization Plenary Session: Enterprise Resource Planning for Infrastructure and Utilities Gurgaon India Feb 7 2012 GIS."— Presentation transcript:

1 Workforce & Engineering Design Optimization Plenary Session: Enterprise Resource Planning for Infrastructure and Utilities Gurgaon India Feb 7 2012 GIS as Core of SmartGrid

2 GE Confidential and Proprietary Increasing grid complexity…

3 GE Confidential and Proprietary DATA & COMMUNICATIONS Power Generation Transmission & Distribution Residential & Community Industrial & Commercial Diagnostics & visualization Substation digitization Mobile applications Reliability & demand forecasting Smart appliances Home energy use monitoring Backup power mgmt & control TOU reporting Energy management Generation optimization Renewables Microgrids Protection & control Advanced metering infrastructure Distributed generation infrastructure Asset monitoring & diagnostics Embracing renewables Increasing reliability Empowering consumers Increasing efficiency World Talking on : Real. Smart. Solutions.

4 GE Confidential and Proprietary Information infrastructure The integration of two infrastructures … securely … Network infrastructure Need: for a smarter grid + Embracing renewables Empowering consumers Increasing productivity Reducing CO 2 emissions Increasing efficiency

5 Workforce and Engineering Design Optimization as an enabling platform Transmission optimization Distribution optimization Demand optimization Asset optimization Workforce & Engr. design optimization Mobile computing platform for outage restoration and switching Digital terrain model for sag and clearance calculations Substation control room management “System of Truth” for network model AMI system planning and deployment Capacity Planning Schematic Generation Geospatial reference data Workforce dispatching HAN device management Workforce & Engr. design optimization

6 GIS: …is any information system that integrates, stores, edits, analyzes, shares, and displays geographic information. Workforce & Engineering Design Optimization : …is a set of applications integrated together that uses geographic information, mobile computing technology and optimized scheduling to streamline business processes, make field crews more efficient and help the utility deliver higher customer service by more efficiently utilizing resources. GIS - Core of Workforce & Engineering Design Optimization

7 T&D and Comms Infrastructure Mgt. Workforce Automation Mobile Computing Workforce & Engr. Design Opt PlanningEngineeringDesign Mobile Mapping Mobile Apps Schedule Optimization Work Order Mgt. Restoration It is more than just GIS. It is the integration of the Office, Crew & Customer Workforce and Engineering Design Optimization as a Smart Grid application suite Plan Design Construct Service Maintain Restore

8 ERPWork MgtCISMDMEnterprise IT WEDO and the Utility IT Ecosystem PlanDesignConstructServiceMaintainRestore Workforce & Engineering Design Opt

9 Thank You! Enjoy your Conference