Presentation is loading. Please wait.

Presentation is loading. Please wait.

MINERAL RESOURCE ASSETS DEVELOPMENT

Similar presentations


Presentation on theme: "MINERAL RESOURCE ASSETS DEVELOPMENT"— Presentation transcript:

1 MINERAL RESOURCE ASSETS DEVELOPMENT
Corporate Strategic Vision Strictly Confidential

2 FORWARD LOOKING STATEMENTS
This presentation includes certain “forward-looking statements.” All statements, other than statements of historical fact, are forward-looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove accurate, and actual results and future events could differ materially from those anticipated in such statements. Such information contained herein represents management’s best judgment as of the date hereof based on information currently available. The company does not assume the obligation to update any forward-looking statement. NOTICE TO RECIPIENT This presentation has been prepared for, and is being distributed to a limited number of knowledgeable investors in connection with a proposed financing, Corporate financing source ( or the “Company”). The recipient acknowledges that the information contained herein is confidential and proprietary to the Company, and that it may not be disclosed without prior written consent to third parties other than the recipient’s agents, employees and representatives who require such material for the purpose of evaluating this proposal and a related financing decision. The material and information presented herein may be subject to change or modification without notification. The recipient acknowledges that this document is not intended to be solely relied upon as a basis for any financing and related decisions. Additional information will be provided upon request Strictly Confidential Strictly Confidential

3 CONTENT Corporate mineral assets resources and location
Mineral resource assets development stage Mineral resource strategic assets development Mineral resource assets quality and economic financial aspects Asset project development plan medium and short term Mineral assets investment program Management Regulation and license Strictly Confidential

4 CORPORATE MINERAL RESOURCE ASSETS
More than 240 mineral assets have been evaluated since throughout Mongolia 62 various mineral assets retained including 18 various mineral deposits Ongoing exploration and drilling on 46 licensed fields Strictly Confidential

5 CORPORATE MINERAL RESOURCE ASSETS
5 high grade thermal & coking coal million tonnes of proven resource and targeting billion tonnes 2 large tonnage thermal coal billion tonnes 1 gold kg proven reserve targeting 6 tone 2 molybdenum tonnes of proven reserve targeting tones, and minor Cu 67,585.1t, Re 9 t 1 lithium, strontium, potash - 1,420,000.0 T net metal Li and Strontium 408,000.0 T net metal, Potash sulphate 22,0 MT. Potential lithium carbonate tonnage could exceed 10MT. 1 Rare earth elements - 37,3 MT oxide of proven reserve targeting 6 Mt over group of licenses, plus unexplored Fe over 2.2kmx300m area, co-product of P2O5, by product of strontium. 1 Fluorite ,000,0 T of proven resource with potential of 1.1 Mt resource 1 Limestone ,877.0 T of proven resource with potential of MT resource 1 Cu- Fe Under resource evaluation 1 Cu-Mo Under resource evaluation 2 Pb-Zn Under resource evaluation Strictly Confidential

6 DOMINATED RESOURCES AND RESERVES OF KEY COMMODITIES
Erdenetsogt – 2400 Mt Eruult – 1400 Mt Khotgor – 3000 Mt Dalan – 33 Mt Nalaikh – 24 Mt Strictly Confidential

7 DOMINATED RESOURCES AND RESERVES OF KEY COMMODITIES
DOMINATED RESOURCE AND RESERVE OF KEY COMMODITIES Lithium Mt net met Potassium 22 Mt Strontium net metal Gold 6 Tone Coking coal 3000 Mt Thermal coal 3800 Mt Molybdenum T REE 5.9 Mt Data source explored and drilling Lithium Strontium deposit, Rare earth elements deposit ranking are evaluated and estimated as world class deposits Strictly Confidential

8 CORPORATE MINERAL RESOURCE ASSETS COAL
Nalaikh underground coal mine located 45 km from Ulaanbaatar High quality thermal coal 6400 kcgl/kg over Infrastructure highly developed in Nalaikh district Life of mine 16 years Saleable mine reserve 16.1 Mt Reserve 23.4 Mt Capex $34 M USD Opex $26 USD per tone Sales price $45 USD per tone Employee 210 NPV M USD Strictly Confidential

9 CORPORATE MINERAL RESOURCE ASSETS COAL
Drilling exploration Pre feasibility study Feasibility study Environmental analysis and action plan Underground mine planning design engineering full completed Local coal selected market analysis report Electric power line, water supply are ready Infrastructure rail way are under discussion Nalaikh underground coal Mining license MV Underground equipment supplier Famur group Poland Expected commissioning date 3 quarter of 2014 Strictly Confidential

10 CORPORATE MINERAL RESOURCE ASSETS COAL
Khotgor deposit includes MV and XV licenses Khotgor(947Ha) coal deposit lies approximately 1500km west from capital city Ulaanbaatar , 80 km SW from provincial center Ulaangom city, and 55km NE from Bokhmoron Soum of Uvs province 574 Mt proven resource on MV license Additional exploration programme commenced to identify further coal resources on neighbor XV exploration license area targeting billion tonnes Strictly Confidential

11 CORPORATE MINERAL RESOURCE ASSETS COAL
Dalan deposit MV Mining license, (Ha) and group of neibourgh licenses, Tsagaan Us XV , Alag tolgoi MV , Ariin khudag MV The Dalan deposit area is located in Dalanjargalan Soum, Dornogobi Aimag, approximately 285 km southeast of Ulaanbaatar, Mongolia. The major asset associated with the Dalan Project is a thermal coal deposit with resources of 33.4 million tonnes with a nominal calorific value of 4,800 kcal/kg and an average stripping ratio of 2.15 BCM per tonne of coal. Strictly Confidential

12 CORPORATE MINERAL RESOURCE ASSETS COAL
Moisture War, % Moisture Wad, % Ash (Adry) Volatiles (Vdaf) Sulphur (Std) Calorific Value (Qr) Kcal/kg Calorific Value (Qd) Kcal/kg Calorific Value (Qdaf) Kcal/kg Erdenetsogt MV coal deposit is located 430km SE of Ulaanbaatar, 85km NNE of the provincial Center Sainshand. The Chinese border is 230 km by rail from Sainshand to Zamiin- Uud border crossing. Coal resource is estimated in accordance with JORC standard by Norwest. Estimated resource of 2.4 billion tonnes Low mining strip ratio 1: 0.17 Strictly Confidential

13 CORPORATE MINERAL RESOURCE ASSETS COAL
Eroolt deposit includes a group of licenses including Tsagaan Zalaat ( Ha), Eroolt ( Ha), and Nuurst Hudag(4123Ha). Eroolt project is located 640km SE of Ulaanbaatar, 90km east of provincial center Baruun Urt and 25km from Asgat Soum, Sukhbaatar aimag. The properties lie approximately 180 km northwest of check border with China. The dip angle of the coal seam is 0 to 5 degree and the coal seam has stable distribution. The coal is suitable for opencast mining. The coal characteristics are as follows: Total moisture (Wp) %, Inherent moisture (Wa) %, Ash (Aa) – %, Volatile matter (Vr) %, Sulfur (Sc) – 0.71%, low Caloric value (Qar) – 2180 ~5115 kcal/kg to the average of 4023 kcal/kg, high Caloric value (Qgr) – 3512~6886 kcal/kg to the average of kcal/kg. Caloric value of this area is average of low Caloric value (Qar) is about 4023 kcal/kg. Estimated coal resource is 1,4 billion tonnes. Strictly Confidential

14 CORPORATE MINERAL RESOURCE ASSETS MOLYBDENUM
Zost Mo deposit is located in Tosontsengel soum, Zavkhan province. The deposit covers 2 licenses Zost uul XV-04251, and Ovor zost XV Mo – 25, T of proven resource 0.04% cut off grade. Minor Cu – 67,585.1 T, Re – 9.0 T. Early government resource estimation is 650,000.0 Tone Strictly Confidential

15 CORPORATE MINERAL RESOURCE ASSETS MOLYBDENUM
The Tsagaan Chuluut deposit includes MV and XV licenses. The Tsagaan chuluut deposit is located in the territory of Umnudelger, and Ulziyt soums of Khentiy aimag, 327km to east from capital city Ulaanbaatar. Mo reserve of Tsagaan Chuluut deposit is bieng calculated as proven and probable reserve at cutoff grade contain 32.7thousand tone of Mo in 77.6Mt ore. Detailed exploration work should be extended another 1500m to west and possible to increase the reserve 60 up to 80 thousand tone to bring the total reserve 150thousand tone. The deposit consists of economic mineral association Mo-Re-Li. Strictly Confidential

16 Mineral resource strategic assets development Litium
Mine development and design Lithium processing plant design engineering Scoping study Environmental analysis and action plan Infrastructure analysis and action plan Bankable feasibility study Metal refining pilot study Financial and economic model Lithium selected target market analysis and action plan Mine processing plant engineering Strictly Confidential

17 Mineral resource strategic assets development Litium
Khukh Del is world class underdeveloped brine lithium, potash and strontium deposit Deposits contain following elements: lithium potassium, strontium, cesium and boron. Magnetic and radiometric survey Electric and magnetic survey Gravity surveying and implementation Topographic and geodetic survey Full drilling and interpretation Detailed geological mapping Sectional interpretation and polygonal resource estimation Mineralogical petrologic and geochemical investigation Metallurgical recovery tests Laboratory Germany, Russia and Mongolia samples assayed Mineral reserve estimate report JORC Strictly Confidential

18 Mineral resource strategic assets development Litium
STATEMENT OF MINERAL RESOURCE Area Category Quantity Mtonnes Li2CO3 ppm Li ppm K2SO4 % K % Li2CO3 KT Li Metal Kt K2SO4 Mt K Metal Mt Enkh area inferred 30.68 7.752 1.456 6.08 2.73 237.8 44.7 1.9 0.8 Delgerekh area 157.07 7.725 1.451 9.05 4.06 1213.4 228 14.2 6.4 indicated 78.84 8.326 1.564 8.03 3.6 656.4 123.3 6.3 2.8 Chuluut area 6.78 7.734 1.453 7.13 3.2 52.4 9.9 0.5 0.2 subtotal 85.62 8.279 1.555 7.96 3.57 708.9 133.2 6.8 3.1 Indicated 8.325 8 3.59 All 194.52 7.729 1.452 8.5 3.81 1503.6 282.5 16.6 7.4 Total 273.36 7.899 1.484 8.4 3.75 2160.1 405.8 22.9 10.3 Mineral resource estimate by MMC JORC In addition to the JORC mineral estimate, a resource estimation according to Mongolian standard has also been conducted and can be reviewed below. Category Quanty (Mt) Li Metal (Kt) K Metal (Mt) A 23.5 37.7 0.8 B 98.8 151.3 4.1 A+B 122.3 189 5 156.4 246.5 6.3 A+B+C 278.8 435.5 11.3 P1 639.2 984.5 26.2 Strictly Confidential

19 Mineral resource strategic assets development Rare Earth Elements
The Mushgia khudag deposit includes group of licenses MV Bayan Tomortei XV Mushgia Khudag XV Mushgia Ukhaa XV Khurmen tolgoi. The deposit is located 500km SW from capital city Ulaanbaatar and 32km SW from Mandal Ovoo sum. In , Russian geological expedition provided first drilling program (with 2800m drilling on 20 bore holes) and estimated over million tonnes of REO in total resources. In , Mongolian geological research team completed exploration work on Central, Khuren Khad and Tumurtei ore zones at Mushgia Khudag (total 8025m drilling on 41 bore holes) and estimated 0.4 million tonnes of REO oxide in total. USGS evaluated its resource as 5,9 Mt REO. Unexplored Fe over 2.2kmx300m area As results of exploration works we have determined origin of the deposit, complexity of the geological setting, exploration drilling grid density and estimated rare earth million tonnes of ore or thousand tonnes of rare earth oxides by B category, and probable resources of 1.2 million tonnes of ore or 37.3 thousand tonnes of oxides by C category in compliance mineral evaluation and estimation methods of Mongolia. Strictly Confidential

20 Mineral resource strategic assets development Rare Earth Elements
Strictly Confidential

21 MINERAL RESOURCE ASSETS QUALITY AND ECONOMIC FINANCIAL ASPECTS
Mineral Resource and reserves are potential Mineral resource and reserve ore are high grade Mineral resource assets location is near main markets and infrastructure Mineral resource each assets are very attractive for investors, customers and partners Mineral resource assets are Economically very profitable and highest indicative NPV and long life mine cycle Reserve should potential increase medium term Strictly Confidential

22 PROJECT MANAGEMENT TEAM MEMBERS AND PARTNERS
Erdemmanlai - CEO Ganotgo Director of Geology and Mining Department Unurjargal - Project manager International relation Purevdorj - Project manager Mining engineer Ser od Project manager Geologist Lhkagva - Project financial manager Baatar - Project mining engineer Mckinsey & co - Mining consulting MMC Minarko - Reserve estimate mine planning Dassault systems - Mining software Famur group - Poland underground mining equipment manufacturer DHMS - Germany underground mining equipment manufacturer Takraf group- Germany mining equipment manufacturer Mongolian Minerals Corporation – Canada Yu Jin Investment - Singapore Kunming Coal Design and Research Institute - China Strictly Confidential

23 KEY HIGHLIGHTS Low cost producer with substantial high grade and growing Reserve and Resource Continuous ramp up supported by well established operations and Integrated infrastructure Earning quality upside cost reduction and revenue enhancement Expanding customer base and strong strategic relationship with customers Strategically located to tap into Strong Demand from China Experienced Management Team Partnered with Institutions Strictly Confidential

24 KEY MILESTONES – SUCCESSFUL TRANSFORMATION INTO FULLY INTEGRATED MINE
2012 Exploration Drilling Reserve and resource evaluation and estimate 2013 Reserve estimation Feasibility study Project implementation Mining license obtain Coal selected target market analysis expanding customer base Mine planning and design 2014 Nalaikh underground coal mine commissioning Eruult coal mine commission end of 2014 Main assets and deposits infrastructure study Rare earth element mine commissioning 2015 Lithium mine commissioning Zinc and lead mine commissioning Iron ore mine commissioning Copper –Fe mine commissioning Strictly Confidential

25 KEY ASPECTS OF JUNIOR MINERS
Rapid Production Growth leading fully integrated Mongolian mineral resource producer Closest coal and minerals exporter supply to in China’s eastern province Asset quality (ROM ore high grade) Low-cost producer – positioned on the of the global cash cost curve Planned railway or asphalt road and paved road 1-3 years Reserves & Resources Overview Rapid Planned Production Growth Mining Processing Transportation Sales & Marketing Open pit operation (one large open pit and 1 underground mining should be construction and commissioning in 2014) Owns all mining equipment from world renowned suppliers (including Caterpillar Takraf Atlas Copco Famur and DHMS) Strictly Confidential

26 KEY ASPECTS OF MONGOLIAN MINING REGULATORY FRAMEWORK
Corporate Income Tax 10% net profit tax No Export Restrictions No restrictions on minerals exports / no domestic market obligations Royalties 2.5% - 5% Mining Licenses Mineral Resources Authority under the Ministry of Mining (pursuant to the new structure of the Government of Mongolia) Regulatory Authority Initial term of 30 years, can be extended for two additional 20-year periods. Only entities registered in Mongolia are allowed to own mining licenses. 100% foreign ownership is permitted, subject to governmental approval required under the Law on the Regulation of Foreign Investment in Entities Operating in Strategic Sectors (2012). VAT Exported finished mineral products are subject to zero rate VAT Strictly Confidential

27 REGULATION AND LICENSES
Additional information Types of licenses The Minerals Law of Mongolia contains two types of licenses, as follows: An Exploration License, which entitles the license holder to carry out mineral prospecting in the license area; A Mining License, which entitles the license holder to conduct prospecting and exploration work in the license area; Exploration License Mining License 1 License Term Up to 3 years Up to 30 years 2 Extension May be extended twice, up to 3 years each time Subject to feasibility report, up to 20 3 License Area ,000 ha 4 Number of licenses permitted to be held by each legal entity Unlimited Strictly Confidential

28 REGULATION AND LICENSES
License application process Request for license An applicant for a mining license shall submit an application set forth in Articles 24.1 and 24.2 of this law to the Government agency. Registering and processing of application Government agency shall carry out registering and clarifying application. Within twenty (20) business days, agency shall make decision. Payment of the license fee If the applicant who has received a mining license approval notice, applicant shall pay the first year’s license fee within 3 business days. Receiving license Within 7 business days, an applicant shall receive license. Strictly Confidential

29 REGULATION AND LICENSES
License Fee Prospecting license Annual license fees begin at US $0.10 per hectare in the first year and gradually increase to a maximum rate of US $1.50 per hectare in the seventh through ninth years. License holders are required to spend certain minimum amounts of funds on exploration activities beginning in the second year of a license. License Fee Exploration license Annual license fees are US $5 per hectare for coal and common mineral deposits and US $15 per hectare for gold, copper, zinc, and iron. A 2.5% minerals royalty is imposed on coal and common mineral resources whereas the royalty on gold, copper, zinc, and iron is 5%. A mining license holder investing US $50 million in the first 5 years of the project is entitled to enter into an Investment Agreement with the Government which can stabilize rates of corporate income tax, customs duty, VAT and minerals royalties. Strictly Confidential

30 REGULATION AND LICENSES
Relevant laws of Mongolia Environmental Protection Law of Mongolia Constitution of Mongolia Environmental Impact Evaluation Law of Mongolia Minerals law of Mongolia Law on Sanitation Law of Mongolia on Implementation of the Minerals Law Law of Control on Explosives and Accessories and Explosives Circulation Prohibiting minerals exploration and mining in protected zones of sources of rivers those originate streams of rivers, drainage basins and forest areas. Chemical Toxic and Dangerous Substance Law Domestic and Industrial Waste Law of Mongolia Law of Mongolia on Foreign Investment Law on Licensing Auto Road Law The Law on Subsoil Business Entity Income Tax Law of Mongolia Law on Land Geodesy and Design Law Law on Land Fees Law on Labor of Mongolia Law of Mongolia on Water Law on Social insurance Water, Air and Environmental Control Law Water and Minerals Water Usage Payment Law Strictly Confidential


Download ppt "MINERAL RESOURCE ASSETS DEVELOPMENT"

Similar presentations


Ads by Google