1 ERCOT RMR Study for Luminant NSO
Jeff Billo RPG Meeting March 13, 2009

2 Luminant – Notice of Suspension of Operations
On February 5, 2009 Luminant submitted Notice of Suspension of Operations (NSO) for: March 13, 2009 RPG Meeting

3 Luminant – Notice of Suspension of Operations
The units were grouped and analyzed in two group based on the proposed suspension dates Group 1: May 2009 Group 2: September 2009 Analysis was done to determine if absence of the units violated any planning criteria as outlined in the Operating Guides Transfer study performed using MUST Voltage Stability study performed using VSAT Study results were reviewed and verified by Operations Staff March 13, 2009 RPG Meeting

4 Luminant – Notice of Suspension of Operations
The following study assumptions were used: 2009 summer peak case (SSWG DSA December 2008 Update) used for Group 1 units All Group 1 units turned off All Group 2 units were available (unless otherwise specified) All wind generation was turned off 2010 summer peak case (SSWG DSB December 2008 Update) used for Group 2 units All Group 1 and 2 units were turned off For each unit a second scenario was modeled where a nearby unit was modeled as unavailable; for some units a third scenario was modeled where a different nearby unit was modeled as unavailable [to meet Operating Guide 5 requirements] March 13, 2009 RPG Meeting

5 Luminant – Notice of Suspension of Operations
Justification for turning off wind generation in RMR analysis using 2008 wind data 348 hours when wind generation was less than 10% of installed capacity (roughly one hour each day) 179 hours when all wind generation in ERCOT was less than 30 MW total (roughly one hour every 2 days) 55 hours when all wind generation in ERCOT was less than 10 MW (roughly one hour each week) 1 hour when all wind generation in ERCOT was 0 MW March 13, 2009 RPG Meeting

6 Luminant – Notice of Suspension of Operations
Permian Basin 5 Results With a nearby unavailable the following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -483 Odessa (138/345) kV Auto-transformer – 1 Auto-transformer – 2 -118 Ackerly Vealmoor – Ackerly 69 kV Line Sharon Ridge – Bluff Creek 138 kV Line March 13, 2009 RPG Meeting

7 Luminant – Notice of Suspension of Operations
Permian Basin 6 Results The following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -56.1 1027 ODESEHV_ ODESEHV_ 345 1 1027 ODESEHV_ ODESEHV_ 345 2 412.3 March 13, 2009 RPG Meeting

8 Luminant – Notice of Suspension of Operations
Permian Basin 6 Results With a nearby unit unavailable the following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -122.5 1356 ACKRLYVE ACKERLY_ 1300 EXSHARNR BLUFCKTA 138 1 150.2 1362 ACKERLY_ ACKRLNTC 210.5 1300 EXSHARNR WILLOWVA 138 1 201.8 1308 GAILLYNT WILLOWVA 138 1 280.0 272.2 401.4 1363 ACKRLNTC SPARNBRG 409.9 1164 LAMESA_ SPARNBRG 1027 ODESEHV_ ODESEHV_ 345 1 1027 ODESEHV_ ODESEHV_ 345 2 346.1 459.2 1054 OLFNNSHL NYLONTAP 138 1 1051 HUNTSMAN REXALL_ 269 1322 BIGSPRIG BIGSPGWE 138 1 1028 ODESEHV_ QUAILSW_ 345 1 1030 MRGNCRK_ LONGSHOR 345 1 March 13, 2009 RPG Meeting

9 Luminant – Notice of Suspension of Operations
Decordova Results With a nearby unit unavailable the following constraints could not be resolved: Transfer Limit (MW) Limiting Element Limiting Contingencies -981 2427 WATMLL_W TRINDAD Limestone 345 kV to Water Mill 345 kV 1 Limestone 345 kV to Water Mill 345 kV 2 -57.2 3380 BIGBRN__ JEWETT_N 345 1 -287 2432 TRICRN1_ TRINDAD 228.5 2420 CHILSW1_ WATMLL_E 345 1 2398 WLEVEE1_ WATMLL_ 2427 WATMLL_W SARGT1_ 2427 WATMLL_W WATMLL_ 473.1 1906 VENUS_S BIGBRN__ 345 1 March 13, 2009 RPG Meeting

10 Luminant – Notice of Suspension of Operations
Further analysis is being done to determine if Permian Basin 5, Permian Basin 6, and Decordova are needed as Reliability Must Run (RMR) units. Uplan analysis being performed to determine if security constrained dispatch is possible Working with Oncor to verify results and possibly determine if RAPs or SPSs can be developed to resolve constraints Initial analysis determined that all other units proposed in the NSO did not qualify for RMR status. March 13, 2009 RPG Meeting

11 Questions? March 13, 2009 RPG Meeting