1 Viking TotalPac2 FireFlex Dual / 1230 Systems Inc. Technical Presentation ASPE Cleveland, OH March 10th, 2010 Technical Presentation ASPE Cleveland, OH March 10th, 2010

2 History: 1990 Power Plants Unit 1991 Light & Ordinary Hazard 2002 Second Generation INTEGRATED SPRINKLER SYSTEMS

3 Expanding the concept: Extended range of configurations: Skid unit Remote controlled unit Self-contained unit INTEGRATED SPRINKLER SYSTEMS

4 Description: Typical System Layout Integrated Cabinet Foam Tank Air Cylinders Distribution Nozzles Piping Network ICAF SYSTEM (water tank also available)

5 Description: Compressed Air Foam (CAF) CAF TECHNOLOGY Uniform & stable High momentum Excellent quality 10:1 expansion Uniform & stable High momentum Excellent quality 10:1 expansion

6 Integrated Clean Agent Systems Clean Agent Integrated Fire Suppression Systems using 3M™ Novec™ 1230 Fire Protection Fluid Combined Automatic Sprinkler and Clean Agent Integrated Fire Suppression Systems using 3M™ Novec™ 1230 Fire Protection Fluid

7 3M Novec 1230: CLEAN AGENT

8 Integrated Clean Agent Systems FireFlex 1230

9 fuel oxygen heat chain reaction Extinguishing Mechanism The Fire Tetrahedron Removing one of the required components for fire or disrupting the balance between them can cause a fire to extinguish Novec 1230 Fluid extinguishes primarily via cooling – removing heat from the fire

10  Non-corrosive  Long term testing of compatibility with materials of construction (system hardware)  Compatability with plastics confirmed  30 year shelf life in properly maintained and installed systems Compatible with fire system materials

11 3M NOVEC 1230 Environmental Properties PropertiesNovec 1230 (FK ) Halon 1301FM-200 (HFC-227ea) ECARO-25 (HFC-125) Ozone Depletion Potential Global Warming Potential Atmospheric Lifetime (years) EPA's SNAP Conformance YesN/AYes

12 3M NOVEC 1230 Physical Properties PropertiesNovec 1230 (FK ) Halon 1301FM-200 (HFC-227ea) ECARO-25 (HFC-125) Design %4-6%5 % % % NOAEL % Occupants Safety Margin % %Nil3-44 %Nil (NOAEL) No Observable Adverse Effects Level for acute toxicity, including cardiac senisitization

13 Site refilling option 3M NOVEC 1230

14 If Novec 1230 fluid is banned from or restricted in use as a fire protection agent due to ozone depletion potential or global warming potential, 3M will refund the purchase price of the fluid.

15 3M Novec 1230: Pre-Engineered Discharge Nozzles: Available: 1", 1½" & 2" dia. 180° or 360° discharge pattern 32' x 32' spacing – 16'-4" max. height No piping below 8,500 cu.ft. ! Pre-Engineered Discharge Nozzles: Available: 1", 1½" & 2" dia. 180° or 360° discharge pattern 32' x 32' spacing – 16'-4" max. height No piping below 8,500 cu.ft. ! CLEAN AGENT

16 FIREFLEX 1230 Engineered Systems: Larger or multiple room hazards or volumes Need some calculations/software required Re-use existing Halon 1301 piping at 500psi Engineered Systems: Larger or multiple room hazards or volumes Need some calculations/software required Re-use existing Halon 1301 piping at 500psi

17 3M Novec 1230: Engineered Discharge Nozzles: Available: ½", 1", 1½", 2" & 2½" dia. 180° or 360° discharge pattern 32' x 32' spacing – 16'-4" max. height Re-use existing Halon 1301 piping at 500psi Engineered Discharge Nozzles: Available: ½", 1", 1½", 2" & 2½" dia. 180° or 360° discharge pattern 32' x 32' spacing – 16'-4" max. height Re-use existing Halon 1301 piping at 500psi CLEAN AGENT

18 Product Description: Fully Integrated Clean Agent System Only Factory Built & Tested Fully Integrated Clean Agent System Only Factory Built & Tested F IRE F LEX 1230

19 Product Description: Sturdy Cabinet with Lock Competitively Priced Eliminates Site Coordination Issues Sturdy Cabinet with Lock Competitively Priced Eliminates Site Coordination Issues F IRE F LEX 1230

20 Product Description: Integrated Potter PFC-4410 RC Releasing panel Clean Agent Cylinder from 40 to 601 lbs cap. Sturdy Cabinet Detailed Instructions & Unit Serial Number F IRE F LEX 1230

21 Available Configurations: Clean Agent Only – No Sprinklers Self-contained or Remote Controlled (no panel) Master-Salve Cylinders Available Main-Reserve Arrangement Available Pre-Engineered or Engineered Piping System Clean Agent Only – No Sprinklers Self-contained or Remote Controlled (no panel) Master-Salve Cylinders Available Main-Reserve Arrangement Available Pre-Engineered or Engineered Piping System F IRE F LEX 1230

22 System dimensions and Capacity Table: FireFlex ® 1230 Cabinets Capacity (# of cylinders) & dimensions Cylinder Size (lbs)Dimensions Cabinet Size ABC 24" "25"77⅛" 36" ¾"25"77⅛" 48" "25"77⅛"

23 Integrated Clean Agent Systems FireFlex DUAL

24 F IRE F LEX DUAL Product Description: Fully Integrated System Combines Preaction & Clean Agent Factory Built & Tested Serialized Fully Integrated System Combines Preaction & Clean Agent Factory Built & Tested Serialized

25 Product Description: Sturdy Cabinet with Lock Competitively Priced Eliminates Site Coordination Issues Sturdy Cabinet with Lock Competitively Priced Eliminates Site Coordination Issues F IRE F LEX DUAL

26 Product Description: Air Compressor Optional Common Integrated Potter PFC 4410RC Releasing Panel Viking Preaction 2” & 3” Clean Agent Cylinder Detailed Instructions & Unit Serial Number F IRE F LEX DUAL

27 Available Configurations: Preaction Single or Double Interlock 2" or 3" dia. Sprinkler Valve Self-contained or Remote Controlled (no panel) Pre-engineered or Engineered Piping System Preaction Single or Double Interlock 2" or 3" dia. Sprinkler Valve Self-contained or Remote Controlled (no panel) Pre-engineered or Engineered Piping System F IRE F LEX DUAL

28 FireFlex ® DUAL Cabinets Capacity (# of cylinders) & dimensions Cylinder Size (lbs)Dimensions Cabinet Size ABC 36" ¾"25"77⅛" 48" "25"77⅛" System dimensions and Capacity Table:

29 NFPA 2001 Standard on Clean Agent Fire Protection Systems ISO Standard on Gaseous Media Fire Extinguishing Systems UL Listed FM Approved VdS Approved LPCB Approved IMO Recognized Lloyds Approved Standards, Approvals and Listings for Novec 1230 Fluid U.S EPA SNAP approved as alternative to halon in occupied spaces DNV Approved Bureau Veritas Approved CNPP Approved

30 LISTINGS & APPROVALS Clean Agent (Sevo Equipment): UL & ULC Listed: 360 psi Pre-engineered Systems Engineered Systems by Mid-2010 FM Approved: 500 psi Pre-Engineered Systems Engineered Systems early 2010 UL & ULC Listed: 360 psi Pre-engineered Systems Engineered Systems by Mid-2010 FM Approved: 500 psi Pre-Engineered Systems Engineered Systems early 2010

31 Potter Releasing Panel & Viking Preaction System: UL & ULC Listed FM Approved CSFM Approved NYC Accepted UL & ULC Listed FM Approved CSFM Approved NYC Accepted LISTINGS & APPROVALS

32 F IRE F LEX DUAL & 1230 (Assembled Units): Pre-engineered System: c-UL-us (early 2010) FM Approved 500 psi Engineered System: c-UL-us & FM (early 2010) CSFM & NYC (early 2010) Pre-engineered System: c-UL-us (early 2010) FM Approved 500 psi Engineered System: c-UL-us & FM (early 2010) CSFM & NYC (early 2010) LISTINGS & APPROVALS

33 Cable racks Clean Rooms Clinical / Diagnostic equipment Control Rooms Data Centers Electric Utility facilities Generator & turbine enclosures Cable racks Clean Rooms Clinical / Diagnostic equipment Control Rooms Data Centers Electric Utility facilities Generator & turbine enclosures APPLICATIONS IT Systems Mix rooms Pump Stations Switch Rooms & UPS Telecommunications Testing / Imaging equipment Transformer Vaults Etc… IT Systems Mix rooms Pump Stations Switch Rooms & UPS Telecommunications Testing / Imaging equipment Transformer Vaults Etc…

34 Information required for design Obtain specifications Approvals required, AHJ Determine if a reserve is required Identify hazard normal ambient temperature Obtain location altitude Obtain drawings, sketches of dimensions Qualify room size when quoting a job Obtain hazard areas, length, width, ceiling height Determine system location Obtain specifications Approvals required, AHJ Determine if a reserve is required Identify hazard normal ambient temperature Obtain location altitude Obtain drawings, sketches of dimensions Qualify room size when quoting a job Obtain hazard areas, length, width, ceiling height Determine system location

35 Thank you ! F IRE F LEX DUAL & F IRE F LEX 1230 by the same people who first brought you integrated fire protection systems Systems Inc.


Download ppt "Viking TotalPac2 FireFlex Dual / 1230 Systems Inc. www.fireflex.com Technical Presentation ASPE Cleveland, OH March 10th, 2010 Technical Presentation ASPE."

Similar presentations


Ads by Google