1 Water Quality Improvements Riverglen Subdivision Valve Replacements April 4, 2013

2 The Infrastructure Response

3 Master Project Hillsborough County Public Utilities Department Hillsborough County Public Utilities Department Countywide Potable Water Lines Renewal and Replacement Program Countywide Potable Water Lines Renewal and Replacement Program This program is to improve water quality and service by replacing valves and undersized lines, and connecting water lines to remove “dead ends”. This program is to improve water quality and service by replacing valves and undersized lines, and connecting water lines to remove “dead ends”. Infrastructure and Development Services Public Utilities Department

4 Project Benefits Reduction of number of locations taken out of service during line repairs. Reduction of number of locations taken out of service during line repairs. Maintaining fire protection. Maintaining fire protection. Infrastructure and Development Services Public Utilities Department

5 Construction Work Summary Replace: Replace: Fifteen (15) 12-inch valves on Donneymoor Drive Fifteen (15) 12-inch valves on Donneymoor Drive One (1) 4-inch valve and one (1) 6-inch valve on Sunnyoak Drive One (1) 4-inch valve and one (1) 6-inch valve on Sunnyoak Drive Seven (7) 6-inch valves on Shady Forest Drive Seven (7) 6-inch valves on Shady Forest Drive One (1) 4-inch Valve and Six (6) 6-inch valves on Glenpointe Drive One (1) 4-inch Valve and Six (6) 6-inch valves on Glenpointe Drive Infrastructure and Development Services Public Utilities Department

6 Construction Work Summary (continued) One (1) 4-inch valve and two (2) 6-inch valves on Glenox Lane One (1) 4-inch valve and two (2) 6-inch valves on Glenox Lane Two (2) 6-inch valves on Kelp Lane Two (2) 6-inch valves on Kelp Lane One (1) 6-inch valve on Racine Place One (1) 6-inch valve on Racine Place Two (2) 6-inch valves on Clover Glen Drive Two (2) 6-inch valves on Clover Glen Drive Infrastructure and Development Services Public Utilities Department

7

8 Construction Schedule

9 Impacts to Residents Construction work will be done between 8 a.m. and 4 p.m. weekdays. Construction work will be done between 8 a.m. and 4 p.m. weekdays. Occasional closures of sections of Donneymorr Drive, Sunnyoak Drive, Shady Forest Drive, Glenpointe Drive, Glenox Lane, Kelp Lane, Racine Place, and Clover Glen Drive. Occasional closures of sections of Donneymorr Drive, Sunnyoak Drive, Shady Forest Drive, Glenpointe Drive, Glenox Lane, Kelp Lane, Racine Place, and Clover Glen Drive. Areas impacted will be fully restored. Areas impacted will be fully restored. Infrastructure and Development Services Public Utilities Department

10 Contact Information During regular business hours: Cindy Hutchens, Project Manager 813-209-3095 After Hours Emergency Line: 813-744-5600 Infrastructure and Development Services Public Utilities Department