1 RSRDC UNIT- II, AJMER

2 ORGANISATION CHART OF RSRDC UNIT-II, AJMER RE Sh ARE Sh ARE Sh ARE Sh Accountant Sh P.K.Arora ARE 1.Sh. Lokesh Gupte 2.Sh. Lalit Sharma 3. Sh. Ashish Sharma 4. Sh. Harsh Rai Vacant (Addl. Charge to Sh. Sunil jain

3 Financial Work Load in Unit S. No. Name of WorkClient Deptt.A& F Sanction Expenditure till date Balance Work ARE – I Sh. Lokesh Gupta 1Construction of ROB with approaches (Excluding railway portion) on Dholpur- Rajakhera road Km-3 on SH-2 PWD Construction of ROB with approaches at LC No. 472 (1305/6-8 Mania-Marena road) Jhansi-Agra Section. PWD ARE – II Sh. Lalit Sharma 1Construction of 2 lane ROB with approaches (excluding Railway portion) at MDR 37-A on Nagour-Basni Road in lieu of LC No. 63-C (On NH-89) PWD ARE – II ARE - IV Rs. In Lacs

4 S. No. Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work ARE – III Sh. Ashish Sharma 1Construction of ROB & approaches on Bhilwara -Chittorgarh BG Track at Bhilwara. (UIT Work) UIT Bhilwara (Rly.) ARE – IV Sh. Harsh Rai 1Construction of ROB & approaches on Phalodi-Mandal-Bhilwara road in lieu of LC No. 63-C PWD Construction of ROB on Manglana - Makrana road in lieu of LC No. 36 Kuchaman city Makrana section SH-2B PWD ARE – V Sh. Brijesh Mathur of Unit-I,Ajmer 1Construction of ROB in Km. 70 of Kishangarh -Roopangarh road SH-07 in lieu of LC No. 28 NWR. PWD Construction of ROB (excluding Railway portion) and approaches on Ajmer- Beawer road in lieu of LC No. 5A/2E PWD

5 Regional Pollution Control Board office, Bhilwara Completion Cost – Rs lacs Important Works Completed during last 5 years

6 Construction of ROB at Kishangarh, Ajmer Total Cost:Rs Crores Location:Kishangarh, Ajmer Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs Lacs Likely Completion date: (Depends on Railway work) Bottlenecks if any:Two nos span and finishing dependant on railway work Status of railway work:Sub structure work completed. Idle since last six months due to finalisation of drawing & design of super structure.

7 Construction of ROB at Saradhna, Ajmer Total Cost:Rs Crores Location:Beawar road, Ajmer Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs Lacs Likely Completion date: (Depends on Railway work) Bottlenecks if any:Gap slab connecting rly. portion and finishing dependant on railway work Status of railway work:Lay out & shifting of cable work in progress.

8 Construction of ROB at Bhilwara(UIT Work) Total Cost:Rs Crores Location:Bhilwara Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs + Rs lacs (Rly.) Likely Completion date: (Depends on Railway work) Bottlenecks if any:Two nos span and finishing dependant on railway work Status of railway work:Sub structure work completed. Super structure work in progress.

9 Construction of ROB at Mandal (Bhilwara) Total Cost:Rs Crores Location:Mandal, Bhilwara Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs Lacs Likely Completion date: (Depends on Railway work) Bottlenecks if any:Two nos span and finishing dependant on railway work Status of railway work:Sub structure work in progress.

10 Construction of ROB at Makrana Distt. - Nagour) Total Cost:Rs Crores Location:Makrana, (Distt.-Nagour) Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs. Likely Completion date: (Depends on Railway work) Bottlenecks if any:Shifting of electric lines & encroachments. Status of railway work:Work order placed. Work yet not started.

11 Construction of ROB at Nagour Total Cost:Rs Crores Location:Nagour Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs. Likely Completion date: (Depends on Railway work) Bottlenecks if any:- Status of railway work:Work order issued. Work yet not started.

12 Construction of ROB at Dholpur Total Cost:Rs Crores Location:Dholpur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs. Likely Completion date: (Depends on Railway work) Bottlenecks if any:- Status of railway work:Work order issued. Work yet not started.

13 Construction of ROB at Mania-Marena Road Total Cost:Rs Crores Location:Mania, Dholpur Date of Start:- Stipulated Date of Completion: - Expenditure till Date:Rs lacs. Likely Completion date: Bottlenecks if any:The present LC No. 472 is a part of Bye pass for ROB at LC No Hence traffic is to be bye passed at LC No. 473 which requires interlocking. Railway has agreed for interlocking & up gradation. Which shall be completed by Feb Revised A&F required amounting to Rs Crore Estimate Submitted to CE PWD through ACE Zone Bharatpur Status of railway work:Revised GAD pending at Railway part for approval, likely to be received in Dec. 2009’

14 Proposed New Works S. No.Name of WorkClient Deptt.ModeEstimated Cost 1Construction of Academic block at MLV Textile & Engineering College, Bhilwara MLVT, BhilwaraActual plusRs lacs 2Construction of Urban Co Operative bank at Shastri Nagar Bhilwara BUCB BhilwaraActual plusRs Lacs

15 THANKS