Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 May 2011 CSTS WG: CSTS WG: CSTS Specifications Framework RID Status Summary R1 Boulder 31 Oct 2011 Martin Karch.

Similar presentations


Presentation on theme: "1 May 2011 CSTS WG: CSTS WG: CSTS Specifications Framework RID Status Summary R1 Boulder 31 Oct 2011 Martin Karch."— Presentation transcript:

1 1 May 2011 CSTS WG: CSTS WG: CSTS Specifications Framework RID Status Summary R1 Boulder 31 Oct 2011 Martin Karch

2 2 May 2011 RID Status (30.10.2011)

3 3 May 2011 RIDs Implemented RID-IDTitleCommentAgreedStatus FF-02three-phase operation Annex E delivered (JVP) YImplemented TJR-13PDU ValidationYImplemented TJR-07 Easy-to-interpret diagnostic information YImplemented JVP-41 Data Processing procedure does not define Abort behaviour YImplemented JVP-03 Remove non-managed parameters from Annex H YImplemented JVP-76ASN.1 DirectiveQualifier Directive Id -> Published Identifier YImplemented JVP-78 multiple instances of BDD procedure YImplemented JVP-80 Additional changes in PROCESS-DATA operation YImplemented FMB-12BDD Procedure issues Figures deliveredto be checked Implemented

4 4 May 2011 RIDs Implemented RID-IDTitleCommentAgreedStatus JVP-81 ABORT and TERMINATION handling JVP to check if ‘TERMINATING’ issues already covered by TR- 13 YImplemented JVP-82 Typographical errors in Notification Proc. YImplemented JVP-83Terminology incorrectYImplemented JVP-84 Duration Type specification YImplemented TJR-19 Navigating our ASN.1 definitions to be checked Implemented YD-01 Requirements for Operation External types YImplemented YD-02Peer-Abort Diagnostic to be checked Implemented JVP-22 Expand Cyclic Report procedure Concepts JVP: “PublishedNames Concepts Sections - 2011-0531.docx.doc to be checked Implemented JVP-85Additional PD comments Based on JVPs presentation "AddtionalPROCESS- DATA_comments.ppt“ in Berlin (20.05) to be checked Largely Implemented Pages 11, 12, and 13: Not yet processed.

5 5 May 2011 RIDs To Be Processed RID-IDTitleProcessedAgreedImplem. JVP-47 Data Processing procedure too specific to Telecommand type of operation Berlin: low priority for forward procedures JVP-46 Ambiguous Resetting behavior Berlin: Depends on JVP-47 MG-01 Clear buffer consistency Berlin: To be processed together with JVP-47 TJR-20 User Side State Tables for CSTS FW To be discussed during Boulder meeting


Download ppt "1 May 2011 CSTS WG: CSTS WG: CSTS Specifications Framework RID Status Summary R1 Boulder 31 Oct 2011 Martin Karch."

Similar presentations


Ads by Google