NABARD – WDF Seventhipatty & vadavathur watershed Namakkal - District Full implementation phase Watershed Code No:4B1B3b3a1 &4B1B3b3a2 PFA - HEALDS.

Similar presentations


Presentation on theme: "NABARD – WDF Seventhipatty & vadavathur watershed Namakkal - District Full implementation phase Watershed Code No:4B1B3b3a1 &4B1B3b3a2 PFA - HEALDS."— Presentation transcript:

1 NABARD – WDF Seventhipatty & vadavathur watershed Namakkal - District Full implementation phase Watershed Code No:4B1B3b3a1 &4B1B3b3a2 PFA - HEALDS

2 WATER ABSORPTION TRENCH Total cum : 1440 Total amount :Rs Work completed : 1050 cum Balance work :390 cum WATER ABSORPTION TRENCH (BEFORE) WATER ABSORPTION TRENCH (AFTER)

3 WATER ABSORPTION TRENCH WATER ABSORPTION TRENCH (BEFORE)WATER ABSORPTION TRENCH (AFTER)

4 CONTOUR TRENCH Total cum :1203 Total amount : Contour trench work is completed CONTOUR TRENCH (BEFORE) CONTOUR TRENCH (AFTER)

5 CONTOUR TRENCH CONTOUR TRENCH (BEFORE)CONTOUR TRENCH (AFTER)

6 STONE GULLY PLUGS Total Rm : 66 Total amount : Stone Gully plugs work is completed STONE GULLY PLUGS (BEFORE) STONE GULLY PLUGS (AFTER)

7 STONE GULLY PLUGS STONE GULLY PLUGS (BEFORE)STONE GULLY PLUGS (AFTER)

8 LOOSE BOULDER STRUCTURE LOOSE BOULDERS STRUCTURE (BEFORE) LOOSE BOULDERS STRUCTURE (AFTER)

9 LOOSE BOULDER STRUCTURE Total cum : 90 Total amount : Loose boulder structure is completed LOOSE BOULDER STRUCTURE (BEFORE)LOOSE BOULDER STRUCTURE (AFTER)