1 LEED Cost & Benefits Habitat for Humanity of Broward Perry Ecton Executive Director Habitat for Humanity of Broward Mary Lou Bowman Cubbin Director of Construction Habitat for Humanity of Broward HFHB Sustainable & Affordable Homeownership Project Knight Plat Product Completion Est. 12-20-12

2 Habitat for Humanity of Broward was founded in 1983. We have built 336 homes to date.

3

4

5

6 LEED Certification Cost HFH of Broward USGBC Annual Membership………………$300 HFH of Broward USGBC S. FL. Chapter Membership……....$65 LEED Project Registration w/ USGBC, FTL-91………......…$150 Contract with a LEED AP/Field Agent.. look for a donation..……… …….. $0 Builder Fee paid to Provider (FSEC) and Field Agent…....$1,400 Preliminary rating $400 + PreDrywall Inspection $400 + Final Rating/Verification $600 Charrette Builder & green rater + 3 of the following: architect, landscape architect, mechanical engineer, civil engineer, building science professional…look for a donation... $0 HERS Rating………………………………………..……………$250 TOTAL, excluding materials………….$2,165

7 1. Integrated Project Planning 1.1Preliminary Rating – PREREQ 1.2Integrated Project Team 1.4Design Charrette 2. Durability Management Process 2.1Durability Planning – PREREQ 2.2Durability Management – PREREQ 3. Innovative or Regional Design Innovation & Design Process

8 1. Site Selection 3. Preferred Locations 3.2Infill 3.3Previously Developed 4. Existing Infrastructure 5. Community Resources / Transit 5.2Extensive 6. Access to Open Space Location & Linkages

9 1. Site Stewardship 1.1Erosion Controls During Construction – PREREQ 2. Landscaping 2.1No Invasive Plants – PREREQ 2.5Reduce Overall Irrigation Demand by at Least 20% 3. Local Heat Island Effect 4. Surface Water Management 4.1Permeable Lot 6. Compact Development / Density 6.2High (4.7 Acres Total) Sustainable Sites

10 2. Irrigation System 2.1High Efficiency Irrigation System 3. Indoor Water Use 3.1 High-Efficiency Fixtures & Fittings upgrade from 2.5 gpm to 2.0 gpm shower head……….…......$25 Water Efficiency Energy & Atmosphere 1. Optimize Energy Performance 1.1Performance of ENERGY STAR for Homes – PREREQ HERS rating, noted previously $250 6.Good HVAC Design PREREQ…………….upgrade to energy star thermostat….…….$50 8.Lighting Upgrade to CFL light bulbs..………...……….……......$28 11. Residential Refrigerant Management 11.1 Refrigerant Charge Test – PREREQ 11.2 Appropriate HVAC Refrigerants

11 1. Material-Efficient Framing 1.1Framing Order Waste Factor Limit – PREREQ 1.3Detailed Cut List & Lumber Order 2. Environmentally Preferable Products 2.1FSC Certified Tropical Wood – PREREQ 2.2Environmentally Preferable Products 3. Waste Management 3.1Construction Waste Management Planning – PREREQ Upgraded to SWS “Recycle” dumpster……………………..….$60 3.2Construction Waste Reduction Materials & Resources

12 2. Combustion Venting 2.1Basic Combustion Venting Measures – PREREQ 2.2Enhanced Combustion Measures 4. Outdoor Air Ventilation 4.1Basic Outdoor Air Ventilation – PREREQ 5. Local Exhaust 5.1Basic Local Exhaust – PREREQ Upgrade to energy star bathroom exhaust fans…..…..$232 Range hood vented to outside……………………....…..$226 6. Distribution of Space Heating & Cooling 6.1Room-by-Room Load Calculations – PREREQ Indoor Environmental Quality

13 7. Air Filtering 7.1Good – PREREQ upgrade A/C filter to Merv 8…………………………….$2 8. Contaminant Control 8.1Indoor Contaminant Control During Construction 10. Garage Pollutant Protection 10.1 No HVAC in Garage – PREREQ 10.4 Detached Garage or No Garage Indoor Environmental Quality (cont.)

14 1. Education of the Homeowner or Tenant 1.1Basic Operations Training – PREREQ 1.3Public Awareness added USGBC sign on site…………………………………$85 TOTAL, additional materials……………………………..……..$708 GRAND TOTAL………………………………………….….….$2873 SILVER LEED RATING Awareness & Education

15 Total Project Cost! $5.7 Million Value 4 Bedroom $111,000 3 Bedroom $109,000 1 st Mortgage 4 Bedroom $49,500 3 Bedroom $47,500 2 nd Mortgage 15-Year Grant Forgivable 3 or 4 Bedroom $54,500 3 rd Mortgage 5-Year Grant Forgivable 3 or 4 Bedroom $7,000 Average Monthly Payment $685 Includes: Principle, Taxes, Insurance and HOA