O. Beltramello – 14.06.2012. A brief reminder of the project status : Phase1 (July 2011 – March 2012): Development of several system prototypes: - test.

Similar presentations


Presentation on theme: "O. Beltramello – 14.06.2012. A brief reminder of the project status : Phase1 (July 2011 – March 2012): Development of several system prototypes: - test."— Presentation transcript:

1 O. Beltramello – 14.06.2012

2 A brief reminder of the project status : Phase1 (July 2011 – March 2012): Development of several system prototypes: - test a selection of non compressed (for AR) and compressed camera (for supervision), development of HW and SW (Novocaptis) - test a selection of audio systems, development of HW and SW (Novocaptis) - design a helmet enclosure for the camera and leds (Novocaptis) - PTU design compatible for the various audio systems and cameras (Prisma) - development of protocol to read the zigbee data from Mirion DMC2000 dosimeters (Prisma) - DAQ for audio/video/ sensors (Novocaptis, Prisma, CERN) - control system (CERN) - Procedure Visualizer software (Protvino, CERN) Done In progress Done In progress Done

3 Phase2 (May 2012 – December 2012): We need a supervision system operational and robust for LS1, Nov. 2012, maintenance period, 15 months of shutdown. We stage for few months the research about Augmented Reality. It will be resumed through the successfull ITN EDUSAFE project (probable kick off automn 2012): Collaboration: EPFL, INFN Roma 2, CERN, National Technical University Athens, Novocaptis, Prisma, Areva, DUTH, AUTH, TUM All what is developed during the second phase has to be compatible with the future ITN project. Main Responsibilities Phase 2: - Prisma - PTU + sensors HW and SW and DAQ system, dosimeter protocol - Novocaptis – Audio / video system HW and SW and DAQ system - CERN - detail design/ manufacturing drawings for helmet enclosure, helmet enclosure procurement, control system, head mounted display procurement