Presentation is loading. Please wait.

Presentation is loading. Please wait.

6/24/20101 The Uncontrolled Sites Program Presentation to the LD 1827 Stakeholders.

Similar presentations


Presentation on theme: "6/24/20101 The Uncontrolled Sites Program Presentation to the LD 1827 Stakeholders."— Presentation transcript:

1 6/24/20101 The Uncontrolled Sites Program Presentation to the LD 1827 Stakeholders

2 6/24/20102 Uncontrolled Sites Program  Program of last resort  Technical expertise - Remediation  Oversight of PRP actions.  Cost Recovery  Oversight of long term O&M programs.  Liaison with the EPA’s Superfund Removal Program.

3 6/24/20103 Mission  Clean-up Sites to protect Public Health & the Environment  Facilitate Economic Development

4 6/24/20104 Mission - Measures  Primary Measurements # Sites Clean-up/yr # Acres returned to productive use  Secondary Measurements Number of households exposed to contaminants Number of households with temporary mitigation Milestones reached at individual sites

5 6/24/20105 Traditional Funding  Bonds  Cost recovery from PRPs Owner / Operator Generator – Thousands for PBWO sites Transporter  Federal Grants

6 Primary Program Name Site Status (Primary - ICDB) In Review RemedialInvestigate O&M Referredout RemedialAction No FurtherAction Total USP VRAP Brwn Fld DOD Superfund Total

7 6/24/20107

8 8

9 9

10 10

11 6/24/201011

12 6/24/201012

13 6/24/201013

14 Uncontrolled Sites Fund State lead Sites Cost Recovery Clean-up

15 6/24/ Uncontrolled Sites Fund & Remediation Programs Uncontrolled Sites Fund State Lead Sites VRAP “RLF” & Insurance Brownfield Grant Match credible Enforcement Military Sites “all other” Unresolved Public Health Threats Unresolved Liability under CERCLA & USP Tort Claims Superfund Match X PRP Lead Sites

16 6/24/ For More Information  David Wright  ontrolledsites/index.htm ontrolledsites/index.htm  maps/index.htm#Google_Earth_Maps maps/index.htm#Google_Earth_Maps

17 6/24/ Parallel or combined Stakeholder Groups? 4 site solution May 2010 DEC 2010 DEC 2011 USP Revamp

18 6/24/ Parallel or combined Stakeholder Groups? May 2010 DEC 2010 DEC 2011 USP Revamp 4 site solution

19 6/24/ Parallel or combined Stakeholder Groups? 4 site solution Subgroup May 2010 DEC 2010 DEC 2011 USP Revamp Subgroup


Download ppt "6/24/20101 The Uncontrolled Sites Program Presentation to the LD 1827 Stakeholders."

Similar presentations


Ads by Google