Presentation is loading. Please wait.

Presentation is loading. Please wait.

EMCC 21 st Century Industry Providing Employment - Improving the Planet FUZINE Eco-Park.

Similar presentations


Presentation on theme: "EMCC 21 st Century Industry Providing Employment - Improving the Planet FUZINE Eco-Park."— Presentation transcript:

1 EMCC 21 st Century Industry Providing Employment - Improving the Planet FUZINE Eco-Park

2 Agenda Introduction – “A World Lead” Markets Products & Services Domestic, Commercial, Industrial Design, Construction & Management WS Atkins – profile & track record Benefits for Fuzime Creating Infrastructure Local work force Training & Health care Local Materials sources Timetable Summary

3 A World Lead Self Sufficient Eco-Industrial Parks Target : zero Carbon Emissions on Each Park Generating Carbon Credits Carbon Neutral Materials Supply (Aim) Affordable Eco-Building production Scalable sizing – Eco-Home to Commercial Target : zero electricity energy Mass production applied to Construction Turn-key Buildings, High tech fit out Principled Management developing local skills R&D for commercially viable Ecological Solutions Confidential & Copyright Ekološke Industrije d.o.o.

4 Markets Individuals Western Europe/North America: Large number of affluent individuals seeking both eco-friendly primary dwelling & holiday homes Commercial Private companies engaged in inner city urban renewal development programs Governments & United Nations UN sponsored programs for eco-housing & shelters Individual countries e.g. confidential, seeking accommodation for its citizens where protocol agreements are in effect

5 Products & Services Ecological Houses Core product: pre-fabricated ecological houses Environmentally friendly energy sources Circa. 1,000 ecological houses per annum Luxurious Homes & Villas Partial fit-out, up to fully fitted (ready to move in) Further options in the value added luxury market Commercial & Industrial Buildings Hotels, shopping/cafes, schools, hospitals Factories, offices Services Site Assessment, Design & Build, Turn-key delivery Finance for leasing or purchase Confidential & Copyright Ekološke Industrije d.o.o.

6 Eco Houses panels, glass & timber Werkhaus Park Villa - evening Note – ALL houses offered will be in sympathy with local architecture & culture

7 Eco Houses concrete & glass CSI Building Solutions Inc Note – ALL houses offered will be in sympathy with local architecture & culture Villa Toscana

8 Eco Houses timber & glass Holzbau Tassenbacher House Note – ALL houses offered will be in sympathy with local architecture & culture

9 Eco CommercialEurope Eco City project Hammarby - Sweden Note – ALL commercial buildings offered will be in sympathy with local architecture & culture

10 Eco CommercialAmerica Note – ALL commercial buildings offered will be in sympathy with local architecture & culture Kenosha Hospital - Wisconsin Spancrete

11 Eco CommercialAsia University building – Nanyang, Singapore Note – ALL commercial buildings offered will be in sympathy with local architecture & culture

12 Eco IndustrialEurope Hufhaus Design Note – ALL commercial buildings offered will be in sympathy with local architecture & culture

13 Eco IndustrialAmerica Note – ALL commercial buildings offered will be in sympathy with local architecture & culture Spancrete

14 Management Chart Batching Plant Re/Forestry Other Construction Panel Factory Water Tubes Eco Houses Steam Energy Management R & D Institute Unit A 5 Mw Unit B 15 Mw Biomass Rental Income Factories Management Offices Other Revenues Eco Electricity Receivables Eco Institute Steel Works Blocks Planting Of New Trees FUZINE Eco-Parkframework

15 Ecological Industrial Park Fuzine Site Requirement of at least 300,000 m 2 of land in existing industrial area for project viability Additional infrastructure to be built including rail side track to connect future EMCC site to sea port of Rijeka Phase I 10 factories & management building covering 80,000 m 2 of net useful building area PLUS Management Buildings Strong brand name partners providing machinery/training Design & Construction by Atkins No. 1 architectural & engineering firm in Europe and No. 3 in the world (see Atkins at the forefront of unique architecture - design & construction in sympathy with local cultural conditions

16 Batching Plant Purpose Strategic investment in order to build all the factories as well as the pre-fabricated Eco houses and buildings. Size 5 buildings, totalling 12,000 square metres Employees 400 employees of which all will be required to be up skilled Training provided by equipment manufacturers

17 Fuzine Eco-Park Hess Concrete Batching Plant

18 Fuzine Eco-Park Hess Concrete Block Machinery

19 Fuzine Eco-Park Schlosser Pfeiffer Concrete Pipe Machinery

20 Fuzine Eco-Park Biomass powered Steam Turbine Power Plant

21 Management Charles Bonissel – Chairman of EMCC 35 years consulting experience in trade and project structure finance. Alan Linger CFO and CEO Ex General Manager of Standard Bank London. Dr.Valdis Steins Chairman International The most decorated Latvian Citizen and specialist in prefabricated construction.

22 Management Zeljko Mauhar Vice Chairman Croatia Croatian partner. and Vice Chairman of the Group - ex Army High rank officer with United Nations. Daniel Blasik General Manager Croatian - Australian with studies in Finance ex ABN AMRO investment Banker in Sydney then consultant with DELOITE in Croatia Zagreb. John Batas - design specialist with a lot of experience in Government projects. Arsen Sarjkisian Sales Manager Responsible for Russia Federation and new Countries

23 Management George Koning - President of our new Ecological Institute of research and development. Previously Vice President of world wide association of alternative energy. Hugo Lin Congo – well versed in diplomatic studies and will be responsible for the Francophone countries in Africa, West India and French Polynesia, Tahiti. Galip Hussein - Marketing Manager ATKINS - the well known Architect, engineering and project management firm.No 1 in Europe and No 3 in the world size wise. Atkins is our technical advisors in this project.

24 R & D Institute Research & development Target : Improve production efficiency of EMCC program consistent with aim of zero carbon emissions Profitable operating independent unit Initially: X% of operating revenues of businesses in park to fund R & D Institute Long term: patents to supplant R & D Institute revenues

25 Funding Project Financing Initial consultation with bankers have indicated requirement of 20% equity participation for project to be bankable Accordingly, 20% equity and 80% loan finance is the initial financing target Project potentially subject to receipt of EU funds (name the programs) Carbon Credits EMCC is subject to receipt of carbon credits under the European trading emissions scheme (need name of trading emissions scheme?!) as a result of low/nil carbon emissions forecasted in the production process Per “The Economist” magazine, at 1 March 2007, carbon trading (EU ETS) was EUR 21.3

26 The Stakeholders Local Community Government, Region & Town participation Immediate training, employment, care & education Eco-Park Construction Atkins for Engineering & Architectural Consultancy Atkins General Electric, ABB for Steam Eco-Power General Electric Hess Group for Concrete Processing Hess Group Söderhamn Eriksson & Valutec for Wood Processing Söderhamn ErikssonValutec Weinig Group for Wood Engineering Weinig Group Volvo, Ponsse, & others for Machinery VolvoPonsse tbd for IT & Communications Operations Interest from MIT for Eco-R&D CollaborationMIT Joint Ventures under discussion for Phase 2 Confidential & Copyright Ekološke Industrije d.o.o.

27 Stakeholder – Atkins* Project Feasibility study Environmental Impact study Engineering & Architectural Consultancy For Phase 1 Eco-Park For Initial Customer Roll-outs Construction Project Management For Phase 1 onwards Confidential & Copyright Ekološke Industrije d.o.o. *http://www.atkinsglobal.com/http://www.atkinsglobal.com/

28 Project Phases Phase 1 – Project Design & Initial Build Biomass Steam Power Plant Concrete Batching Plants Wood Engineering Plant Phase 2 onwards Complete Phase 1 build out Factories, Management Building, R&D Institute Design & Build Phase 2 Factories Negotiate JV’s for Phases 3 & 4

29 Summary We are entering a time of Ecological Revolution Market interest for Commercial Eco-Solutions currently exceeds the world’s capacity to supply The Eco-Industrial Park concept has captured local imagination in Croatia & in Europe Financial Institutions at Government, Local and Industrial levels have expressed an interest The EMCC programme is ready for launch & development Confidential & Copyright Ekološke Industrije d.o.o.

30 And finally a Prefabrication is …. Confidential & Copyright Ekološke Industrije d.o.o. Light through the Oculus The dome of the Pantheon Concrete construction Rome (circa AD125)


Download ppt "EMCC 21 st Century Industry Providing Employment - Improving the Planet FUZINE Eco-Park."

Similar presentations


Ads by Google