:: WORLD HEADQUARTERS :: www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135 Organic Potash Corporation Inc. Shama & Apowah Site.

Similar presentations


Presentation on theme: ":: WORLD HEADQUARTERS :: www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135 Organic Potash Corporation Inc. Shama & Apowah Site."— Presentation transcript:

1 :: WORLD HEADQUARTERS :: | office: | fax: Organic Potash Corporation Inc. Shama & Apowah Site Surveys

2 :: S H A M A I N D U S T R I A L S I T E :: S H A M A I N D U S T R I A L S I T E C O M M E N T A R Y :: C O M M E N T A R Y :: Site is fairly level with apparent gentle incline west to east with fairly good drainage Site is fairly level with apparent gentle incline west to east with fairly good drainage Appears to drain to the north with northern boundary being the lowest and wettest Appears to drain to the north with northern boundary being the lowest and wettest Site sits downhill from, and adjacent to, ZoomLion Waste Disposal Facility Site sits downhill from, and adjacent to, ZoomLion Waste Disposal Facility No access road to available plots No access road to available plots Flora appears to be of high savannah type Flora appears to be of high savannah type Land has soft substrate structure Land has soft substrate structure Drive time to Takoradi Port 30 to 50 minutes depending on traffic in town Drive time to Takoradi Port 30 to 50 minutes depending on traffic in town 600 meters to main Accra Road 600 meters to main Accra Road 3rd class road into industrial site 3rd class road into industrial site

3 Available Plots Zeal Zoom Lion Zoom Lion Zoom Lion Zoom Lion S U R V E Y D E P A R T M E N T S H A M A I N D U S T R I A L S I T E P L A N | office: | fax: Road Work Required

4 Removal of dense vegetation over entire area (including large trees) Removal of dense vegetation over entire area (including large trees) 400 plus meters road construction needed to access two plots ($175k potential cost before land clearing costs) 400 plus meters road construction needed to access two plots ($175k potential cost before land clearing costs) Top ground surface is mostly soft wet laterite…tough work in last half of rainy season Top ground surface is mostly soft wet laterite…tough work in last half of rainy season :: S H A M A S I T E :: :: I M M E D I A T E W O R K R E Q U I R E D :: 400 meters to gain access to Water/Electricity 400 meters to gain access to Water/Electricity Topsoil will need to be removed and ground leveled Topsoil will need to be removed and ground leveled Zeal | office: | fax:

5 :: S H A M A I N D U S T R I A L S I T E :: :: S H A M A I N D U S T R I A L S I T E :: | office: | fax:

6 Western Boundary Available Plots Proposed Road :: S H A M A I N D U S T R I A L S I T E :: :: S H A M A I N D U S T R I A L S I T E ::

7 :: G H A N A C O C O A B O A R D S I T E :: :: G H A N A C O C O A B O A R D S I T E :: :: C O M M E N T A R Y :: :: C O M M E N T A R Y :: Excellent drainage Excellent drainage Low savannah zone flora Low savannah zone flora 0.6 kilometers – distance from New Ghana Cocoa Board 100,00 Tonnes Warehouse Complex to temporary site entrance 0.6 kilometers – distance from New Ghana Cocoa Board 100,00 Tonnes Warehouse Complex to temporary site entrance Site 150 to 200 meters from the 2 nd class road (mostly tarmac) between Apowah Township and on north pass the GCB site Site 150 to 200 meters from the 2 nd class road (mostly tarmac) between Apowah Township and on north pass the GCB site Water and electricity running along main road to GCB site from Apowah, within 200 meters from site Water and electricity running along main road to GCB site from Apowah, within 200 meters from site Gently rolling and sloping hill from north end of rectangular plot to south Gently rolling and sloping hill from north end of rectangular plot to south Elevation difference from north to south end 20 meters Elevation difference from north to south end 20 meters Land has a solid dry sandy sub-base structure Land has a solid dry sandy sub-base structure Takoradi Port travel time 20 minutes Takoradi Port travel time 20 minutes Can see GCB Warehouses from topmost elevation of site Can see GCB Warehouses from topmost elevation of site

8 Main Road to GCB Road Right - Away C O C O A B O A R D S I T E P L A N | office: | fax:

9 :: G H A N A C O C O A B O A R D S I T E :: :: I M M E D I A T E W O R K R E Q U I R E D :: Renovating and upgrading existing site temporary access…or Renovating and upgrading existing site temporary access…or Plotting and build new road along plotted access route (200 meters) Plotting and build new road along plotted access route (200 meters) Utility hookups Utility hookups Land clearing of mostly grass and shrubs Land clearing of mostly grass and shrubs Removal of topsoil Removal of topsoil Cut and fill for leveling Cut and fill for leveling

10 Northern boundary & road right-away :: G H A N A C O C O A B O A R D S I T E ::

11 GCB Warehouse Complex | office: | fax:

12 :: G H A N A C O C O A B O A R D S I T E :: | office: | fax:

13 Thank You | office: | fax: