Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Manegment (IENG419) Fall:(2010-2011) Research Assistants: Farhad Mousavi & Sadegh Niroomand.

Similar presentations


Presentation on theme: "Project Manegment (IENG419) Fall:(2010-2011) Research Assistants: Farhad Mousavi & Sadegh Niroomand."— Presentation transcript:

1 Project Manegment (IENG419) Fall:(2010-2011) Research Assistants: Farhad Mousavi & Sadegh Niroomand

2 Chapter 4 Assigning Resources to Activities If you followed previous chapters and created the project and also defined resources, so you are ready to assign the resources to the activities.

3 Assigning Resources to Activities Before starting to assign, for all tasks, from Task Information window, we should change the Task Type to Fixed Duration as you see here 1 2 3 4 5

4 Assigning Resources to Activities This table shows that which resources should be connected to the activities. No.ActivityResource 1Planning - 2Lining Labor 1, Engineer 1 3Excavation Loader, Bulldozer 4Grave Loader 5Molding1 Loader 6Armature1 Loader, Bar 7Molding2 Loader 8Armature2 Loader, Bar 9Concrete1 Loader, Cement 10Concrete2 Loader, Cement 11Curing1 - 12Opening the Mold1 Loader

5 Assigning Resources to Activities To start, we follow this order: 1 Select an activity 2

6 Assigning Resources to Activities Now in Assign Resources window, we can select resources to assign to the selected activity. 1 Select You can change units 2


Download ppt "Project Manegment (IENG419) Fall:(2010-2011) Research Assistants: Farhad Mousavi & Sadegh Niroomand."

Similar presentations


Ads by Google