PARKS AND RECREATION ADVISORY BOARD Trails And Greenways Committee Report Wednesday, January 16, 2013 7:30 PM TOWN OF MALABAR 2725 MALABAR ROAD MALABAR,

Similar presentations


Presentation on theme: "PARKS AND RECREATION ADVISORY BOARD Trails And Greenways Committee Report Wednesday, January 16, 2013 7:30 PM TOWN OF MALABAR 2725 MALABAR ROAD MALABAR,"— Presentation transcript:

1 PARKS AND RECREATION ADVISORY BOARD Trails And Greenways Committee Report Wednesday, January 16, :30 PM TOWN OF MALABAR 2725 MALABAR ROAD MALABAR, FLORIDA T&G Objectives / Areas of Responsibility Inventory, assess, document & promote Malabar trails & greenways Identify and address maintenance priorities Identify, prioritize and address new trail / trailhead grant opportunities Research, plan and recommend T&G enhancements with cost via P&R Bd. T&G Work Events – Sand Hill Trailhead Tune-Up Phase 1 – January 5, 2013 Phase 2 – January 26, 2013 T&G Committee Structure Standing Committee – continuing existence and function Meetings 2 nd Monday of each month agenda driven advertised with public welcome emphasis on casual open discussion among committee utilization of PC/ data display for map, chart, graph optimization 1

2 Trails and Greenways Committee Membership CHAIR:DREW THOMPSON MEMBERS:BOB WILBUR MURRAY HANN DICK KORN HANS KEMMLER COLLETTE BUFFALOE LIAISON:BOB SIEGMANN RECORDING SECRETARY:DEBBY FRANKLIN 2

3 TRAILS AND GREENWAYS COMMITTEE REGULAR MEETING MONDAY, JANUARY 14, :00 PM TOWN OF MALABAR 2725 MALABAR ROAD MALABAR, FLORIDA AGENDA A.CALL TO ORDER, PRAYER AND PLEDGE B.ROLL CALL C.ADDITIONS/DELETIONS/CHANGES D.CONSENT AGENDA 1.Approval of Minutes Regular Trails & Greenways (T & G) Meeting – Dec 10, 2012 F.PUBLIC: G.ACTION: H.DISCUSSION: 2.Update of Trail Conditions 3.Summarization of Trailhead #1 Tune-Up held 1/5/ Set Next Tune-Up Target / Date / Time 5.T & G Proposal Process via Parks & Recreation Board 6.Review of Trails & Greenways Grant & Tangible Project Priorities I.OLD/NEW BUSINESS: J.ADJOURNMENT 3

4 Al Tuttle Trail… from Boundary Canal Trail at Marie Street to Sand Hill Trailhead 1, is now paved and wetland bridge (below) is almost complete! 4

5 T&G Work Events – Sand Hill Trailhead Tune-Up – Phase 1 – January 5, Participants included: Marylee Bowen, Rod Buffaloe, Jim Buffaloe, Kyle Buffaloe, Hans Kemmler, Mike Schoolfield, Drew Thompson Expenditures totaled $ ($ remain in 2013 T&G budget) Repairs on the paddock gates: $89.73 on hardware and the hinges Herbicide for Brazilian Peppers, cleaning supplies, Gatorade, cups, ice: $

6 Paddock Latch TypicalPaddock Gate Typical Each gate had one hinge up and one hinge down, and the one pointing down was not providing any support. Also, when the hinges were moved before, the bolts that went through them were removed and the top and bottom corners of the gates were coming apart because they had only small nails holding them together. The eight paddock gates originally had the hinges near the top and bottom of the gates, and at some point, someone moved the hinges more toward the center (vertically) of the gate. These following before & after pictures and explanation of 1/5/2012 trailhead tune-up repairs on the paddock gates were provided by Hans Kemmler 1/7/2012 6

7 Paddock Latch FixedPaddock Gate Fixed 7

8 Paddock Gate Stop We used a car jack to lift each gate, removed the upside down hinge and drilled new holes for the hinge on the gate side after adjusting the gate height. We tightened al the existing bolts and bought new ones for the corners where the hinges used to be and installed them. Also, we added stops so that the gates hit the stop before pressure is put on the hinges. All eight paddock gates are now operational. Before we started, only one would close all the way! 8

9 These following are “after pictures” of 1/5/2012 trailhead tune-up tree trimming and were provided by Drew Thompson 9

10 10

11 11

12 12

13 T&G Work Events – Sand Hill Trailhead Tune-Up – Phase 2 – January 26,


Download ppt "PARKS AND RECREATION ADVISORY BOARD Trails And Greenways Committee Report Wednesday, January 16, 2013 7:30 PM TOWN OF MALABAR 2725 MALABAR ROAD MALABAR,"