Presentation is loading. Please wait.

Presentation is loading. Please wait.

City and County of Denver 2015 Capital Projects - Wastewater Thomas Blackman Engineer Supervisor.

Similar presentations


Presentation on theme: "City and County of Denver 2015 Capital Projects - Wastewater Thomas Blackman Engineer Supervisor."— Presentation transcript:

1 City and County of Denver 2015 Capital Projects - Wastewater Thomas Blackman Engineer Supervisor

2 Wastewater Capital Projects Management ‐ Advertisement Look Ahead 33rd Street Outfall (Arkins to Mtn Cement) $ 6,000,000 Summer rd Street Outfall (Arkins to Mtn Cement) $ 6,000,000 Summer 2015 –Large diameter storm sewer project. (8’ by 11’ box and 10’ diameter pipe) 2015 Annual Sanitary Sewer Improvements $ 3,000,000 Spring Annual Sanitary Sewer Improvements $ 3,000,000 Spring 2015 –Citywide sanitary sewer rehab project using Cured in Place Pipe materials Critical Sewer Replacement $ 4,000,000 Spring Critical Sewer Replacement $ 4,000,000 Spring 2015 –Citywide emergency response project for addressing critical storm and sanitary sewer issues. Contract based on unit price markup General Storm Sewer $ 3,000,000 Summer General Storm Sewer $ 3,000,000 Summer 2015 –Multiple location storm drainage project Citywide Concrete Repair, Phase 4 $ 1,800,000 Spring Citywide Concrete Repair, Phase 4 $ 1,800,000 Spring 2015 –Citywide curb, gutter, crosspan, panel and handicap ramp project. This will be 2 SBE defined pool projects around $900k each. Kennedy Detention Pond $ 2,500,000 Fall 2015 Kennedy Detention Pond $ 2,500,000 Fall 2015 –Large diameter storm sewer project to divert overflow from the existing detention pond to Cherry Creek during a 100 ‐ year storm event. 33rd Street Outfall (Mtn Cement to Lawrence St.) $ 6,000,000 Fall rd Street Outfall (Mtn Cement to Lawrence St.) $ 6,000,000 Fall 2015 Large diameter storm sewer project. (8’ by 11’ box and 10’ diameter pipe) Large diameter storm sewer project. (8’ by 11’ box and 10’ diameter pipe) 2016 General Storm Sewer $2,000,000 Winter General Storm Sewer $2,000,000 Winter 2015 –Multiple location storm drainage project.

3 33rd Street Outfall (Arkins to Mtn Cement)

4 Kennedy Ball Field Detention

5 33rd Street Outfall (Mtn Cement to Lawrence St.)


Download ppt "City and County of Denver 2015 Capital Projects - Wastewater Thomas Blackman Engineer Supervisor."

Similar presentations


Ads by Google