Presentation is loading. Please wait.

Presentation is loading. Please wait.

Infrastructure Responses to SDPs Evaluation of Priority Areas (“Priority Areas” – Released for Development 2010-2015) July 2009.

Similar presentations


Presentation on theme: "Infrastructure Responses to SDPs Evaluation of Priority Areas (“Priority Areas” – Released for Development 2010-2015) July 2009."— Presentation transcript:

1 Infrastructure Responses to SDPs Evaluation of Priority Areas (“Priority Areas” – Released for Development ) July 2009

2 Infrastructure Responses to SDPs Evaluation of Priority Areas Spatial Development Plan

3 Mpumalanga KwaXimba Bartletts Estate Cato Ridge / Harrison Flats Hammarsdale Shongweni Bridge City Canelands Cornubia Dube Trade Port Tongaat Residential iQadi Redcliffe Molweni Fredville Tongaat Industrial Zwelibomvu Hillcrest Craigieburn Umgababa Lovu Inwabi Folweni Adam’s Mission Amanzimtoti Umlazi Infrastructure Responses to SDPs Evaluation of Priority Areas Priority Areas

4 Infrastructure Responses to SDPs Evaluation of Priority Areas North Bridge City Tongaat Residential Redcliffe Cornubia Tongaat Industrial Dube Trade Port Canelands Green: Development can, in principle, occur immediately, as there is capacity available Orange: Development can take place following some “simple” interventions Red: Lack of infrastructure will be a “showstopper”

5 Infrastructure Responses to SDPs Evaluation of Priority Areas North Bridge City Tongaat Residential Redcliffe Cornubia Tongaat Industrial Dube Trade Port Canelands 95 0 Tongaat Residential R123m 18 0 Sewer: Orange indicates “Simple” Interventions required to release development. Total sewer infrastructure cost for full development footprint = R95m Water: Red indicates lack of water infrastructure will be a “Showstopper” to release of development Total water infrastructure cost for full development footprint = R18m Roads: Green indicates no additional bulk road infrastructure required to release development. Total additional bulk roads infrastructure cost for full development footprint = R0m Electricity: Green indicates no additional bulk electricity infrastructure required to release development. Total additional bulk electricity infrastructure cost for full development footprint = R0m Red Outline indicates overall infrastructure index of “Showstopper”. R123m represents total infrastructure cost to service full development footprint

6  Easy wins- infra capacity present for devt up to a cut-off after which high costs kick in  Rates Return/Infra Spend  Social Rank  Economic Rank  Revenue Generating vs Non-revenue generating land uses. Bringing in ratios.

7 Infrastructure Responses to SDPs Evaluation of Priority Areas North Bridge City Tongaat Residential Redcliffe Cornubia Tongaat Industrial Dube Trade Port Canelands 95 0 Tongaat Residential R123m 18 0 Bridge City Redcliffe Cornubia 0 0 Tongaat Industrial R0m Dube Trade Port – Phase A R289m Dube Trade Port – Phase B R863m Dube Trade Port – All Phases R1 152m Canelands– Phase A R45m Canelands– Phase B R14m Canelands– All Phases R59m Redcliffe R73m Cornubia– Phase A R209m Cornubia– Phase B R459m Cornubia– All Phases R668m Bridge City R60m 0 60

8 Infrastructure Responses to SDPs Evaluation of Priority Areas Outer West Zwelibomvu Bartletts Estate ShongweniHammarsdale Mpumalanga Hillcrest Molweni iQadi Fredville KwaXimba Cato Ridge / Harrison Flats Cato Ridge – Phase A R168m (w/o Eskom) 68 Eskom Cato Ridge – Phase B R710m (?) Cato Ridge – Phase C R5 090m (?) Cato Ridge – Phase D R84m (?) Cato Ridge – All Phases R6 052m (?) (w/o Eskom) 112 Eskom (?) Bartletts Estate R328m (w/o Eskom) 30 Eskom (?) 0 0 KwaXimba R4m (w/o Eskom) 4 Eskom (?) 92 0 Fredville R104m (w/o Eskom) 12 Eskom (?) Hammarsdale R187m (w/o Eskom) 30 Eskom (?) 0 10 Mpumalanga R10m (w/o Eskom) 0 Eskom (?) 0 0 Molweni R42m Zwelibomvu R75m iQadi R15m Hillcrest R21m Shongweni - Phase A R354m (w/o Eskom) 0 Eskom(?) 21 0 Shongweni - Phase B R21m Shongweni – All Phases R375m (w/o Eskom) 0 Eskom (?)

9 Infrastructure Responses to SDPs Evaluation of Priority Areas South Amanzimtoti Inwabi Craigieburn Golokodo Lovu Umgababa Umbumbulu Umlazi 0 0 R0m Inwabi R23m Golokodo R61m Umbumbulu R38m Amanzimtoti R0m Lovu R55m Umgababa R45m (w/o Eskom) 12 Eskom (?) Craigieburn – Phase A R117m (w/o Eskom) 12 Eskom (?) 6 0 Craigieburn – Phase B R34m Craigieburn – Phase C R24m Craigieburn – All Phases R175m (w/o Eskom) 40 Eskom (?)

10 Infrastructure Responses to SDPs Evaluation of Priority Areas (“Priority Areas” – Released for Development ) July 2009


Download ppt "Infrastructure Responses to SDPs Evaluation of Priority Areas (“Priority Areas” – Released for Development 2010-2015) July 2009."

Similar presentations


Ads by Google