US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator.

Similar presentations


Presentation on theme: "US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator."— Presentation transcript:

1 US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator / Sustainability Program Manager Operations Division Technical Operations Branch Portland District

2 BUILDING STRONG ® PORTLAND DISTRICT 2 NWD Corps Missions  Navigation  Flood Damage Reduction  Restoring Ecosystems  Hydropower  Wetland / Waterway Regulation  Recreation

3 BUILDING STRONG ® PORTLAND DISTRICT 3

4 BUILDING STRONG ® PORTLAND DISTRICT 4

5 BUILDING STRONG ® PORTLAND DISTRICT 5 Major Oil Sources: Kaplan Runner Up to 7,000 gal.

6 BUILDING STRONG ® PORTLAND DISTRICT 6 Governors (Up to 4000 gallons)

7 BUILDING STRONG ® PORTLAND DISTRICT 7 Transformers (Up to 16,000 gallons each)

8 BUILDING STRONG ® PORTLAND DISTRICT 8 Oil Storage Rooms (Up to 200,000 gallons per dam)

9 BUILDING STRONG ® PORTLAND DISTRICT 9 Navigation Locks

10 BUILDING STRONG ® PORTLAND DISTRICT 10 Navigation Locks (Up to a 1000 gallons)

11 BUILDING STRONG ® PORTLAND DISTRICT 11 Surface Flows – Dam Myths

12 BUILDING STRONG ® PORTLAND DISTRICT 12 Fishways

13 BUILDING STRONG ® PORTLAND DISTRICT 13 Oil Spill Prevention  Containment Systems  Sumps / Oil Water Separators  SPCC Plans

14 BUILDING STRONG ® PORTLAND DISTRICT 14 Spill Preparedness  Training  Drills  Partnering w/ EPA, WDOE, DEQ  District IMT support ► Operations, Planning, Safety, PAO  Contractor Response Using USCG BOAs

15 BUILDING STRONG ® PORTLAND DISTRICT 15 Spill Response - Reporting  Commanders Intent: “Projects shall report the potential or known quantity of materials spilled, as quickly as possible, and update immediately if information changes.”  Corps policy is to report every spill.  POC at each Project is the Control Room ► Listed in GRPs

16 BUILDING STRONG ® PORTLAND DISTRICT 16 Mid-Columbia Challenges  Corps needs to know about spills to protect the fish ladders  Navigation Locks  Mid-Columbia GRP

17 BUILDING STRONG ® PORTLAND DISTRICT 17 Questions? Contact Info: Ken Duncan