1 2009 versus 2012 IECC Maryland Affordable Housing Coalition June 26th, 2012

2 2009 versus 2012 IECC Overview Reading the Code on Your Own Compliance Paths Low-rise Construction (Residential Code) – Envelope, Air-sealing, Mechanical Mid-rise Construction (Commercial Code) – Envelope, Air-sealing, Mechanical, Electrical, Extras 2 © 2011 Steven Winter Associates, Inc. All rights reserved

3 2009 versus 2012 IECC Some aspects of 2012 have been relaxed Opportunities exist to cost-effectively implement aspects of 2012 The 2012 is ~ 10-15% more efficient than 2009 The 2012 is ~ 30% more efficient than 2006 3 © 2011 Steven Winter Associates, Inc. All rights reserved

4 2009 versus 2012 IECC Reading the Code Must read chapter by hierarchy – Understand each section by its context – Like finding the best “grape” of knowledge 4 © 2011 Steven Winter Associates, Inc. All rights reserved Residential ChapterCommercial Chapter 2009 IECCChapter 4Chapter 5 2012 IECCChapter R4Chapter C4

5 2009 versus 2012 IECC Reading the Code 5 © 2011 Steven Winter Associates, Inc. All rights reserved Section 401: Intro Section 402 Section 403 Section 404 Section 405 402.2 402.4 402.1 402.3 402.4.1 Building Thermal Envelope: Air-sealing

6 2009 versus 2012 IECC Two Generic Compliance Methods to either code 6 © 2011 Steven Winter Associates, Inc. All rights reserved Mandatory Residential Measures Prescriptive Pathway Performance Pathway OR

7 2009 versus 2012 IECC Two Generic Compliance Methods to either code 7 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Pathway Performance Pathway Envelopes Prescriptive By Component Performance By Component UA- Alternative Mandatory Residential Measures

8 2009 versus 2012 IECC Low-Rise, Wood-Framed Construction – Envelopes: Prescriptive by Measure 8 © 2011 Steven Winter Associates, Inc. All rights reserved

9 2009 versus 2012 IECC Low-Rise, Wood-Framed Construction – Envelopes: Performance by Measure 9 © 2011 Steven Winter Associates, Inc. All rights reserved

10 2009 versus 2012 IECC Low-Rise, Wood-Framed Construction – Envelopes: Performance by Measure 10 © 2011 Steven Winter Associates, Inc. All rights reserved If already using blown ceiling insulation and roof/ ceiling trusses are 24” O.C., then the project is nearly meeting this requirement. Only ½” extra needed.

11 2009 versus 2012 IECC Low-Rise, Wood-Framed Construction – Envelopes: UA Alternative Compliance – Can exceed insulation on a component to trade- off for another – Example: 1000 Sqft House, over crawlspace 11 © 2011 Steven Winter Associates, Inc. All rights reserved ComponentProposed WallsR-13 CeilingR-60 FloorR-30 WindowsU-0.31 2012 IECC R-20 R-48 R-19 U-0.35 Surface Area 1040 1000 150 ComponentProposed UACode UA Walls8559 Ceiling1726 Floor3547 Windows4753 Total183185

12 2009 versus 2012 IECC Two Generic Compliance Methods to either code 12 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Pathway Performance Pathway Mandatory Residential Measures OR

13 2009 versus 2012 IECC Low-Rise, Wood-Framed Construction – Performance “Whole” building: Includes heating, cooling, and hot water LOADS. – HVAC efficiencies do not improve performance approach results – Variety of available energy models: commercial and public RESCheck (free) EnergyGauge REMRate 13 © 2011 Steven Winter Associates, Inc. All rights reserved

14 2009 versus 2012 IECC Air-sealing 14 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Pathway Performance Pathway Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mandatory Items Testing Mandatory Residential Measures

15 2009 versus 2012 IECC Locations for Air-Sealing: – Any two separate materials at boundary conditions have gaps that will leak air 15 © 2011 Steven Winter Associates, Inc. All rights reserved

16 2009 versus 2012 IECC Air-sealing differences 16 © 2011 Steven Winter Associates, Inc. All rights reserved

17 2009 versus 2012 IECC Air-sealing testing methodology, standard home 17 © 2011 Steven Winter Associates, Inc. All rights reserved Negative Pressure

18 2009 versus 2012 IECC Air-sealing testing methodology 18 © 2011 Steven Winter Associates, Inc. All rights reserved

19 2009 versus 2012 IECC Air-sealing testing methodology, multifamily home 19 © 2011 Steven Winter Associates, Inc. All rights reserved Negative Pressure

20 2009 versus 2012 IECC Air-sealing methods 20 © 2011 Steven Winter Associates, Inc. All rights reserved

21 2009 versus 2012 IECC Air-sealing methods 21 © 2011 Steven Winter Associates, Inc. All rights reserved

22 2009 versus 2012 IECC Mechanical Measures 22 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Pathway Performance Pathway Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mandatory Items Testing Mechanical Duct Leakage Air-Handler Leakage Piping Mandatory Residential Measures

23 2009 versus 2012 IECC Mechanical Measures 23 © 2011 Steven Winter Associates, Inc. All rights reserved

24 2009 versus 2012 IECC Mechanical Measures 24 © 2011 Steven Winter Associates, Inc. All rights reserved

25 2009 versus 2012 IECC Mechanical Measures, Duct Leakage 25 © 2011 Steven Winter Associates, Inc. All rights reserved

26 2009 versus 2012 IECC Lighting High Efficiency = CFLs or – 60 lumens per watt for lamps over 40 watts – 50 lumens per watt for lamps btwn 15-40 watts – 40 lumens per watt for lamps btwn <15 watts 26 © 2011 Steven Winter Associates, Inc. All rights reserved

27 2009 versus 2012 IECC Commercial Code (4 Stories and Taller) 27 © 2011 Steven Winter Associates, Inc. All rights reserved

28 2009 versus 2012 IECC Code Organization 28 © 2011 Steven Winter Associates, Inc. All rights reserved Mandatory Commercial Measures Prescriptive Performance Air-sealing Mechanical Additional Efficiency OR Lights

29 2009 versus 2012 IECC Envelopes 29 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Performance Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mechanical Additional Efficiency Mandatory Commercial Measures Lights

30 2009 versus 2012 IECC Envelopes 30 © 2011 Steven Winter Associates, Inc. All rights reserved

31 2009 versus 2012 IECC Air-sealing 31 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Performance Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mechanical Additional Efficiency Mandatory Commercial Measures Lights

32 2009 versus 2012 IECC Air-sealing 32 © 2011 Steven Winter Associates, Inc. All rights reserved

33 2009 versus 2012 IECC Envelope 33 © 2011 Steven Winter Associates, Inc. All rights reserved

34 2009 versus 2012 IECC Mechanical Systems 34 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Performance Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mechanical Commissioning Min HVAC Performance Additional Efficiency Mandatory Commercial Measures Lights

35 2009 versus 2012 IECC Mechanical Systems 35 © 2011 Steven Winter Associates, Inc. All rights reserved

36 2009 versus 2012 IECC Commissioning 36 © 2011 Steven Winter Associates, Inc. All rights reserved

37 2009 versus 2012 IECC Commissioning 37 © 2011 Steven Winter Associates, Inc. All rights reserved

38 2009 versus 2012 IECC Commissioning 38 © 2011 Steven Winter Associates, Inc. All rights reserved

39 2009 versus 2012 IECC Lighting 39 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Performance Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mechanical Commissioning Min HVAC Performance Additional Efficiency Lights Mandatory Commercial Measures

40 2009 versus 2012 IECC Lighting 40 © 2011 Steven Winter Associates, Inc. All rights reserved

41 2009 versus 2012 IECC Lighting – “Bulbs” not Fixtures – Hole in 2009 allowed exterior lighting to be irrelevant for high-rise buildings 41 © 2011 Steven Winter Associates, Inc. All rights reserved

42 2009 versus 2012 IECC Lighting 42 © 2011 Steven Winter Associates, Inc. All rights reserved Prescriptive Performance Envelopes Prescriptive By Component Performance By Component UA- Alternative Air-sealing Mechanical Commissioning Min HVAC Performance Additional Efficiency Lights Performance HVAC Performance Lighting Renewables Mandatory Commercial Measures

43 2009 versus 2012 IECC Additional Efficiency – Performance HVAC 43 © 2011 Steven Winter Associates, Inc. All rights reserved OR

44 2009 versus 2012 IECC Additional Efficiency – Performance Lighting 44 © 2011 Steven Winter Associates, Inc. All rights reserved OR

45 2009 versus 2012 IECC Additional Efficiency – Performance Lighting 2kW system costs about $11,000 before rebates 45 © 2011 Steven Winter Associates, Inc. All rights reserved

46 2009 versus 2012 IECC Questions? 46 © 2011 Steven Winter Associates, Inc. All rights reserved


Download ppt "2009 versus 2012 IECC Maryland Affordable Housing Coalition June 26th, 2012."

Similar presentations


Ads by Google