SCHEDULING Adil Abdalla March 2011. Scope Cost Performance Service Provisions Services or Products to be Delivered Service Provisions Services or Products.

Similar presentations


Presentation on theme: "SCHEDULING Adil Abdalla March 2011. Scope Cost Performance Service Provisions Services or Products to be Delivered Service Provisions Services or Products."— Presentation transcript:

1 SCHEDULING Adil Abdalla March 2011

2 Scope Cost Performance Service Provisions Services or Products to be Delivered Service Provisions Services or Products to be Delivered Timeline & Milestones Durations till Delivery is Done Timeline & Milestones Durations till Delivery is Done Remuneration Cost of Services or Products Remuneration Cost of Services or Products Quality of Work Undertaken Criteria of Processes Quality of Work Undertaken Criteria of Processes What When How Much $ How

3 Productivity Activity Precedent Activity Ascendant Activity Input Output Manpower Tools & Equipments Technology Work Environment Laws & Standards Volume

4 AABB KPI A KPI B Activity Over Nod - AON Activity Over Arrow - AOA 30 Days Task 21 Days 33 Days Operational Focus Strategic Focus Finish to Start components Milestones & Deliverables Management of Resources Management of Delivery Productivity is the Unit multiplied by Volume or Quantities

5 F E H A J A : C = 12 D CG B C : D = 37 D : E = 8 D : G = 15 E : F= 17 G : F = 5 G : B = 33 F : L = 22 E : H = 15 H : J = 9 J : B = 5

6 A : C = 12 C : D = 37 D : E = 8 D : G = 15 E : F= 17 G : F = 5 G : B = 33 F : J = 22 E : H = 15 H : J = 9 J : B = 5 E B A GDC H F J 12 3715 33 17 8 5 9 15 522

7 B A GDC 12 3715 33 B A GDC F J 12 3715 5 522 E B A DC F J 12 37 17 8 522 E B A DC H J 12 37 8 9 15 5 Scenario 1 = 97 Scenario 2 = 101 Scenario 3 = 96 Scenario 4 = 86

8 High Scheduling Cost Conventional Scheduling Cost Optimum Scheduling Cost RelaxCrash TIME Shortest Possible Time Cost

9 Time Actual Planned A B Earned ValueEV=% CompletionXBAC Budget At CompletionBAC=Project Budget Actual CostAC=Cost of Work-Done Planned ValuePV=Budgeted Cost of Work-Scheduled Estimates @ CompletionEAC=AC/% Completion Schedule VarianceSV=EV-PV WBS Scheduling

10 Targets: 1.Ousting the current President 2.Approving a National Transformation Roadmap Optional: 3. Reforming the Constitution (amended or rewritten) 4. Purify the Assembly (legally- adjusted or reelected) Targets: 1.Ousting the current President 2.Approving a National Transformation Roadmap Optional: 3. Reforming the Constitution (amended or rewritten) 4. Purify the Assembly (legally- adjusted or reelected) Durations for processing are extracted either from current constitution or bylaws.. Or You may seek expert judgments to advise on any supporting information.. Durations for processing are extracted either from current constitution or bylaws.. Or You may seek expert judgments to advise on any supporting information.. Kindly: 1.Calculate the CP Critical Path 2.Advise on various correlated scenarios Kindly: 1.Calculate the CP Critical Path 2.Advise on various correlated scenarios The project ONLY addresses the anxiety of the Egyptian people and int'l audiences on the anticipated timeframe to bring the country from concurrent chaotic situation into an order.. This is a major demand locally, regionally and globally as well.. The project starts at this current date, with its circumstances, constraints and controlled assumptions The project ONLY addresses the anxiety of the Egyptian people and int'l audiences on the anticipated timeframe to bring the country from concurrent chaotic situation into an order.. This is a major demand locally, regionally and globally as well.. The project starts at this current date, with its circumstances, constraints and controlled assumptions

11 Temp Authority New President New President Constitutional Changes New Assembly New Assembly Road Map New President New President Constitutional Changes New Assembly New Assembly Road Map New President New President Road Map

12 No.ActivityDuration AOusting the President0 BFormation of Temporary Authority14 CRun Constitution Changes or make New30 DReferendum on Constitution10 EAssembly Campaigning, including Election process90 FMobilization of New Assembly30 GPresident Campaigning, including Election Process60 HMobilization of New President20 JProducing National Roadmap100

13 Temp Authority New President Constitution Changes New Assembly Road Map ABGHCDEFJ=354 Temp Authority New President Constitution Changes New Assembly Road Map ABGHCDEFJ=354 Temp Authority Constitution Changes New Assembly Road Map ACDEFJ=274 Temp Authority Constitution Changes New Assembly Road Map ACDEFJ=274 Temp Authority Constitution Changes New President Road Map ABCDGHE=234 Temp Authority Constitution Changes New President Road Map ABCDGHE=234 Temp Authority New President Road Map ABGHJCDEF=194 Temp Authority New President Road Map ABGHJCDEF=194 A B D C G H F E J 0 60 14 30 10 20 30 100 90