2  ESMF ensure that schemes to be designed and implemented by the Government are environmentally sound, socially acceptable and comply with the national regulatory and WB policy frameworks.

3  Repair of PCC Street behind Post office Masdjid Aabe Shifa and links Shadara UC-02 Lahore PP137  Special Repair of main Road Niaz Pura Karam Nagar and Masoom Shah Road in UC-13  Repair of various streets, PP-139  Repair of temple Road Safan Wala Chowk towards Ghous Bakery to Abid Market Lahore  Special Repair for Main Road from Neelem Cinema to Iqbal Road, Lahore  Special Repair for PCC Shah Road Haider Town Bhaman Village in UC-14, Lahore  Special Repair for Main Road Asif Colony in UC-37, Lahore  Special Repair for Various Streets in PP-145, Lahore  Special Repair for PCC of Road ideal Home kotly Peer Abdul Rehman Lahore  Special Repair for PCC of Streets in Railway Headquarter Colony in PP-147, Lahore  Repair of Dak Khanay Wali Gali & Link Gulfisha Colony NAWA Kot, Lahore 

4  Repair of various streets, PP-145  Repair of various streets, PP-150  special repair of roadAmin Pan Shop to Punjab Press ground & Masjid Ahle-Hadis To Chowk Makhdoom Abad in UC-135, PP-153, Lahore  Special Repair estimate for Road from Naveed Haider Chowk towards Taj Chowk in Baghrian  Special Repair of PCC from Chachu Wali School to Col. Wali Mosque Street in PP-155, lahore  Special Repair for PCC of Main Gulshan Colony to Ali Park and Links in PP-156, lahore  Special Repair Estimate of PCC of Streets adjoining Masjjid Gulzare Madina Shah Jutt Poultry Farm Stop and Main Street Rehman Pura in PP- 157, lahore  Special Repair Estimate for Carpeting of Road Portion wara to chabba village in PP-158, Lahore  Special repair estimate for repair of road from Defence road to Halloki Village PP-159, lahore.  Special Repair Estimate for Repair of road from Ferozepur road Khalid colony PP-160 Lahore  special repair of Road from Manga Road to Kamaran da Warah, Lahore

5 SCREENING ESMF IMPLEMENTATION PROCESS First step of the environmental and social management procedure. Each scheme during its preparation stage will be screened with respect to environmental and social

6

7 CategorizationClassification verses Impacts E-1Schemes that are expected to cause major environmental impacts E-2 Schemes that are expected to cause moderate environmental impacts E-3 Schemes that are expected to cause negligible environmental impacts hen be termed as environmentally benign” S-1 Schemes that will impact more than 40 households and are expected to cause significant negative social consequences S-2Schemes that will impact less than 40 households and are expected to cause significant negative social consequences affecting local inhabitants S-3Schemes are not expected to cause adverse significant social impacts

8 A. Environment Assessment B. Social Assessment E-1 E-2 E-3 S-3 S-2S-1 ESMP

9  For each scheme with E2 category, The Environmental and Social Management Plan (ESMP) was prepared according to the World Bank Policy Guidelines; environmental and social laws; and policies of Government of Punjab (GoPb).  There were 22 no. of schemes for which ESMPs were prepared and categorized as E-2. All ESMPs were enclosed in bidding documents.  For E-3 schemes, there were 101 schemes having negligible impacts.

10 Name of the project: Executing Agency/DAs: Location of the project: Nature of the project: Cost of the project: Nature of the area: Project description: Distance from residential area:

11

12  ESMP’s of 22 of schemes have been approved by DG, EPA

13 During the scheme implementation, the suggested mitigation measures in the ESMP were implemented. For effective implementation, consecutive monitoring was conducted Lab. Analysis were carried out from EPD certified Laboratory.

14

15

16 Capacity Building Sessions were arranged for:  Regarding orientation to ESMPs  Executing body  Contractors