Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scottish Water Always serving Scotland BATHING WATERS Kerry Davidson.

Similar presentations


Presentation on theme: "Scottish Water Always serving Scotland BATHING WATERS Kerry Davidson."— Presentation transcript:

1 Scottish Water Always serving Scotland BATHING WATERS Kerry Davidson

2 Wastewater Treatment Works35 Pumping Stations236 Overflows & Outfalls136 Bathing Waters & SW Assets SW Bathing Water Assets 82 Designated Bathing Waters 70 Have Potential to be Influenced by SW Assets Internal SW BW Targets

3 Pre Season Preparation Pre-Pre Season Inspections –Internal SW Inspections –Feb/March –Issues Identified & Risk Scored –>400 Inspections Prior to BS 2010 –State of Readiness Report to RMG Pre Season Inspections –Joint Inspections with Local SEPA Teams –April/ Mid May

4 During the Season Results – BW Mailbox – Early Warning of Fails – Results collated and analysed RCA’s –Mandatory Fails –Near Miss Samples (>1600 FC) –Out of the Norm Results Mid Season Joint Inspections with Local SEPA Teams Joint Failure Investigations with Local SEPA Teams

5 Internal BW Reporting State of Readiness Report Weekly Report to Internal Stakeholders Monthly Report to Regulatory Management Group Ongoing Risk Tracking & Reporting Internal End of Season Bathing Water Report

6 BW Stakeholder Engagement Scottish Government Local SEPA –Joint BW Inspections –Liaison Meetings –EPI & Ops Notifications National SEPA –Joint SW/SEPA BW Grp –Improve Awareness of BW Compliance, Investment & Emerging Research BW Review Panel –Provide Information on SW Assets –Panel Member Keep Scotland Beautiful –Blue Flag Jury –Beach Managers Forum

7 Investment to SW Assets BW Improvements SR06 (2006-2010) –Existing Bathing Water Directive –Portobello, Meadowhead & Stevenson –53 UIDs Improved –Approx £20m SR10 (2010-2015) –Existing Bathing Water Directive –Meadowhead & Stevenson SR06 Carry Over –17 UIDs –Approx £60m SR10 (2010-2015) –Revised Bathing Water Directive ‘Sufficient’ Status –27 Studies for Build by Mar 2015 –10 Studies for Build by Mar 2020 –Estimated cost £80m

8 Thank You For Listening Kerry.davidson@scottishwater.co.uk Any Questions?


Download ppt "Scottish Water Always serving Scotland BATHING WATERS Kerry Davidson."

Similar presentations


Ads by Google