ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : egcoegypt.com More than twenty years of experience.

Similar presentations


Presentation on theme: "ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : egcoegypt.com More than twenty years of experience."— Presentation transcript:

1 ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : www.egcoegypt.com Email : egco @ egcoegypt.com More than twenty years of experience

2 ENG.ABDEL MOUTY AMER. ENGINEER GENERAL CON.CO.(EGCO): EGCO, OUR COMPANY, HAS BEEN ESTABLISHED IN 1985, BY A VERY HIGH QUALIFIED GROUP OF CIVIL, MECHANICAL, ELECTRICAL AND ARCHITECTURAL ENGINEERS. WE HAVE A VERY GOOD EXPERIENCE OVER 20 YEARS IN THE CONSTRUCTION OF PROJECTS FOR WATER SUPPLY AND WASTE WATER FACILITIES. WE ARE WORKING HARD TO KEEP A GREAT COORDINATION BETWEEN OUR PROFESSIONAL EMPLOYEES AND THE MANAGEMENT OF OUR DEPARTMENTS, MAINTAINING THE HIGHTEST STANDARD OF QUALITY. SO WE INVITE YOU TO TAKE A LOOK AT OUR BROCHURE, WISHING ALL PROGRESS AND SUCCESS FOR EGCO. COMMITMENT TO QUALITY, SERVICE, FUNCTION AND VALUE REMAINS AT THE HEART OF EVERYTHING WE DO. ENG.ABDEL MOُُETY AMER CHAIRMAN OF THE BOARD

3

4 CH AIRMAN AND MANAGING DIRECTOR CH AIRMAN AND MANAGING DIRECTOR PUBLIC RELATION PUBLIC RELATION LEGAL AFFAIRS LEGAL AFFAIRS EXECUTIVE SECRETARY GENERAL PROJECTS MANAGER GENERAL PROJECTS MANAGER SECRETERIALSECRETERIAL ADMINISTRATIVE MANAGER ADMINISTRATIVE MANAGER IT MANAGER IT MANAGER TECHNICAL MANAGER TECHNICAL MANAGEREXECUTIVE EXECUTIVE FINANCIAL MANAGER FINANCIAL MANAGER QUALITY CON- TROL MANAGER INTERNAL PREVIEW DOCUMENTATION CONTROL DOCUMENTATION CONTROL QUALITY CONTROL STORES ACCOUNTS STORES ACCOUNTS AUDITING TENDERS RESEARCH CASHIER SUB- CONTRACTORS CASH ADVANCE SUB- CONTRACTORS CASH ADVANCE CONTRACTS, OFFERS & PROJECTS COSTS CONTRACTS, OFFERS & PROJECTS COSTS GENERAL LEDGER GENERAL LEDGER BANKS & INVESTMENTS BANKS & INVESTMENTS HUMAN RESOURCES AND TRAINING HUMAN RESOURCES AND TRAINING PURCHASING STORAGE MECHANICAL EQUIPEMENTS MANAGERS MECHANICAL EQUIPEMENTS MANAGERS SITE ENGINEER MANAGERS SITE ENGINEER MANAGERS PLANNING CONTRACTS TENDERS RESEARCH CONTRACTS TENDERS RESEARCH INFORMATION STATICS INFORMATION STATICS EXECUTIVE WORKS PREVIEW

5 QuantityQuality ( Item )Sr. 2Excavator ( Komatsu ) PC 200/21 2Excavator ( Komatsu ) PC 200/32 5Excavator ( Komatsu ) PC 120/53 2Excavator ( Komatsu ) PC 120/64 2Loader ( Komatsu ) WA 3505 2Loader ( Komatsu ) W 606 1Loader ( Komatsu ) WA 407 2Crane FMC ( 18 Ton )8 4Moving mixer 1m 39 32Well point system with accessories10 6Jet pump 4 inch11 20Deep well pump (Ferbank ) 30 H.P 100 m 3 /h with accessories12 4Generator ( Komatsu ) 230 K.V.A13 3Generator ( Helwan ) 60 K.V.A14 3Distribution panels for operation pumps15 3Air compressor( Atlas )16

6 QuantityQuality ( Item )Sr. 8Concrete Vibrator ( Honda5 ) 5.5 H.P17 13Submersible pump (Tesromi ) 220 Volt18 6Dewatering pump ( kobbota )19 6Truck ( 3 Ton )20 6Water truck21 3Diesel truck22 3Welding Machine Doeits 400 Amb23 1Mercedes Car ML 32024 1Peugeot car GLX 40525 1Mitsubishi Lancer26 1Mitsubishi truck car ( 5 Ton )27 8Pick up Chevrolet car28 1Dogan car SLX 160029 1Shaheen car 140030 1Computer Network31 22Personal Computer32 8Printer33

7

8

9 YEARS WITH THE FIRM QUALIFICATION YEARS OF EXPERI- ENCE POSITIONNAMENO 19 Years B.Sc. of Mechanical Eng. Cairo Univ. 1968 36Chairman of the board. Abdel Moety Mohamed Amer 1 16 YearsB.Sc. of Science, 198519 General Executive Manager Ahmed El Sayed Amer2 6 YearsB.Sc. of Mechanical Eng. 197529Technical Dept. ManagerAbdel Moneim Zayed3 3 YearsB.Sc. of Civil Eng. 198321Project ManagerMohsen El Shabrawi4 6 YearsB.Sc. of Mechanical Eng. 197727Maintenance EngineerHelal Aziz Sharobim5 8 YearsB.Sc. of chemical Eng. 197826Chemical EngineerMostapha EL Tabei6 6 YearsB.Sc. of Civil Eng. 198321Project Manager Ahmed Sabry Nour- Eldeen 7 1 YearB.Sc. of Civil Eng. 198716Site EngineerAhmed Mohamed Elbieh8 4 YearsB.Sc. of Civil Eng. 198815Site Engineer Baher Mikhaeil Shenouda 9 4 monthsB.Sc. of civil Eng. 19976Site EngineerFathy Elsaid Almoursy10 3 YearsB.Sc. of Science Technology 19959Computer Engineer Mohamed Bayomi Ramadan 11 18 months B.Sc. of civil Eng. 20031Technical Dept. EngineerAhmed Adel Mahmoud12 6 monthsB.Sc. of civil Eng. 20003Site EngineerSameh Nabil Abdel Hadi13

10 YEARS WITH THE FIRM QUALIFICATION YEARS OF EXPERI- ENCE POSITIONNAMENO 10 YearsFaculty of Commerce 198516AccountantHassan Moh. Mohei El Din14 10 YearsFaculty of Commerce 197526Financial ManagerMohamed Omar15 7 YearsFaculty of Commerce 9010Financial & Admin.Ali Abdel Al Saleh16 4 YearsFaculty of Commerce 9110AccountantIbrahim Abdel Halim17 1 monthsFaculty of Commerce 19929AccountantMagdy Abou El Magd18 4 YearsFaculty of Commerce 19854AccountantMohamed Seliman Eliwa19 5 Years Technical Commercial High School 1881 20PersonnelOnsi Anwar Ali20 7 Years Technical Commercial High School 1881 9Financial & Admin.Safwat Abdel naieem21 20Faculty of Commerce 198520Admin. ManagerOsama Anwar Ali22 1Faculty of Commerce 20031Accountant Hisham Abdel moniem Helal 23 1Faculty of Commerce 20004AccountantAmal Abdel Megeed24 1Faculty of Agriculture 20004Special SecretaryHeba Ali Mourad25 2Faculty of Law 199310General SecretaryEbtihal Gamal Eldeen26 1Faculty of Law 20022ReceptionistYasmien Saleh Mahmoud27

11 YEARS WITH THE FIRM QUALIFICATION YEARS OF EXPERI- ENCE POSITIONNAMENO 3 YearsIndustrial High School 19938SurveyorFouad Nabil Sobhy28 4 YearsHigh School for Area measurements 19965SurveyorEzzat Khalaf Hassan29 4 YearsTechnical Industrial high school 19974SurveyorAhmed Abdel Hafiz30 4 YearsHigh School for Area measurements 19974SurveyorMohamed Roshdy Ahmed31 4 YearsTechnical Industrial high school 19974SurveyorTaha Bassiouny Mohamed32 7 YearsTechnical Industrial high school 198813Technical Supervisor Moustafa A. Fatah El Wakeel 33 3 YearsTechnical high School 198813Technical SupervisorHazem Abdalla El Mougi34 5 YearsTechnical Industrial high school 198912Technical SupervisorIbrahim El Sayed Bayoumy35 7 YearsTechnical Industrial High School 19929Technical SupervisorMohamed El Sherbini36 7 YearsTechnical Industrial high school 199110Technical SupervisorRamadan Shaaban37 5 YearsTechnical Industrial high school 947Technical SupervisorMaged Abdel Moneim38 4 monthsAgriculture Science high school 199418Technical SupervisorMohsen Aboul Leil39 6 YearsTechnical Commercial high school 198615Store KeeperNabil Aboul Leil40 5 YearsTechnical Commercial high school 198912Purchasing RepresentativeMohamed Badr El Din41 5 YearsAgriculture Science high school 198714Store Keeper Mohamed Ibrahim Moustafa 42 5 YearsAgriculture Science high school 198714Store KeeperAli El Sayed Ali43 4 YearsFaculty of letter 19938Store KeeperAref Sabry Sharaf44

12 YEARS WITH THE FIRM QUALIFICATION YEARS OF EXPERI- ENCE POSITIONNAMENO 4 YearsTechnical Industrial high school 19929PlumberWael Ahmed El Sheikh45 7 YearsCarpentry high school 19966PlumberAttia Mansour Ahmed46 6 YearsTechnical commercial high school 939PlumberEssam Abdel Moety47 5 Years--Plumber Abdel Nasser Abdel Khalek 48 4 Years--PlumberAmgad El Shahat49 4 YearsPreparatory School 19929carpenterMosaad Sallam50 7 YearsIndustrial High School 198021ElectricianGamal Hussein51 5 YearsIndustrial High School 198516ElectricianWagih Mansour52 5 YearsTechnical Industrial High School 198714ElectricianHesham Taha53 5 YearsIndustrial High School 1979-ElectricianHassan Abdel Azim54 3 YearsTechnical Industrial High School 19974ElectricianKhaled Galal El Din55 5 Years--TechnicianAlaa Abdel Gawaad56 1 Year--MechanicMohamed Mekki57 9 Years--MechanicAtif Abdel Hamid58 6 Years--MechanicMahmoud Hafez Mahmoud59 5 YearsPrimary school 1982-MechanicEmad El Sayed Attia60

13

14 COST PER MILLIO N OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 1.5 MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150 MM & 200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS AND HOUSE CONNECTIONS. POTABLE WATER PIPES AT: MEET MAZAH & MEET ALI VILLAGES DAKAHLIA GOVERNORATE- EGYPT. 1985- 19861 2.0 MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 600 MM INCLUDING THE INSTALLATION OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AT 10 TH OF RAMADAN AREA - GAMASSA CITY. DAKAHLIA GOVERNORATE- EGYPT. 1985-19862 2.0 MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, PLAIN & REINFORCED CONCRETE WORKS, PUMPS-ROOM, BUILDINGS AND FINISHINGS. PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS, BASED ON WELL–POINT SYSTEM DEWATERING. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 10 TH OF RAMADAN AREA - GAMASSA CITY. DAKAHLIA GOVERNORATE – EGYPT. 1985-19863

15 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 1.5 MINISTRY OF RECONSTRUCTI ON AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150 MM & 200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS AND HOUSE CONNECTIONS. POTABLE WATER PIPES LINE AT NEW EZBET EL SAIIDIA VILLAGE. DAKAHLIA GOVERNORATE. EGYPT. 1986-19874 1.5 MINISTRY OF RECONSTRUCTI ON AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 450 MM INCLUDING THE INSTALLATION OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AT 5 TH AREA – GAMASSA TOURIST AREA. DAKAHLIA GOVERNORATE- EGYPT. 1986-19875 1.5 MINISTRY OF RECONSTRUCTI ON AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE BUILDINGS, ISOLATIONS, FINISHINGS AND OUTSIDE FENCE. PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT 5 TH AREA - GAMASSA CITY. DAKAHLIA GOVERNORATE- EGYPT. 1986- 19876

16 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 1.5 MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE BUILDINGS, ISOLATIONS, FINISHINGS AND OUTSIDE FENCE. PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT 2ND AREA -GAMASSA CITY DAKAHLIA GOVERNORATE- EGYPT. 1986-19877 5.5 ARAB CONTRACTOR- TANTA BRANCH. AUTHORITY OF RECONSTRUCTIO N OF NEW DAMIETTA CITY. SUPPLY AND INSTALL OF GRP, PVC AND PRE-STRESS PIPES, DIAMETERS FROM 200 MM UP TO 1000 MM INCLUDING SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL- POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING FOR INDUSTRIAL AREA AT NEW DAMIETTA CITY. DAMIETTA GOVERNORATE- EGYPT. 1987-19888 4.5 ARAB CONTRACTOR- TANTA BRANCH. AUTHORITY OF RECONSTRUCTIO N OF NEW DAMIETTA CITY. SUPPLY AND INSTALL OF PRE-STRESS CONCRETE PIPES, DIAMETER 1000 MM. PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS AND SPECIAL PIECES, BASED ON WELL-POINT SYSTEM DEWATERING. POTABLE WATER PIPES LINE DIAMETER 1000 MM AND DEWATERING AT NEW DAMIETTA CITY. DAMIETTA GOVERNORATE- EGYPT. 19889

17 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 3.0 ARAB CONTRACTORS- ALEX BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 500 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DELENGATE CITY (PART 1). EL BEHERA GOVERNORATE- EGYPT. 1989-199010 3.5 ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 500 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DELENGATE CITY (PART 2). EL BEHERA GOVERNORATE- EGYPT. 1990-199111 2.0 ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 600 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT KHANKA CITY. GREAT CAIRO-EGYPT. 1991-199212

18 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 3.0 ARAB CONTRACTORS- ALEX BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY (PART 1). EL BEHERA GOVERNORATE- EGYPT. 1992-199313 3,0 ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY (PART 2). EL BEHERA GOVERNORATE- EGYPT. 1992-199314 8.5 ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 1400 MM TO JOIN THE PARTIAL STATION AND THE MAIN STATION. PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS INCLUDING THE SPECIAL PIECES, BASED ON THE WELL- POINT SYSTEM DEWATERING. GRAVITY PIPES LINE DIAMETER 1400 MM AND DEWATERING AT DAMIETTA GOVERNORATE- EGYPT. 1992- 199415

19 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 9,00 ARAB CONTRACTORS- TANTA BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF DUCTILE CAST- IRON PIPES LINE, DIAMETER 900 MM. PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS, SPECIAL PIECES, BASED ON WELL-POINT SYSTEM DEWATERING. FORCE MAIN PIPES LINE FOR THE SEWAGE DRAINAGE AND DEWATERING AT RASSEL BAR. DAMIETTA GOVERNORATE- EGYPT. 1992-199316 9.0 ARAB CONTRACTORS- TANTA BRANCH. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL -POINT SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EZBET EL BORG CITY. DAMIETTA GOVERNORATE- EGYPT. 1995-199717 13.0 EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 600 MM FOR THE SEWAGE DRAINAGE NETWORK. PLUS OF SUPPLY SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, FLEXIBLE CAST IRON FORCE MAIN PIPES LINE DIAMETERS FROM 150 MM UP TO 200 MM, VALVES CHAMBERS AND ITS SPECIAL PARTS. SEWAGE DRAINAGE NETWORK, FORCE MAIN PIPELINES AND DEWATERING AT HORANI CITY. DAMIETTA GOVERNORATE- EGYPT. 1995-199718

20 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 3.0 EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS. FOR THE (NOPWASD). SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE WORKS, WELLS, BUILDINGS, FINISHING AND OUTSIDE FENCE. SEWAGE PUMPING STATIONS AT HORANI CITY (1, 2). DAMIETTA GOVERNORATE- EGYPT. 199619 3.0 EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS. FOR THE (NOPWASD). SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS INCLUDING PUMPS, DISTRIBUTION BOARDS, GENERATOR UNITS, VALVES & SPECIAL PIECES IN VALVES CHAMBERS. SUPPLY AND ERECTION FOR MECHANICAL AND ELECTRICAL EQUIPMENTS FOR SEWAGE PUMPING STATIONS AT HORANI CITY. DAMIETTA GOVERNORATE-EGYPT. 199720 42.0 INDUSTRIAL & ENGINEERING PROJECTS COMPANY. FOR THE (NOPWASD) SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 175 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE & CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT & DEEP-WELL SYSTEMS DEWATERING. GRAVITY PIPE NETWORKS AND DEWATERING AT BALTIME CITY. KAFREL SHEIKH GOVERNORATE EGYPT. 1997-200121

21 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 6.0 INDUSTRIAL & ENGINEERING PROJECTS COMPANY. FOR THE (NOPWASD). SUPPLY AND CONSTRUCTION OF ENGINEERING WORKS FOR PUMPING STATIONS INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE WORKS, WELL WORKS, BUILDINGS, FINISHING AND OUTSIDE FENCE. SEWAGE PUMPING STATIONS (1,2) AT BALTIME CITY. KAFREL SHEIKH GOVERNORATE EGYPT. 1998-200122 3.0 INDUSTRIAL & ENGINEERING PROJECTS COMPANY. FOR THE (NOPWASD). SUPPLY AND CONSTRUCTION OF 16 M LENGTH OF PILES FROM IRON PIPES, DIAMETER 600 MM. PLUS OF CONSTRUCTION OF REINFORCED CONCRETE COLUMNS AND RETAINING WALLS OF AN IRON BRIDGE TO SUPPORT FLEXIBLE CAST IRON PIPES. PILES FOR CROSSING CANAL OF MAHMOUDIA AT ABOU HOMOSS- ZAWYETTE GHAZAL. EL BEHERA GOVERNORATE- EGYPT. 1999-200023 9.0 ARAB CONTRACTORS – HELWAN BRANCH. GREAT CAIRO RECONSTRUCTIO N AUTHORITY SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 200 MM UP TO 500 MM. PLUS OF CONSTRUCTION OF SQUARE & CIRCULAR CONCRETE MANHOLES, BASED ON DEEP- WELL SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA & HELWAN. CAIRO GOVERNORATE- EGYPT. 1999-200124

22 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 20.0 ENGINEERING INDUSTRIAL PROJECTS COMPANY. SOUTH SINAI RECONSTRUCTIO N AUTHORITY. SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 500MM. PLUS OF CONSTRUCTION OF CONCRETE CHAMBERS, SPECIAL PIECES, UNDER CROSSING ABOVE CANALS AND DRAINAGES. POTABLE WATER PIPES LINE AT EAST KANTARA CITY- EGYPT. 1999-200025 10.0 ENGINEERING AND INDUSTRIAL PROJECTS COMPANY. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 200 MM UP TO 750 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES. PLUS OF CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL SYSTEM DEWATERING. SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT BATANOUN CITY. MOUNIFIA GOVERNORATE- EGYPT. 1999-200226 2,00 ENGINEERING & INDUSTRIAL PROJECTS COMPANY. NORTH SINAI IRRIGATION AUTHORITY. SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 700 MM, 1200MM, 1400MM, 1600MM, 1800 MM AT DIFFERENT DEPTHS UP TO 8M. IRRIGATION PIPE LINES AT AHMED DAWOUD CANAL – DEWIDAR AREA. NORTH SINAI GOVERNORATE- EGYPT. 2001-200227

23 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 12,00 ENGINEERING & INDUSTRIAL PROJECTS COMPANY. FOR THE (NOPWASD). SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 600MM INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS, ABOVE CANALS AND DRAINAGES. FORCE MAIN PIPELINE FOR SEWAGE DRAINAGE STATIONS AT BALTIME. KAFREL SHEIKH GOVERNORATE EGYPT. 2002-200428 6,00 ENGINEERING & INDUSTRIAL PROJECTS COMPANY. BEHIRA GOVERNORATE IRRIGATION AUTHORITY. SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315MM UP TO 500 MM INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND THE SPECIAL PIECES. DEVELOPMENT OF IRRIGATION LINES AT EL HAMAMI CANAL- ABOU HOMOSS. BEHIRA GOVERNORATE- EGYPT. 2002-200329 13,00 ENGINEERING & INDUSTRIAL PROJECTS COMPANY. KAFREL SHEIKH GOVERNORATE. SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315 MM UP TO 500 MM INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND SPECIAL PIECES. DEVELOPMENT OF IRRIGATION AT KHAWALID CANAL-SIDI SALEM. KAFREL SHEIKH GOVERNORATE- EGYPT. 2002-200330

24 COST PER MILLION OWNERDESCRIPTION OF PROJECTNAME & LOCATIONPERIODNO 12,00 EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS. FOR THE (NOPWASD). SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 175 MM UP TO 800 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES. PLUS OF CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL SYSTEM DEWATERING. PLUS SUPPLY AND INSTALL FORCE MAIN OF PIPE LINES, INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS AND OVER CROSSINGS. GRAVITY PIPE NETWORKS, SEWAGE PUMPING STATIONS, DEWATERING AND FORCE MAIN PIPELINE FOR SEWAGE DRAINAGE STATIONS AT TABLOUHA VILLAGE. MENOFYA GOVERNORATE EGYPT. 2003-200631

25

26 Construction of sewage drainage network at the 5th area, Gamassa Touristic city, to protect the city from pollution as well as encouraging resorting and tourism. SEWAGE DRAINAGE NETWORKS AT 5TH AREA AT GAMASSA TOURIST CITY, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 450 mm, length of 8000 m and depths up to 6,50 m.  Supply and installation of 320 square & circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. COST: 1.5 Million EGP.

27 Construction of sewage drainage network for the industrial area at Damietta city to complete the existing drainage project at the city. SEWAGE DRAINAGE NETWORK AT THE INDUSTRIAL CITY, NEW DAMIETTA CITY PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of GRP & PVC pipes, diameters from 175 mm up to 600 mm, length of 10000 m and depths up to 8,50 m.  Supply and installation of 400 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 8,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Tanta branch OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 5.5 Million EGP.

28 CONSTRUCTION OF A POTABLE WATER PIPES LINE NETWORK, DIAMETER OF 1000 MM, FOR THE NEW DAMIETTA CITY, TO COMPLETE THE EXISTING SERVICES AT THE CITY. WATER PIPELINES AT NEW DAMIETTA CITY,DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of pre-stress reinforced concrete pipes, diameter of 1000 mm and length of 1200 m including bends and plugs, etc.  Supply and installation of sluice, wash and air valves chambers including special pieces, valves and dismantling pieces. MAIN CONTRACTOR : Arab contractors – Tanta branch OWNER : National Organization for Potable Water and Sanitary Drainage COST: 4.5 Million EGP.  The construction was based on the well-point system dewatering according to the high water level at this area.

29 CONSTRUCTION OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK AT EL BEHIRA GOVERNORATE. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY,EL BEHIRA,(PART ONE) PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 6,50 m.  Supply and installation of 340 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 6,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Alex branch. OWNER : National Organization for Potable Water and Sanitary Drainage COST: 3 million EGP

30 CONSTRUCTION OF THE SECOND PART OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK AT EL BEHIRA GOVERNORATE SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY, EL BEHIRA, (PART TWO) PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 4.50 m.  Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 4,50 m.  The construction was based on the well-point system dewatering. MAIN CONTRACTOR : Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage. 3.5 million EGP. COST:

31 Construction of sewage drainage network at El Khanka City to complete the existing network at Great Cairo. SEWAGE DRAINAGE NETWORK AND DEWATERIND AT EL KHANKA CITY, GREAT CAIRO. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m.  Supply and installation of 48 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Nasr City branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 2.0 million EGP.

32 This project was constructed to join the partial stations with the main station by gravity pipes line, diameter of 1400 mm. GRAVITY PIPELINES NETWORK, 1400 MM DIAMETER, AND DEWATERING AT RAS EL BAR, DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of GRP pipes, diameter of 1400 mm, to join the partial stations with the main station.  Supply and installation of slow down and sluice valves chambers including the special pieces, valves and paddle pieces.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 8.5 million EGP.

33 CONSTRUCTION OF GRAVITY PIPELINES, DIAMETER OF 900 MM, AT RAS EL BAR CITY, TO TRANSPORT SEWAGE TO THE TREATMENT STATION AND TO COMPLETE THE EXISTING SEWAGE DRAINAGE NETWORK AT THE CITY. SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of ductile cast iron pipes, diameter of 900 mm, depths from 2,50 m up to 3,5 m and length of 9000 m.  Supply and installation of sluice, wash and air valves chambers including the special pieces, valves, paddle and dismantling pieces.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage COST: 9 million EGP.

34 Construction of the first part of gravity Pipes line at Ezbet El Borg according To the need of a sewage drainage network at this area. GRAVITY PIPELINES AND DEWATERING AT EZBET EL BORG CITY, DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of vitrified clay pipes with rigid joints, diameter from 175 mm up to 750 mm, length of 6000 m and depths up to 6,50 m.  Supply and installation of 400 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 9.0 million EGP.

35 Construction of force main pipelines, from GRP pipes, diameter of 600 mm and length of 14000 m, to transport the sewage from the sewage drainage stations. Including the construction of valves chambers, special pieces, valves and dismantling pieces. POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of force main pipelines from GRP pipes, diameter of 600 mm and length of 14000 m including excavation works, installation, test, washing, cleaning and transportation  Supply and installation of sluice, wash and air valves chambers valves including the special pieces, valves, dismantling and wall paddle pieces.  The construction was based on the well-point system dewatering for levels up to 3.50 m and on the deep-well system dewatering for levels more than 3.50 m. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage 12 million EGP COST:

36 Construction of sewage drainage network at Batanoun, Menoufia Governorate according to the Government’s policy concerning supplying all villages and cities at Cairo by the Gravity pipes networks. SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT EL BATANOUN CITY. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 8000 m and depths up to 8.50 m.  Supply and installation of 320 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 and depths up to 8.50 m.  Supply and construction of 4 sewage pumping stations including wells works, diameters from 3 m up to 8 m, plus of construction of extension buildings as workshops, generator room, storage, administration building and outside fences. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 6 million EGP.  The construction was based on the deep-well system dewatering according to the high water level at this area.

37 Construction of sewage drainage Network At El Maasara and Helwan areas to complete the existing network at the Great Cairo. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA AND HELWAN. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of vitrified clay pipes with flexible joints, diameters from 200 mm up to 550 mm, length of 6500 m and depths up to 6,50 m.  Supply and installation of 260 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m  The construction was based on the deep-well system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Helwan branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 9.0 million EGP. COST:

38 Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Balteem. SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m.  Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Engineer General Con. Co OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate COST: 2.0 million EGB.

39 Construction of sewage drainage network at Gamassa, Dakahlia Governorate to complete the network of the city. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 5 TH AREA AT GAMSSA CITY, DAKAHLIA GOVERNORATE PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of a well for the pumping station, internal diameter of 3 m including the reinforced concrete works and the penetration until the well settles at the required level.  Construction of the extension buildings as the workshop, the generator building, storage, security room and outside fences.  Supply and erection of mechanical and electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special parts, dismantling pieces and the installation at the valves chambers. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate COST: 1.5 Million EGP

40 Construction of a sewage pumping station and supply of mechanical & electrical equipments at the 2nd area to complete the sewage drainage network at Gamassa city. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL & ELECTRICAL EQIPMENTS AT THE 2ND AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of a well for the pumping station, internal diameter of 4 m, including the reinforced concrete works and the penetration until the well settles at the required level.  Construction of administrative units at the station as the workshop, the generator building, storage, security room and outside fences.  Supply and erection of mechanical & electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special pieces, dismantling pieces and the installationation at the valves chambers MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate.. COST: 2.0 million EGP

41 Construction of a sewage drainage Network at Damanhour (Part one) to complete the existing network at middle Delta. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART ONE) PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 10500 m and depths up to 8,50 m.  Supply and installation of 420 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area MAIN CONTRACTOR : Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage.. COST: 3.0 million EGP

42 construction of the second part of sewage drainage network at Damanhour City to complete the existing network project at El Behira Governorate. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART TWO). PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 4800 m and depths up to 8,50 m.  Supply and installation of 190 square and circular plain concrete manholes, internal diameters of 1,20 mm and depths up to 8,50 m.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.0 million EGP

43 Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Bal teem. SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level.  Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences.  The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage COST: 6.0 million EGP.

44 Construction of the sewage pumping stations (1,2) and supply of mechanical & electrical equipments, to complete the sewage drainage network project at El Horaniy city. Sewage pumping stations (1,2) at El Horaniy city, Damietta Governorate PROJECT DESCRIPTION: EGCO SERVICES :  Supply and Construction of reinforced concrete wells and the penetration until the wells settles at the required level.  Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room, the administration building and the outside fences. MAIN CONTRACTOR : El Nasr Company for Buildings and constructions. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.0 million EGP.  Supply and erection of electrical and mechanical equipments at the stations including submersible pumps, generator unit, distribution board, transformers and special pieces, valves, dismantling pieces at the valves chambers

45 Construction of irrigation lines for the agriculture areas at north Sinai in accordance with the development scheme of this area. AHMED DAOUD CANAL IRRIGATION PIPELINES AT EL DOWAIDAR AREA, NORTH SINAI. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of GRP pipes, diameters of 700 mm, 1200 mm and 1400 mm, depths from 4 m up to 7 m and length of 12000 m. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : North Sinai Reconstruction Authority. COST: 2 million EGP.

46 Construction of a potable water Pipelines from El kantara East at EastEl Tafreaa Area to complete the needs and the services at this area. POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of GRP pipes, diameter of 500 mm, depths from 2,50 m up to 3,50 m and length of 25000 m.  Supply and installation of 65 sluice, wash and air valves chambers including special pieces, valves and dismantling pieces.  Supply and construction of under crossing roads and over crossing canals, using excavation for the roads and piles for the canals. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : North Sinai Reconstruction Authority. 15 million EGP COST:

47 In view of the need of "Abou Homuos city" for potable water supply, especially the east area of El Mahmoudia canal, it was necessary to construct an over crossing for ductile cast iron pipes, diameter of 600 mm. PILES FOR OVER CROSSING CANAL AT EL MAHMOUDIA, ABOU HOMOUS AND ZAWIAT GHAZAL, EL BEHIRA GOVERNORATE.. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of 64 reinforced piles, diameter of 600 mm, length of 16 m including tests of loading and pouring of the reinforced concrete into the piles.  Supply and construction of walls and reinforced concrete piles heads to hold the steel bridge. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage.. COST: 3 million EGP

48 Construction of a sewage drainage network at Balteem city to complete services at all villages and cities in Egypt. GRAVITY PIPELINES NETWORK AND DEWATERING AT BALTEEM CITY, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m.  Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 4  The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 42.0 million EGP.  Demolition and reconstruction of water supply networks which facing the execution of the network project.

49 Construction of a sewage drainage network at El Horani city, Damietta Governorate, according to the Government policy to complete the construction of all sewage drainage networks at all villages and cities in Egypt Sewage Drainage network, force main pipelines and Dewaterimg at El Horani city, Damietta Governorate.. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, depths up to 6,50 m and length of 12500 m.  Supply and installation of 500 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.  Supply and installation of ductile cast iron pipes, diameters of 150 mm & 200 mm and length of 6000 m including valves chambers, special pieces, valves and dismantling pieces. MAIN CONTRACTOR : El Nasr for buildings and Constructions. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 13.0 million EGP.  Supply and construction of under crossing roads and over crossing canals including isolated iron pipes, diameters of 200 mm & 150 mm and the chambers on the crossing sides.

50 Supply and modification of Potable water network at Meetmazah and Meetali villages. WATER PIPELINES AT MEETMAZAH AND MEETALI VILLAGES, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm & 200 mm and lenglh of 18000 m.  Supply and installation of valve diameters of 150 mm & 200 mm including special pieces of bends, tees and reducers, etc, along the network.  Joining the housing connections with the main network. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. 1.5 Million EGP. COST:

51 Modification of the existing potable water network at El Saiidia village, Dakahlia Governorate. POTABLE WATER PIPELINES AT NEW SAIIDIA VILLAGE, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm and 200 mm and length of 6500 m.  Supply and installation of valves, diameters of 150 mm & 200 mm including bends, tees and reducers, Etc.  Supply and installation of potable water pipes for the house connections. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. 2.0 Million EGP. COST:

52 Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system. DEVELOPING OF THE IRRIGATION PROJECT AT EL HAMAMI CANAL, ABOU HOMOUS, EL BEHIRA GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES:  Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system.  Supply and installation of 240 valves chambers including valves, diameter of 250 mm.  Supply and construction of 38 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works and reinforced & plain concrete foundations, walls and ceilings. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : Irrigation development Authority at the Ministry of the General affairs. 6 million EGP COST:

53 Construction of irrigation pipeline system at El Khawaled canal, Sedy Salem, to save the waste water resulting from the use of old-fashioned irrigation system DEVELOPMENT OF IRRIGATION PROJECT AT EL KHAWALED CANAL, SEDY SALEM, KAFR EL SHIEKH GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES:  Supply and installation of plastic pipes, diameters of 315 mm, 355 mm, 400mm & 500 mm and length of 49000 m including excavation works, installationations and tests.  Supply and installation of 680 valves chambers including valves, diameter of 250 mm.  Supply and construction of 78 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works, reinforced & plain concrete foundations, walls and ceilings. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : Irrigation development Authority at the Ministry of General affairs. 13.0 million EGP COST:

54 Construction of a sewage drainage network at Tablouha city to complete services at all villages and cities in Egypt. CONSTRUCTION OF GRAVITY PIPES NETWORK FOR TABLOUHA CITY WITH THE WELL POINT IN KAFR EL SHEIKH PROJECT DESCRIPTION: EGCO SERVICES :  Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m.  Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.  The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 30 million EGP.  Demolition and reconstruction of water supply networks which facing the execution of the network project.

55 Construction of 2 sewage pumping stations totransport sewage to the treatment station to complete the existing network project at Tablouha. SEWAGE PUMPING STATIONS (1,2) AT TABLOHA, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: EGCO SERVICES :  Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level.  Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 4 million EGP  The construction was based on the well-point system dewatering according to the high water level at this area.

56 Supply and install upvc water pipes with diameter 355 mm of working pressure 10,16 bar length of 15 km including Wash, Air chambers and Tunnels. In addition to supply and build reinforced concrete ground tanks capacity of 4000 m3 within the factory and another 750 m3 capacity in pumping stations.In addition to the ordinary work including excavation, PC, RC,and finishing the work and including the supply and install of Pumps,generators, cranes, chlorination systems, water hammer systems, the earthing and fire alarm systems Inside Pumping stations.In addition to the supply and installation of internal water networks of diameters 160 mm, 110 mm and 63 mm for all the buildings inside the factory and connecting the ground tank to cement product water tanks and build Pump chambers for water transfer from the ground tank to the internal water networks. Arabian Cement Project Water Transmission Pipe Line ( Kattamia - Ein ELsokhna road). PROJECT DESCRIPTION: EGCO SERVICES :  Supply and install upvc water pipes with diameter 355 mm length of 15 km including Wash, air chambers and Tunnels ( Kattamia – Ein El El sokhna road ) the Arab cement company – ( quarries road).  Supply and install RC ground tank with capacity of 4000 m3 including all concrete works. inlet and outlet chambers and their Pipe works.  Supply and install all the ordinary works for the Pumping stations including ground tanks with capacity of 750 m3, Pumps chambers, Cranes, Gates, Garde room, Fence, and Generating chambers. MAIN CONTRACTOR : Engineer General Contracting Company OWNER : Arabian Cement Company COST: 20 million EGP. Consultant : Arab Consulting Engineers – Reliance Heavy Industries  Supply and install the Mechanical and Electrical equipments for Pumping stations including Pumps, Generators, Cranes, Panel boards, Cables, Earthing systems, Water hummer systems, Fire alarm and Control system.  Supply and install PVC pipes for the internal water pipe network with diameters of (160,110,63 )mm with length of 2500 m including Chambers, Valves and Internal connections.