© Kazim Okutan – December 2014, Antalya www.kazimokutan.com 48,000 MT/YEAR LOW CARBON FERROCHROME PRODUCTION PROJECT IN TURKEY.

Similar presentations


Presentation on theme: "© Kazim Okutan – December 2014, Antalya www.kazimokutan.com 48,000 MT/YEAR LOW CARBON FERROCHROME PRODUCTION PROJECT IN TURKEY."— Presentation transcript:

1 © Kazim Okutan – December 2014, Antalya 48,000 MT/YEAR LOW CARBON FERROCHROME PRODUCTION PROJECT IN TURKEY

2 2 CHROME ORE FACTS

3 3 CHROME ORE END MARKETS ; 30,000,000 MT 2013 GLOBAL PRODUCTION

4 4 CHROME ORE FACTS

5 5 CHROME ORE END MARKETS

6 6 Low Carbon Ferrochrome ● If Ferrochrome consists of < 0.5 % C it is considered as low carbon ferrochrome ● LC FeCr is used as an alloying agent for high quality steels and some stainless steels. ● Like high carbon ferrochrome LC FeCr contains % Cr ● LC FeCr is sold in $cent / lb Cr content ● Actual LC FeCr Price : 198 – 205 $cent / lb Cr (100 % Cr $/ton) ● For LC FeCr, if C content decreases LC FeCr price increases; target 0.03 % % C ● Fe is given free off charge : High Cr content is advantage for the alloy producer ● Alloy producer has to consume high quality, high Cr/Fe ore contented ore ● Turkish ores usually have high quality; suitable for LC FeCr production ● Major LC FeCr producers worldwide : Russia, Kazakhstan, Turkey, Germany

7 7 Charge - High Carbon - Medium Carbon - Low Carbon Ferrochrome Production ; Global 2013

8 8 Medium Carbon - Low Carbon Ferrochrome Production ; Global

9 9 Low Carbon Ferrochrome Production Process ● Classical LC FeCr production process is Perrin Process; ● Whereas, in a separate AC, 3 phase submerged electric arc furnace silicon ferrochrome alloy (38-45 % Si, % Cr) is produced using lumpy chromite, quartzite, coke ● In another AC- DC furnace 3 or single phase, chromite concentrate is molten with lime ● Within the huge laddles, these two smelted liquids are mixed to react Silicon-Si and chrome oxide-Cr2O3 to produce low carbon ferrochrome. ● Slag is granulated in water, metal is casted in to cast iron moulds with a special design ● ADV : Well known proven process,low chromite losses to slag, flexible, easy usage of return metals ● DisADV : High refractory consumption (laddle) due to high temperatures, energy losses high to air, dangerous – metal/slag splitting, requires highly developed skills – operators, difficult to control temperature and violent reactions

10 10 Low Carbon Ferrochrome P&L, CAPEX, OPEX ● Low Carbon Ferrochrome Production Project ● Project Basis 48,000 MT/year LC FeCr <0,1% C, 70% Cr ; Power Setup 70 MVA ● Designed SiFeCr furnace capacity : 2x15 MVA ; MT/year SiFeCr 45 % Si – 38 % Cr production. SifeCr will be used internally. ● Assigned capacity for chromite-lime furnace : 2x15 MVA MT/year LC FeCr 70 % Cr – 0.03 – 0.10 % C production – mm product base ● Total slag generated by both furnaces will be around MT/year ● Stage 1: Installation of 15 MVA SiFeCr furnace and 15 MVA chromite-lime furnace. ● Stage 1 to commissioning months. ● Stage 2: Installation of 15 MVA SiFeCr furnace and 15 MVA chromite-lime furnace ● Stage2 will start 6 months after commissioning Stage 1 and it will take 14 months to commissioning.

11 11 Low Carbon Ferrochrome P&L, CAPEX, OPEX ● MRP : Material Requirement Plan For 48,000 MT/year LC FeCr ● Specific Raw Material Consumptions for ton/ton LC SiFeCr - Perrin Process – 1) Chromite Concentrate1.75 ton/ton48 % Cr2O3 – Cr/Fe 3.3 – 2) Chromite Lumpy Ore0.85 ton/ton46 % Cr2O3 – Cr/Fe 3.3 – 3) Metallurgical Coke0.52 ton/tonmin 84 % C – 4) Quartzite1.05 ton/tonmin 96 % SiO2 – 5) Bauxite0.15 ton/tonmin 60 % Al2O3 – 6) Lime – Unburnt1.20 ton/tonmin 97 % CaO – 7) Söderberg Paste ton/ton – 8) Total Energy9500 kWh/ton

12 12 Low Carbon Ferrochrome P&L, CAPEX, OPEX ● MRP : Material Requirement Plan – MT/year LC FeCr ● Raw Material Requirement ton/year wet basis - Perrin Process – 1) Chromite Concentrate ton0-2 mm – 2) Chromite Lumpy Ore ton mm – 3) Metallurgical Coke ton10-40 mm – 4) Quartzite ton mm – 5) Bauxite ton mm – 6) Lime – Unburnt ton0-4 mm – 7) Söderberg Paste ton – 8) Total Electrical Energy kWh – 9) Employment (total) 255 employees

13 13 Low Carbon Ferrochrome P&L, CAPEX, OPEX ● CAPEX : $ 80 MILLION +/- % 30 variation according to the chosen process, equipment, tenderer ● months to commissioning (1st Stage) ● % Profit Margin – Before Tax ● $ 150 MILLION TURNOVER ANNUALLY (2 Stage) ● $ 50 MILLION NET PROFIT ANNUALLY – Before Tax (2 Stage) ● INVESTMENT RETURN RATE 2 YEARS max. (2 Stage) ● DEMAND TO CHROME – CHROME ALLOYS WILL BE INCREASING EACH YEAR PARALLEL TO GROWTH IN CHINA ● TARGET MARKETS : NORTH AMERICA – WESTERN EUROPE - JAPAN

14 14 SWOT ANALYSIS 62 Years of LC FeCr production experience,know-how and qualified human resources in Turkey (Eti Elektrometalurji AS) Stable market and price High quality Turkish chromite, Mergers and associations with global players Globally growing Turkish economy Access to global markets

15 15 SWOT ANALYSIS High energy prices Competition from local player (Eti Elektrometalurji) High chromite Cr/Fe ratio necessity for high profit Government regulations (EU regs.) Declining global economy Decreasing high quality local chromite reserves

16 16 Turkish Chromite Mining Zones

17 17 Turkey's Investment Incentives System and Regions Map Region 1 most developed; region 6 least developed area For detailed information refer to :

18 18 Railways Map of Turkey

19 19 Main Industrial Ports in Turkey

20 20 Turkey 154 KV High Tension Lines Map

21 21


Download ppt "© Kazim Okutan – December 2014, Antalya www.kazimokutan.com 48,000 MT/YEAR LOW CARBON FERROCHROME PRODUCTION PROJECT IN TURKEY."