Presentation on theme: "U.S. D EPARTMENT OF H OUSING AND U RBAN D EVELOPMENT U.S. D EPARTMENT OF H OUSING AND U RBAN D EVELOPMENT C APITAL F UND G REEN P HYSICAL N EEDS A SSESSMENT."— Presentation transcript:

1 U.S. D EPARTMENT OF H OUSING AND U RBAN D EVELOPMENT U.S. D EPARTMENT OF H OUSING AND U RBAN D EVELOPMENT C APITAL F UND G REEN P HYSICAL N EEDS A SSESSMENT (GPNA) L ARRY W OOD A PRIL 9, 2014

2 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Current Rule  24 CFR 905 – Capital Fund. Includes the formula, eligible expenses, obligations and expenditures, and Capital Fund Financing Program (CFFP). 2

3 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Rule Changes HUD published three proposed amendments to the Capital Fund regulation at 24 CFR 905 in 2010 and 2011:  Consolidated 24 CFR 905.  Merge development, old CIAP/CGP, and current Capital Fund requirements.  Requires all PHAs to conduct a Physical Needs Assessment (PNA) as part of the Capital Fund requirements. 3

4 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Rule Changes  Final Consolidated Capital Fund Rule at 24 CFR 905 published on October 24,  Effective November 25,  Final Rule for GPNA and Energy Audit pending.  Will move Energy Audit requirement from 24 CFR 965 to 24 CFR 905.  HUD to issue Implementation Notices once Final GPNA and Energy Audit Rules are published.  Implementation Notice to give rollout details—when it will be effectective for which PHAs. 4

5 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  All PHAs, regardless of size, must prepare and submit a GPNA to HUD.  GPNA will include PHA-level summary information, as well as detailed data on each public housing project/Asset Management Project (AMP).  GPNA will reflect current and future needs over a 20-year period based on life-cycle considerations. 5

6 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  Will be conducted without regard to the amount of funding available to perform work identified in the PNA.  The cost of the PNA is an eligible Capital Fund expense.  Will be completed in the form and manner prescribed by HUD.  PHAs must use the new GPNA software (the “GPNA Tool”) to submit PNA data to HUD. 6

7 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  The first GPNA will be due on the basis of a schedule published in an implementation notice that will be issued concurrently with or after the final rule.  HUD anticipates that PHAs will have a minimum of 6 months advance notice of the due date for their specific PNA data submittal.  May include data from PNA collected up to 3 years prior to the submission due date for the first GPNA if the data meet new standards (e.g., 20-year assessment, integration with energy audit; see notice PIH ). 7

8 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA Submission Dates  First GPNA submittal due date no sooner than 6 months from publication of the PNA Rule.  No due dates anticipated before December 1,  All GPNAs submitted by September 2015 based on fiscal year. Note that submission dates presented are examples. Actual submission dates will be per the Final Rule and subsequent Implementation Notice. The cycle of submission may vary in the initial submission. Fiscal Year End (FYE)Due Date March 31December 1 June 30March 2 September 30June 2 December 31September 1 8

9 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  Example of timeline for submission to HUD:  Assume Final Rule published: 4/30/2014.  Effective date of Final Rule: 5/31/2014.  First PNAs due after: 11/30/2014.  Due date: 12/1/2014 (FYE- 3/31). 9

10 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  PHA must use the software provided by HUD, known as the GPNA Tool. (GPNA produces the required format of submittal to HUD.)  Must be performed in conjunction with energy audit and integrated in the GPNA.  Energy audits done within 3 years of the due date of the initial GPNA will not have to be redone if they meet the new rule standards.  After the GPNA is completed by the PHA, data extract will be ed to HUD. 10

11 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  After the first GPNA is completed, the PHA submits an annual update to HUD until the next scheduled GPNA is due.  Annual updates will include only modernization work completed during the past year.  Annual updates are not expected to be as labor-intensive as initial GPNA submissions.  GPNA is not a commitment document.  GPNA should be used to prepare PHA 5-Year and Annual Plans, including Capital Fund projections.  EPIC—Energy Performance Information Center. 11

12 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  PHAs will import PIC building and unit data characteristics into the GPNA.  PIC download data available from EPIC will be updated daily.  As we transition to EPIC, PHAs may still request data from  Accuracy of PIC data is critical: PHA GPNA upload to HUD will not be accepted unless the building and unit counts match PIC EXACTLY. The GPNA tool does permit minor editing to conform inventory data. 12

13 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  PHA can either purchase commercial cost indices of its choosing and input cost data into GPNA, or use supportable cost data, such as a custom cost database prepared for the PHA.  Commercial cost indices (or PHA cost data) can be used by the PHA (or its vendor) to build the “cost library” in the GPNA. 13

14 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  The cost library input effort may be very staff-intensive for the first GPNA.  Subsequent GPNAs will not require the same level of pre- assessment work.  Data can be carried over and then updated as appropriate. 14

15 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  The GPNA will require detailed data from individual projects/AMPS, such as:  Architectural “takeoffs” for individual building components, such as amount of square or linear feet of a component (entered on inspection form).  The effective useful life (EUL) of each individual building component (entered on cost library). 15

16 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  The GPNA will require detailed data from individual projects/AMPS, such as:  Replacement cost for each individual building component (entered on cost library).  The remaining useful life (RUL) of each individual building component (entered on inspection form). 16

17 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS GPNA  GPNA may be performed by either PHA staff or contractors, as the PHA determines appropriate, as long as they meet the HUD qualifications. There is NO HUD-required certification.  PHA must make the results of the PNA available to the residents and Resident Advisory Board at the time of submission to HUD. 17

18 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  The new energy audit requirements are more detailed than before.  Approximately a Level 2 ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers) audit.  They will provide PHAs with more standardization and practical information to assist PHAs in:  Identifying cost-effective energy conservation measures.  Reducing both capital and operating costs.  No HUD-required software or format. 18

19 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  PHAs not required to implement specific energy conservation measures (ECMs), unless required by statute.  PHA must integrate utility management with capital planning to maximize energy conservation (2005 Energy Policy Act).  Energy audit must be done in conjunction with the GPNA.  Energy audit collects more data than required for the GPNA.  Energy audit IS NOT required to be submitted to HUD, but IS subject to HUD review. 19

20 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  New energy audit not required if:  Current energy audit is less than 3 years old and meets the standards of the new rule.  Demolition/disposition approved by HUD.  Project is less than 5 years old at the time the energy audit is due  Timing (pending publication of the Final Rule). 20

21 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  As before:  All PHAs, regardless of size, will do an energy audit for each public housing project/AMP.  Energy audit will be performed not less than once every 5 years.  These requirements will continue. 21

22 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  Energy audit will review projected costs, savings, and payback periods related to a variety of ECMs.  ECMs reduce utility and energy consumption.  Energy audit:  May include “green measures” that do not save energy.  May provide information on environmental or potential health benefits of green measures (e.g., air quality). 22

23 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  Core ECMs: Proven track record at reducing energy and water consumption required review by auditor:  Building envelope (e.g., insulation).  Heating, cooling, and other mechanical systems.  Water conservation.  Power, lighting systems, and controls (e.g., compact fluorescent lamp).  Appliances (e.g., ENERGY STAR). 23

24 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit  Advanced ECMs: advanced, experimental, or difficult- optional additional review  Fuel conversion.  Conservation technologies (energy management systems).  Energy-generating technologies and renewable-energy systems (e.g., solar, geothermal). 24

25 C APITAL F UND – GPNA N EW HUD R EQUIREMENTS Energy Audit Energy audit must, at minimum, address Core ECMs and:  Categorization of ECMs into payback periods:  5 years or less,  5 to 10 years, and  Greater than 10 years. 25

26 GPNA Energy Audits 26

27 E NERGY A UDIT S TANDARDS Establishes Min. Quals  BPI, RESNET, CEM, CEA. Establishes Min. Standards  Goal is to equal State standards.  Equal to ASHRAE Level 2. Content and Submission requirements  Utility analysis.  Core ECMs—MUST be discussed in report.  Payback analysis required.  Reporting must group by 12 year and 20 year. 27

28 E NERGY A UDIT L EVELS 28

29 S TEP O NE : D ATA C OLLECTION AND B ENCHMARKING  Data Required:  12 months minimum of utility bills—gas, water, electricity, propane, steam.  Mechanical plans.  Appliance, DHW information. 29

30 B ENCHMARKING  Benchmarking:  Hard to manage what you do not measure.  Identifies energy opportunities.  Baseline analysis of energy consumption/cost.  Provides metric to measure and compare energy usage. Compare your facility to similar facilities. Compare your facility to national averages. kBtu/ft2. $/ft2. 30

31 S TEP 2: E NERGY A UDIT  Review of all energy-consuming components.  Defines ECMs: Energy conservation measures that are feasible.  Ranks ECMs based on payback. 31

32 S TEP 3: E NERGY P LAN AND R EPORTING  Prioritizes opportunities and budget.  Coordinated with Replacement Reserve.  Explores project-based incentives and grants available.  Recommends viable candidates for renewable energy, solar, wind, geothermal, combined heat power (CHP).  Outlines process for measuring and verifying savings. 32

33 C ORE ECM S  Core ECMs  Insulation  Energy-efficient mechanical systems  Low-flow water devices  Lighting  Energy Star appliances  Advance ECMs  Renewable energy  Solar  Geothermal 33

34 R EGIONAL ECM S  Anywhere  Site Lighting  Interior Lighting  Energy Star Appliance  Domestic HW  Cold Climate  Boilers  Conversion From Oil, or Electric to NG  High-Performance Windows  Building Envelope  Warm Climate  High-Performance Air Conditioning  Cool Roofing  Window Tinting  Awnings and Shading  Green Solutions  Wind  Cogeneration  Solar PV  Solar HW  Geothermal 34

35 M ARK -T O -M ARKET (M2M) G REEN I TEMS  Water Conserving Devices  Refrigerators  Dishwashers  Heating and Cooling Products  Water Heaters  Windows  Sliding Glass Doors  Storm Door  Exterior Doors  Insulation  Interior Lighting  Exit Signs  Ceiling Fans  Ducted Exhaust  Exhaust Fans  Cabinets/Vanities  Thermostats 35

36 C OMMON ECM S  High-efficiency HVAC  Controls on HVAC  Lighting controls  Natural Light/Shading  Point-of-Use DHW  Solar HW  Appliances  Low-Flow Plumbing  Incentivize Cleaning/Grounds Crew as Energy Monitors SystemPercent Annual Energy Usage HVAC56% Lighting17% Water Heating9% Appliances/Home Equipment8% Water Savers6% Other2% 36

37 M ULTIFAMILY GPNA ECM F EEDBACK Implemented ECMs Number Reduction  CFL Light Bulbs (Interior) %  Refrigerator %  Low-Flow Toilets %  Shower Heads %  HVAC Split System %  Faucet Aerators % 37

38 Advanced ECMs 38

39 W IND T URBINES Horizontal Axis Wind Turbine  Most popular and capable of generating high power.  Available in various sizes for serving residential-style application to serving large grids.  Performance goes down in turbulent winds.  High initial investment as compared to vertical wind turbines. Vertical Axis Wind Turbine  Generates less power as compared to horizontal axis turbines.  Ideal for small loads (e.g., community building, small offices,and single- family homes.  Performs well in all types of winds, hence more efficient.  More cost-effective as compared to horizontal wind turbines. 39

40 A DVANTAGES OF G EOTHERMAL S YSTEM  Energy efficient.  Classified as “renewable energy.”  Lowers peak demand.  Up to 44% reduction in green house gas emission (EPA).  System is compact and requires less space.  Package equipment.  Use 25% less refrigerant than conventional systems.  No auxiliary heat (in most cases).  No more refrigerant freezing.  Space over wells/trenches can be used for parking lots or open play fields.  Low maintenance. 40

41 A DVANCED T OOLS AND M ETHODS Air Duct Testing—Test HVAC duct for leakage:  Conditioned air leaks outside or into the attic or crawlspace.  Pull unconditioned air directly into the HVAC system.  Moist air being drawn into return air results in reduced efficiency.  Draw air into the building from crawlspaces, garages, and attics bringing with it dust, mold spores, insulation fibers, and other contaminants. 41

42 C APITAL F UND – GPNA: A DDITIONAL I NFORMATION For more information and future updates, please visit the GPNA Resource Web page at: _offices/public_indian_housing/programs/ph/ capfund/gpnatool. _offices/public_indian_housing/programs/ph/ capfund/gpnatool 42