Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hythro Power Corporation Limited.. Hythro: Inception & Background Hythro was established in the year 1989. Part of ‘Tecpro Group’, a leading EPC business.

Similar presentations


Presentation on theme: "Hythro Power Corporation Limited.. Hythro: Inception & Background Hythro was established in the year 1989. Part of ‘Tecpro Group’, a leading EPC business."— Presentation transcript:

1 Hythro Power Corporation Limited.

2 Hythro: Inception & Background Hythro was established in the year Part of ‘Tecpro Group’, a leading EPC business house providing comprehensive range of services in power, steel, mining, cement & other industries in Infrastructure sector & balance of Plants for Power Sector. Tecpro Systems Limited, a flagship company of Tecpro Group, which is listed on Indian Stock Exchanges with a market capitalisation of approximately US $ 200 Million. The group turn over including listed & other entities is approximately US $ 800 Million. One of the prominent EPC (Engineering, Procurement & Construction) player in all the power sector segments i.e. from Power Generation to Power Transmission to Power Distribution. Undertaking large EPC contracts for many projects from various prestigious organizations. And its manufacturing facility of towers has played an important role for its stupendous success in Power Transmission segment. With the in-house engineering/technical competency & organic/inorganic growth strategy the company is all set to emerge out as the key player in the Global Power industry.

3 Vision & Mission Our ‘aspiration to grow’ & our ‘focus on customers/ timely delivery’ & ‘focus on quality/safety’ has been our guidelines in doing our business. Our Vision & Mission statements capture them all: Vision “To become one of the leading company in the field of Turnkey projects up to 800 KV EHV Transmission Lines and Sub-Stations in National and International markets” Mission “To be most preferred supplier by adding value to the customer’s project focusing on Quality, Cost, Innovation and Productivity with due regard to occupational health, safety and environment”

4 Business : From Power Generation to Load Centers GENERATION E-BOPNON-CONVENTIONAL/RENEWABLE ENERGY Electrical Balance of Plant for Power Plants Creating Power Evacuation System for Renewable Energy Supply LOAD CENTERS INDUSTRIAL /COMMERCIAL ELECTRIFICATION Creating electrical infrastructure for the manufacturing/commercial entities. TRANSMISSION & DISTRIBUTION TOWER PARTS MANUFACTURING EHV TRANSMISSION LINES EHV SUBSTATIONS MV, LV Distribution Lines RAILWAYS State of art manufacturing plant situated at Bhiwadi, Rajasthan having capacity of MT /annum Turnkey projects upto 765 kV Class Turnkey projects upto 400 kV class Rural Electrification, RGGVY, APDRP, Feeder Separation Projects, Etc. Traction-overhead systems, switching stations, traction substations, etc.

5 Quality Management System With Health, Safety & Environment Policy We, as Hythro Power Corporation Ltd., lay high emphasis on the quality management to ensure the quality in every respect. We have been accredited with ISO certification. Also we do take care of all the necessary safety measurements & established our HSE policy for the same. We have been accredited with ISO & BS OHSAS for our endeavors in this regard.

6 Design Capability Project Type Design Capability SubstationsElectrical Bus Configuration, Metering & Relaying Diagram, Layout Design, Selection Of Relays, Ct / Pt Calculation, Vendor Drawing Review, Battery & Charger Sizing, AC / DC Schematic Engineering, Fault Level Analysis, Relay Setting Calculation, Substation Automation & Communication Engineering Civil & Structurals Structural Steel, RCC Design, Foundation Design & Analysis, RCC Building Design, Detailing Of RCC and Structural Steel Fire Fighting System P&I Diagram, Fire Alarm & MCC Fire System, Hydrant System CO2 System HVAC Heat Load Calculation, Selection Of Air-Conditioning & Distribution System, Selection Of Fire Alarm Panel & Control System E-BOP Metering, Relaying & Control System For Generator, Generator Transformer, Excitation & Unit Auxiliary Transformer. Detailed Engineering Include Cable Sizing, Cable Routing & Control Schematics For:Coal Handling System, Ash Handling System, Water Treatment Plant, Electrostatic Precipitator, Selection Of PCC & MCC For Plant Electrics, Power Plant Earthing Design, Lighting & Lightning Design, Fault Level Analysis, Relay Coordination/Recommendation And Instrumentation Engineering Transmission Lines Tower Spotting, Sag Tension Calculation, Sag Template, Clearance Diagram, Stringing Chart, Structural Analysis & Design Of Tower And Foundation Analysis & Design

7 Project Management The key to success in EPC projects is the ability to manage the resources to provide quality and delivery, meeting client’s requirement. This aspect of project management can be achieved only by experience. Our company has in its roles- successful and cohesive team to manage projects from Survey to commissioning with experienced professionals with decades of experience behind them in executing contracts of varied nature and sizes. The combined experience of our executives in Turnkey Projects shall ensure that our client gets best in Technology and Quality at competitive cost. The project management team uses latest software and an internally developed project reporting system to provide the clients with progress and plan for project execution and management.

8 Manufacturing Plant

9 Consolidated Financial Capability- Hythro Power & Its Subsidiaries *Considering 1 USD = 50 INR * Including proportionate Finance of subsidiaries

10 Our Accomplishments Executed several E-BOP projects ranging from 28 MW to 2 x 600 MW on turnkey / partial turnkey basis. Laid more than 10,000 ckt. kms of transmission & distribution lines. Have expertise to lay the lines through difficult terrains (e.g. hilly regions, deserts, river crossings, snow capped regions, cultivated land, urban areas etc.) and already executed such projects for our prestigious clients including government organisations & private parties. Constructed over 500 substations / switchyard projects from 33kV to 400kV level in different parts of the country under different environmental conditions for the prestigious clients including government organisations & private parties. Continuous growth of the Hythro Group from USD 12.9 Million in FY to USD 167 Million in FY (** Accomplishments by Hythro Power & its subsidiaries)

11 Contact Details CONTACT ADDRESSES Head Office: TECPRO HOUSE, Plot 78, Sector 34,NH-8, Gurgaon Ph: /200/300/400 Fax: Bangalore: No 1316/C, 2nd Floor, 80 Ft Road, 9th Cross, JP Nagar 2nd Phase, Bangalore Ph: / 47 Fax: Kolkata: Godrej Waterside, Tower-I, 11th Floor,Flat Nos & 1102, Plot - 5, Block – DP, Sector - V, Salt Lake City, Kolkata Phone: Fax : / Mumbai: , Building No. A-2, Jagdamba Commercial Complex, (Movie Time Complex) Link Road, Malad (West) Mumbai – Ph: / Fax: Chennai: G.E.T. Power Ltd. No.153, Developed Plots, Electrical & Electronics Industrial Estate, Perungudi, Chennai Ph: /2/3 Fax:

12 Project Glimpse Transmission Lines S.No.ClientProject Details 400kV Class & Above 1Shree CementD/S/E/T/C of D/C line at Beawar ( Rajasthan) 2Adani PowerE/T/C of D/C Mundra-Zerda Transmission line of GETCO 3PGCILE/T/C of LILO D/C & S/C Singrauli –Kanpur Line 4AsterE/T/C of D/C Mundra - Varsana Transmission line of GETCO 5ArevaD/C & S/C line associated with NTPC Sipat 6Sravanthi InfratechD/S of Quad Moose TL for 220MW Gas based Power Project 7KWPCL (Avantha Power) D/S/E/T/C of TL for 2x600 MW KWPCL Raigarh Project, Chhattisgarh 8Jyoti StructureS/E/T/C of TL at WRSS-Maharashtra of RETL.

13 Project Glimpse Transmission Lines S.No.ClientProject Details 220 kV Class 1UPPTCLS/E/T/C of D/C Parichha- Mainpuri Line 2RSEBE/T/C of S/C Bhilwara to Kankroli Line 3UPPTCLS/E/T/C of D/C Transmission Line 4PTCULS/E/T/C of Rishikesh - Dharasu (I) & chamba - Dharasu Transmission Line 5HPPTCLD/S/E/T/C of S/C TL from 220KV Palchan S/S to 220KV A.D. Hydro Switchyard 6Jaiprakash Associates S/E/T/C of D/C over line from Kunihar 220KV substation to JHCP Baga. 7PTCULS/E/T/C of D/C line of Single Zebra (Rudrapur-Srinagar via Ghansali) 8RSEBRatangarh -Sikar -Rengus 9KPTCLD/S/E/T/C of Bastipura-Kushalnagara D/C T/L. 10KPTCLD/S/E/T/C of Shimoga-Huygonahalli LILO T/L.

14 Project Glimpse Substation S.No.ClientProject Details 400kV Class 1PGCILD,S,E,T,C for bay extension works at 400kV Fatehabad S/S. 2PGCILD,S,E,T,C for bay extension works at 400kV Sonepat S/S -I, II and125 MVAR Bus Reactor Bay. 3PGCILD,S,E,T,C for bay extension works at 400kV Hosur S/S. 4PGCILD,S,E,T,C for bay extension works at 400kV Madurai S/S for 63 MVar Karaikudi line reactor. 5PGCILD,S,E,T,C for bay extension works at 400kV Trichy S/S. 6PGCILD,S,E,T,C for bay extension works at 400kV Udumalpeth S/S. 7PGCIL (Thru BHEL)E,T,C of 400/220 kV Thiruvananthapuram S/S. 8PGCIL (Thru BHEL)E,T,C of 400 kV Madurai S/S (extension bays). 9TNEB (Thru BHEL)E,T,C of 400/30/110 kV Alamathy switchyard. 10PGCIL (Thru ABB)E,T,C of 400/220 kV Hiriyur S/S. 11KPTCL( Thru BHEL)E,T,C of 400 kV Guttur switchyard (extension bays) 12IRCON InternationalE,T,C of 400 kV Mapusa S/S 13PGCIL(Thru Alstom)E,T,C of 400 kV Upper Indravati S/S. 14NLC (Thru TATA Projects) E,T,C of 400/220/33 kV Neyveli S/S. 15UPCL (Thru Alstom)E,T,C of 400/220 kV Muzzafarnagar switchyard.

15 Project Glimpse Substation S.No.ClientProject Details 220 KV Class 1KPTCL (Thru Alstom)S,E,T,C of 220/110/66kV MRS Shimoga switchyard. 2KPTCLD,S,E,T,C of 220/66/11 kV Huygonahalli substation. 3KPTCLD,S,E,T,C of 220/66 kV & 66/11 kV Naganathapura S/S. 4KPTCLD,S,E,T,C of establishing 220/66 kV Kushalnagar substation. 5Delhi TRANSCO Ltd. (Thru BHEL) E,T,C for 230/33 kV switchyard. 6NLC (Thru L&T)E,T,C of 220/11 kV Neyvelli switchtyard. 7GRIDCO, Orissa (Thru TATA Projects) E,T,C for 220/33 kV Barkote & Rairak switchyard. 8Tanir Bavi Power Company(Thru ABB) E,T,C of 220 kV Mangalore S/S. 9BGR EnergyE/T/C of 230/11kV GIS Substation at Hyundai Motors India Ltd. 10BSES LimitedE/T/C of 220/11 KV, 2x40 MVA, 2 bay switchyard

16 Our Accomplishments Mr. Amul Gabrani, Chairman & Managing Director(L) and Mr. Ajay Kumar Bishnoi, Director(R) receiving the “SME of the Year” & “Most Promising SME in Power & Telecom Sector” – CRISIL powered CNBC-TV18-ICICI Bank Emerging India Awards 2012,on behalf of Hythro Power Corporation Ltd.

17 Installations

18

19

20

21 Working Experience In Snow

22

23

24

25 THANK-YOU


Download ppt "Hythro Power Corporation Limited.. Hythro: Inception & Background Hythro was established in the year 1989. Part of ‘Tecpro Group’, a leading EPC business."

Similar presentations


Ads by Google