1 APGENCO Profile & Performance. 2 A NDHRA PRADESH POWER GENERATION CORPORATION LIMITED (APGENCO) WAS ESTABLISHED BY GOVERNMENT OF ANDHRA PRADESH UNDER.

Similar presentations


Presentation on theme: "1 APGENCO Profile & Performance. 2 A NDHRA PRADESH POWER GENERATION CORPORATION LIMITED (APGENCO) WAS ESTABLISHED BY GOVERNMENT OF ANDHRA PRADESH UNDER."— Presentation transcript:

1 1 APGENCO Profile & Performance

2 2 A NDHRA PRADESH POWER GENERATION CORPORATION LIMITED (APGENCO) WAS ESTABLISHED BY GOVERNMENT OF ANDHRA PRADESH UNDER THE ANDHRA PRADESH ELECTRICITY REFORM ACT 1998 ON 01-02-’99 WITH THE PRINCIPAL OBJECT OF ENGAGING IN THE BUSINESS OF GENERATION OF ELECTRICITY

3 3 EXISTING STRUCTURE OF POWER SECTOR IN ANDHRA PRADESH APERCAPERC

4 4 Installed Capacity – Thermal Kothagudem TPSs 700 MW + 500 MW Vijayawada TPS 1260 MW Rayalaseema TPS 420 MW Ramagundam TPS 62.5 MW Nellore TPS 30 MW Total: 2972.5 MW

5 5 Installed Capacity - Hydro Nagarjunasagar 965.6 MW Srisailam-LBPH 900 MW Lower Sileru 460 MW Others and Mini HES 65 MW Wind - 2 MW Machkund 84 MW (120 MW) T.B.Dam 57.6 MW (72 MW) Singur 15 MW Total: 3584.2 MW Upper Sileru 240 MW Srisailam-RBPH 770 MW Donkarayi 25 MW

6 6 VTPS 1260 MW + 660 MW (Proposed) GTPS 272 MW (O&M Contract) KTPS 700 MW KTPS-V 500 MW RTS-B 62.5 MW RTPP 420 MW + 420 MW (Proposed) NTS 30 MW MACHKUND 84 MW UPPER SILERU 240 MW LOWER SILERU 460 MW DONKARAYI 25 MW POCHAMPAD 27 MW NIZAMSAGAR 10 MW SINGUR 15 MW NSRCPH 90 MW NSLCPH 60 MW N’SAGAR 815.6 MW SLBPH 900 MW TB DAM 57.6 MW PABR 20 MW SRBPH 770 MW R.KRISHNA R.TUNGABADRA R.PENNA R.MANJEERA R.SILERU R.KINNERASANI GENERATING STATIONS OF APGENCO R.GODAVARI JURALA 234 MW (Proposed) PEDDAPALLI MINI HYDRO 5 MW + 4 MW (Under Construction) TAILPOND DAM 50 MW (Proposed) Thermal 2972.5 MW Hydro 3584.2 MW APGENCO 6556.7 MW DUMMUGUDEM 360 MW (Proposed)

7 7APGENCO 3 rd Largest Generation Utility in the Country Installed Capacity (MW) NTPC 21,249 MSEB 9,743 APGENCO 6,557

8 8 O&M costs of VTPS In Rs. Lakhs * 1 st April to 30 th September

9 9 O&M costs of KTS-D in Rs.Lakhs * 1 st April to 30 th September

10 10 O&M costs of RTPP in Rs.Lakhs * 1 st April to 30 th September

11 11 Abstract of O & M costs in Rs Lakhs/MW

12 12 O&M costs of Sileru complex (725 MW) in Rs. Lakhs * 1 st April to 30 th September

13 13 * 1 st April to 30 th September O&M costs of N.Sagar complex (960 MW) in Rs. Lakhs

14 14 O&M costs of Srisailam RB (770 MW) in Rs. Lakhs * 1 st April to 30 th September

15 15 Availability of hydro stations (%)

16 16 Station wise Thermal Generation (MU) * 1 st April to 31 st October

17 17 Station wise Performance (PLF) * 1 st April to 31 st October

18 18 Awards Won by Generating Stations

19 19 Steps for improving the availability  Ensuring availability of Critical spares and Consumables  Reduction of forced outages in number and time  Compressing the period of planned outages  Better preventive maintenance works  Personal involvement at highest level  Ensuring availability of skilled staff and specialists to supervise the breakdown/planned works round the clock  Capital Overhauls planned on condition monitoring basis instead of manufacturers recommendations  Ensuring availability of stand-by-equipment to avoid partial load operation of the unit

20 20 Forced outages in Numbers * Upto Sep’03

21 21 Planned outages duration in Percentage * Upto Sep’03

22 22 Forced outages duration in Percentage * Upto Sep’03

23 23 Availability in Percentage * Upto Sep’03

24 24 Plant load factor in Percentage * Upto Sep’03

25 25 Loading factor in Percentage * Upto Sep’03

26 26 Specific oil Consumption in ml/Kwh * Upto Sep’03

27 27 Heat Rate in Kcal/ Kwh * Upto Sep’03

28 28 Auxiliary consumption in Percentage * Upto Sep’03

29 29 GCV of coal received in Kcal/ Kg * Upto Sep’03

30 30 Design parameters

31 31 APGENCO - Thermal Units - Annual Overhaul

32 32 Effects of ABT & Merit Order dispatch on parameters  Though we have achieved very good parameters in respect of Heat Rate, Secondary oil consumption, availability factor, PLF and forced outage rate, it may not be possible for APGENCO to achieve such performance in future years under ABT/ Merit Order regime and considering ageing of the plants.  During this year for the last seven months, back down of Generation is 300 MU which works out to 2.31% of total generation. Now under ABT/ Merit Order dispatch, we have to reduce the load to the extent of 40% of rated capacity of the unit which will adversely affect the following parameters. 1. Increase in Heat Rate due to partial load operation. 2. Increase in secondary oil consumption as single mill operation has to be resorted, requiring oil support for stabilization of the flame. 3. Increase in Auxiliary consumption due to operation of Auxiliaries at partial load. 4. Forced outage rate will increase due to frequent variation of the load affecting the pressure parts

33 33 Thank you

34 34 Supplementary information

35 35 Installed Capacity during last 6 years in AP * 1 st April to 15 th September

36 36 Capacity Additions (MW) in AP * 1 st April to 15 th September

37 37 APGENCO PROPOSED ADDITIONS

38 38 Heat Rate variation w.r.t. designed value (%) * Upto Sep’03

39 39 Vintage of the units in Years