Presentation is loading. Please wait.

Presentation is loading. Please wait.

G4S Technology G4S Technology Iberdrola USA Case Study.

Similar presentations


Presentation on theme: "G4S Technology G4S Technology Iberdrola USA Case Study."— Presentation transcript:

1 G4S Technology G4S Technology Iberdrola USA Case Study

2 G4S Technology Iberdrola USA- Part of a Global Organization  US Operations of parent, Iberdrola S.A  3 main business units  Iberdrola USA Networks  Iberdrola Renewables  Iberdrola Energy Holdings  Project focus on Iberdola USA Networks  Rochester Gas & Electric  New York State Electric & Gas  Central Maine Power  System deployments for Iberdrola Renewables

3 G4S Technology Iberdrola USA Needs  Access Control Upgrade for Global Standardization  Video Management System upgrades to meet NY PUC Agreement  Security Operations Centers  Rochester NY upgrade  Augusta ME new facility  Migration plan from existing systems  NERC CIP requirements  Systems  Migration plan  Corporate IT Network  Guidelines  Bandwidth limitations

4 G4S Technology Why G4S PLC  G4S Technology is part of G4S, the world’s leading security solutions provider  More than 620,000 employees, 3rd largest private employer globally  Operations in 125 countries across six continents  Complete Solution Provider Security and Networking Integrator  Financial strength with unlimited bonding capacity Headquarters: United Kingdom Area Served: Worldwide Key People: John Connolly (Chairman) Ashley Almanza (CEO) Revenue: $12.3 Billion Employees: 620,000 Subsidiaries: G4S Secure Solutions G4S Technology Website: g4s.com

5 About G4S Technology Advanced Communication Networks and Security Systems Award-winning Safety Program Best Value Designed Solutions (large bids; complex proposals) Leading Turn-key Solution Provider to Public + Private Sectors Full-service Global Systems Integration Company Converged Solutions to Ensure Network Compatibility + Reliability

6 G4S Technology Project Challenges The Challenges…. Iberdrola USA IT requirements Geographic regions ACS Cutover (Maine/New York) NERC/CIP Reporting/Requirements Upgrade of SOCs Global ACS deployment (miFare Cards) AMAG Global V7.01 Differences between global sites, USA, and Renewables Overall project schedule

7 G4S Technology Global Involvement Martin Hildebrandt Project Director Project Management Spain Jon Shacklock Project Management UK Brian Fallon Project Management US Andy Downing Jon Shacklock Technical Coordinator Access Control upgrades in Spain and Scotland Card standardization G4S teams located in each country and UK

8 G4S Technology The G4S Technology Solution

9 G4S Technology Solution Attributes AMAG – Access Control Platform – Global Solution – NERC CIP vetted Agent VI – Video Analytics Activu – Video Integration – Deployed at 2 SOCs and 1 ECC – Video Display Flexibility

10 G4S Technology Where is Iberdrola Headed? Standardization – National and Global ECAST Manual – “Energy Critical Assets Secured Through Technology” – Engineering/Construction/Application/Services/Technical – Module based manual matching phases of project along with alignment of resources across global teams Leverage Security Assets Thermography Expansion of systems/solution Additional sites VoIP Future solution adds

11 G4S Technology Questions


Download ppt "G4S Technology G4S Technology Iberdrola USA Case Study."

Similar presentations


Ads by Google