Presentation is loading. Please wait.

Presentation is loading. Please wait.

Commercial Orbital Transportation System (COTS) Status

Similar presentations


Presentation on theme: "Commercial Orbital Transportation System (COTS) Status"— Presentation transcript:

1 Commercial Orbital Transportation System (COTS) Status
For Section 508 Compliance, all photos, illustrations and/or graphics include a descriptive caption. All charts in this package include a background image of Earth as viewed from space. Commercial Orbital Transportation System (COTS) Status NASA Advisory Council Kennedy Space Center February 5, 2009 John Logsdon

2 SpaceX COTS System Description and Features: Falcon 9 Launch Vehicle
Dragon Crew/Cargo Spacecraft Flexible crew and cargo configurations Recoverable launch vehicle and spacecraft Cape Canaveral LC-40 Launch Site ISS Flight Demonstration: March 2010 NASA Investment: Cargo Demonstration – up to $278 M Crew Demonstration Option– up to $308 M (not funded) Dragon Crew Dragon Cargo Falcon 9 Launch Complex at KSC

3 SpaceX Milestone Tracking

4 Orbital COTS System Description & Features:
Taurus II Launch Vehicle – derivative of Taurus I with Aerojet AJ-26 engines (2) & Castor 30 2nd stage Standard Service Module used for all missions – derived from STAR™ & Dawn spacecrafts Pressurized Cargo Module (PCM): Heritage - ISS MPLM Unpressurized Cargo Module (UCM): Heritage - ISS ExPRESS Logistics Carrier Wallops Flight Facility Launch Site ISS Flight Demonstration: December 2010 NASA Investment: Cargo Demonstration – up to $170 M Pressurized Cargo Module (w/ Service Module) Unpressurized Cargo Module (w/ Service Module) Taurus II Launch Complex at Wallops Island VA

5 Orbital Milestone Tracking
Updated per SAA Amendment 1

6 COTS Flight Demonstration Schedule
2008 2009 2010 2011 Cargo Demo Flight 1 (Jun 09) Cargo Demo Flight 2 (Nov 09) Cargo Demo Flight 3 to ISS (Mar 10) Cargo Demo Flight 1 to ISS (Dec 10)

7 ISS Commercial Resupply Services
COTS Phase II -- ISS Commercial Resupply Services (CRS) contract awarded December 23, 2008 SpaceX: 12 cargo missions , $1.6 B Orbital: 8 cargo missions 2011 – 2015, $1.9 B PlanetSpace protest under review with GAO Artist’s Rendition of Fully Assembled ISS in Orbit


Download ppt "Commercial Orbital Transportation System (COTS) Status"

Similar presentations


Ads by Google