Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bonners Ferry Ranger District Road Decommissioning 10/20/2009.

Similar presentations


Presentation on theme: "Bonners Ferry Ranger District Road Decommissioning 10/20/2009."— Presentation transcript:

1 Bonners Ferry Ranger District Road Decommissioning 10/20/2009

2 Includes… Roads that were rendered hydrologically inert Past 5 years 2004-2009 Watershed location Also identifies proposed road decommissioning

3 Decommissioned Roads Most in Myrtle Creek Watershed Boundary Creek Watershed Proposed Decom. in Boulder Cr. and Myrtle Cr.

4

5 Myrtle Creek Road NetworkMileage 13090.7 24000.4 240512.0 6332.7 Total  15.8 Completed: Proposed: Road NetworkMileage 24118.8 26921.3 Total  10.1 2008 IDEQ Integrated Report Impairments Water Temperature

6 2405A-Deep Ripping

7 1309-Full Recontour

8

9 Boundary Creek Road NetworkMileage 24505.65 Completed: 2008 IDEQ Integrated Report EPA Approved TMDL for Temperature

10

11 Boulder Creek (Proposed) Road NetworkMileage 21122.0 21732.4 26274.2 Total  8.6 2008 IDEQ Integrated Report Impairments Temperature Combined Biota/Habitat Bioassessments Proposed:

12 Summary WatershedMiles of road completed Myrtle Creek15.75 Boundary Creek5.65 TOTAL  21.4 WatershedMiles of road proposed Myrtle10.1 Boulder8.6 Total  18.7 Total Completed within 5 years on the Bonners Ferry RD Total currently proposed on BFRD

13 Thanks! and Questions?


Download ppt "Bonners Ferry Ranger District Road Decommissioning 10/20/2009."

Similar presentations


Ads by Google