Presentation is loading. Please wait.

Presentation is loading. Please wait.

PROFILE OF KATHUA DISTRICT S. NoItemMagnitude 1Geographical Area2502 Sq. Kms 2Population as per Census, 2011615711 3Sex Ratio877 4No. of Constituencies05.

Similar presentations


Presentation on theme: "PROFILE OF KATHUA DISTRICT S. NoItemMagnitude 1Geographical Area2502 Sq. Kms 2Population as per Census, 2011615711 3Sex Ratio877 4No. of Constituencies05."— Presentation transcript:

1 PROFILE OF KATHUA DISTRICT S. NoItemMagnitude 1Geographical Area2502 Sq. Kms 2Population as per Census, Sex Ratio877 4No. of Constituencies05 5No. of Blocks08 6No. of Border Blocks03 7No. of Panchayats244 8No. of Villages512 9Govt. Ayurvedic Dispensaries45 10 Govt. Allopathic Health Institutions193 a) District Hospital01 b) Mahatma Gandhi Hospital01

2 PROFILE OF KATHUA DISTRICT S. NoItemMagnitude c ) Community Health Centres 05 d) Public Health Centres24 b) New Type PHCs11 c) Sub Centres151 11Asha Workers657 12Rogi Kalyan Samities42 13Vill. Health Sanitation Committees517 14No. of Vety. Institutions118 15No. of Sheep Extension Centres53 16Govt. Educational Institutions1428 a) Govt. Degree Colleges06 b) Higher Sec. School37

3 PROFILE OF KATHUA DISTRICT S. NoItemMagnitude c) High School104 d) Middle School365 e) KGBV04 f) Pry.School912 17Literacy Rate (2011)73.50 a) Male literacy b) Female literacy Drop-out rate (Elementary Level) ITIs04

4 Plan Performance, (Distt. Plan) #Component Approved Outlay Availability Exp. ending March 2013 % age of Exp against availability IRevenue IICapital 1State Share NABARD Loan LIC Loan Tied Grant Projectized Total Capital Grand Total (Rs. In Lacs)

5 Financial & Physical Progress under Different Programmes

6 FINANCIAL ACHIEVEMENT (PHE-MNP) ## #Sector Approved Outlay AvailabilityExp. ending March, 2013 % age of Exp 1Revenue Capital  State Share  NABARD  LIC Additionality Total Capital Grand Total (Rs. In Lacs) District Plan

7 HABITATIONS COVERED BY PROVIDING POTABLE DRINKING WATER # Particular i) Total habitations1019 ii) Habitations fully covered537 iii) Habitations partially covered482

8 PHYSICAL ACHIEVEMENT PHE (MNP) #Name of the Sector / Scheme UnitTargetAchievement 1PHE  Targeted SchemesNos.11  Habitation to be covered Nos.31  Mohras to be covered Nos.1310  Population covered Souls District Plan

9 MAJOR FLAGSHIP PROGRAMME-NRDWP # Particular i) No. of schemes149 ii) Estimated costRs Cr. iii) Cumm.Expenditure ending 3/2012Rs Cr. v) Approved OutlayRs Cr. vi) Funds available during Rs Cr. vi) Exp. during ending 03/2013Rs Cr. Physical Target & Achievements TargetAchievement a) No. of schemes 1613 b) No. of Habitations 5040 c) Total population benefited C S S

10 CONSTRUCTION OF GLNS GSR AT TUEN UNDER WSS JANNU (NABARD) ESTIMATED COST = RS 4.99 LACS WSS JANNU BLOCK BASOHLI EST. COST = RS LACS Date of Start 04/2012 Target dt. of completion of Scheme

11 CONSTRUCTION OF 0.30 LAC GLNS GSR AT VILLAGE UPPER KHAROTE = Rs 5.75 Lacs WSS DRALLAN KHAROTE (NRDWP COVERAGE), ESTIMATED COST = RS LACS Dt. of start 06/2012 Target dt. of completion of Scheme

12 CONSTRUCTION OF DUG WELL AT KHABEL IN PROGRESS = Rs Lacs WSS JUTHANA (NRDWP COVERAGE), ESTIMATED COST = RS LACS Dt. of start 01/2013 Target dt. of completion of Scheme

13 CONST. OF 5000 GLNS RAPID SAND FILTERATION PLANT AT KHALIAD = RS LACS CONSTITUENCY – BASOHLI, WSS KHALAID (NRDWP COVERAGE), ESTIMATED COST = RS LACS Dt. of start 04/2012 Target dt. of completion of Scheme

14 AVAILABLE INFRASTRUCTURE OF POWER DEV. DEPTT. (POWER) ## #Item Status 1Grid Stations 04 Nos. 2Receiving Stations 41 Nos. 333/11, 66/11 KV Power Transformers 56 Nos. 4Distribution Transformers 3418 Nos. 5Total Install Capacity MVA 6Total Line length (66KV) Km 7Total Line Length (33 KV) Km 8Total Line 11 KV Km 9Total LT Line Km 10Total No. of 11 KV Feeder 112 No.

15 PHYSICAL/FINANCIAL ACHIEVEMENT (POWER) #Item Status 1Approved outlay lacs 2Funds Available lacs 3Expenditure lacs 4Transformers Repaired 424 Nos. District Plan

16 REPAIR OF ELECTRIC TRANSFORMERS UNDER DISTRICT PLAN

17 RAJIV GANDHI GRAMEEN VIDYUTIKARAN YOJNA VILLAGE WISE STATUS 1No. of villages under RGGVY (548-72)476 2Villages Electrified476 3Taken over certificate (TOC) issued by PDD470 HAMLET WISE STATUS 4No. of hamlets under RGGVY1123 5Completed1123 6TOC issued by PDD1117 Flagship/CSS #

18 FINANCIAL ACHIEVEMENT (EDUCATION SECTOR) ## #Component Original Outlay AvailabilityExpdt % age 1 Elementary Education SSA Adult Edu Sec. Edu Teachers Edu RMSA Total (Rs. In Lacs) District Plan

19 PHYSICAL ACHIEVEMENT (EDUCATION) #Name of the Sector / Scheme UnitTargetAchievement Elementary Education  Opening of Pry. Schools (SSA)Nos. Nil25 (Against the target of )  Mid Day Meal Stds  Free Supply of Text Books Nos  Scholarship to G&B Students.Stds  Const. of Kitchen sheds. Nos  Const. of ACRs in MS. Nos Completed 28 in progress  Const. of ACRs in HS Nos completed, 32 in progress District Plan

20 PHYSICAL ACHIEVEMENT UNDER SSA S. No ItemAch Cumm. Ach. 1RETs Engaged RETs Regularized New Schools Opened PS upgraded to MS No. of RETs engaged in EGS upgraded as NPS Flagship/C S S

21 STATUS OF CIVIL WORKS TAKEN UP UNDER SSA #ParticularTargetCompleted i)PS buildings ii)Additional Class Rooms iii)Upper Pry School Buildings2115 iv)CRC buildings3731 v)BRC buildings0605 Flagship/C S S

22 PROGRESS UNDER RMSA #Particular i)MS upgraded to HS during : Total35 ii)Buildings approved for const. in Newly Upgraded HS : 35 iii)Buildings taken up for construction.12 (iv)Building completed01 Flagship/C S S

23 RMSA PHASE Ist AAA Cost = Rs Lacs Targeted Date of Completion May 2013 ADDITIONAL ACCOMMODATION IN NEWLY UPGRADED HIGH SCHOOL AT SUMWAN UNDER RMSA ( )

24 RMSA PHASE IInd AAA Cost = Rs lacs ADDITIONAL ACCOMMODATION IN NEWLY UPGRADED HIGH SCHOOL AT BHALLAR COMPLETED UNDER RMSA ( )

25 04 NOS. CLASSROOMS IN H.S.S AT PARANALLA AAA COST= Rs Lacs Expt. Rs Lacs Date of Start 01/ 2010 Date of Completion 03/ 2014 ADDL.CLASSROOMS IN H.S.S AT PARANALLA UNDER STATE SECTOR

26 FINANCIAL ACHIEVEMENT (HEALTH) ## # Component Approved Outlay AvailabilityExpenditure%age of Exp 1Revenue Capital  Projectized  NABARD Loan Total Capital Grand Total (Rs. In Lacs) District Plan

27 PHYSICAL ACHIEVEMENT (H EALTH) #Name of the Sector / Scheme UnitTotal schemes Status 1Const. of PHC Blds.Nos.08 1 completed 7 in progress 2Const. of S/C Blds.Nos completed 24 in progress 3Const. of NTPHC Blds.Nos.04 Work in progress 4Repair of SC buildingsNos.02 1 completed,1in progress District Plan

28 S. No Name of the work/ scheme` Works taken up Works completed Estt. Cost Exp. during Cumm. Exp. ending March 2013 a)PHC (Normal Plan) b) PHC (NABARD) NTPHC Sub Centre Others Distt. Plan Total STATUS OF HEALTH BUILDINGS

29 CHC AT BASOHLI AAA COST= Rs Lacs. Expt. = Rs Lacs CHC AT BASOHLI UNDER STATE SECTOR AAA COST= Rs Lacs. Expt. = Rs Lacs Dt. of Start Target Dt. of Compl. 03/2014

30 Completed under Distt. Plan Est. Cost = Rs lacs

31 ( under Distt. Plan Est. Cost Rs lacs Exp. Rs lac Target dt. of comp. 03/2014

32 FINANCIAL ACHIEVEMENT PWD (R&B) ## #Component Approved Outlay AvailabilityExpenditure%age of Exp 1 Capital  Projectized  NABARD Loan Total Capital Grand Total (Rs. In Lacs) District Plan

33 PHYSICAL ACHIEVEMENT PWD (R&B) #Item Unit TargetAchievement a) Black ToppingKm b) MetallingKm c) ShinglingKm d) Fair weather roadKm Schemes completedNo. 05 District Plan

34 FINANCIAL ACHIEVEMENT PWD (R&B) #Component Approved Outlay AvailabilityExpenditure%age of Exp 1 Capital  Projectized  NABARD Loan Total Capital (Rs. In Lacs) State Plan

35 PHYSICAL ACHIEVEMENT PWD (R&B) #Item Unit TargetAchievement a) Black ToppingKm b) MetallingKm c) Shingling Km d) Fair weather roadKm e) BridgesNo. 04 State Plan

36 PWD (R&B)

37 CONST. OF BALTA TO STOE ROAD UPTO PLAIL Under State-Plan-NABARD Date of start 01/2012 Est. Cost. Rs lac Target date of completion 08/2014 Exp. 03/2013 Rs Lacs

38 CONSTRUCTION OF DIARA SUNARI LINK ROAD Under District Plan Est. Cost. Rs lac Target date of completion 03/2014 Exp. 03/2013 Rs.34.61

39 Pradhan Mantri Gram Sadak Yojana ## a) Schemes sanctioned (Phase-I to VIII) 55 b) Sanctioned costRs Cr. c) Cum. Exp. Ending 03/2013Rs Cr. d) No. of schemes completed28 e) Targeted Habitations215 f) Habitations connected ending 03/ g) Length of sanctioned schemes Km. h) Length achieved of completed schemes Km.

40 STATUS OF LAND COMPENSATION UNDER PMGSY S.No. ItemMagnitude 1Total No. of Schemes43 No. 2No. of Schemes involving Land Compensation 35 No. 3No. of Schemes Joint Inspection completed 35 No. 4Final Award issued21 No. 5Land Compensation advance to various Collectors lac 6Total Land Compensation disbursed lacs 7Addl. Land Compensation requisitioned by Collectors against Final Award cases lacs

41 Name of road:- Jandrali to Bhikher under PMGSY Stage-I Completed

42 Name of the Road:- Kholiyan Talie to Smodth under PMGSY Work is in Progress

43 Name of the Road:- Sundla to Chunera Work is in progress

44 FINANCIAL ACHIEVEMENT (MINOR IRRIGATION) ## #Component Approved Outlay AvailabilityExpenditure%age of Exp 1 Capital  State Share  TIED/AIBP Total Capital (Rs. In Lacs) District Plan

45 PHYSICAL ACHIEVEMENT (MINOR IRRIGATION) #Name of the Sector / Scheme Unit TargetAchievement Minor Irrigation 1Potential created Hect Stabilization Hect Schemes Completed No. 22 (AIBP) District Plan

46 Construction of Dhalli Khul in Hiranagar under AIBP Est. Cost. Rs lac Exp. Rs lac Dt. of start 02/2012 Target dt. of com. 03/2014

47 Construction of Bana Chack Khul in Hiranagar under AIBP Est. Cost. Rs lac Exp. Rs lac Dt. of start 02/2012 Target dt. of com. 03/2014

48 FINANCIAL ACHIEVEMENT (AGRICULTURE) ## #Component Approved Outlay AvailabilityExpenditure%age of Exp 1Revenue Capital State Share Total Capital Grand Total (Rs. In Lacs) District Plan

49 PHYSICAL ACHIEVEMENT (AGRICULTURE UNDER DIFFERENT PROG.) #Item/crop Unit TargetAchievement 1Seeds Distribution  Agriculture Crops Qtls  Vegetables+Potato Qtls Fertilizer Distributed Ton Agri. Equipments  Spray Pumps No.1280  Others (Improved Agri implements) No Training camps held No.171 5Farmers Trained No.8143

50 TECHNOLOGY MISSION - AGRICULTURE

51 FINANCIAL ACHIEVEMENT (HORTICULTURE)-DIFFERENT PROGRAMMES S.No. SchemeApproved Outlay Availabilit y Exp.%age 1.District Plan Horticulture Mission for North Eastern and Himalayan States (HMNEH) Rashtriya Krishi Vikas Yojana (RKVY) Agriculture Technology Management Agency (ATMA) (Rs. In Lacs)

52 PHYSICAL ACHIEVEMENT UNDER HORTICULTURE SECTOR #SchemeUNITPHYSICAL TARGET PHYSICAL ACHIEVEMENTS 1Area covered under fruit plantation Ha Fruit and vegetables processed MT Mobile demonstrations Nos145 4Ladies trainedNos90 District Plan

53 ESTABLISHED MANGO ORCHARD AT SAHAR IN BLOCK KATHUA UNDER TECHNOLOGY MISSION

54 FINANCIAL ACHIEVEMENT (SOCIAL WELFARE) ## #Sector Approved Outlay AvailabilityExpenditure%age of Exp 1Social Welfare Welfare of SC/OBC (Rs. In Lacs) District Plan

55 PHYSICAL ACHIEVEMENT (SOCIAL WELFARE & SC/OBC) #Item UnitTargetAchievement 1Pre-matric Scholarship Students Re-imbursement of examination fee Students8083 3Education up-liftment of children of Sweeper Community Students5046 4Scholarship to physically handicapped Students District Plan

56 #Item Fund availableExpenditureAchievement (Beneficiaries) 1ISSS State Plan PHYSICAL/FINANCIAL ACHIEVEMENT UNDER INTEGRATED SOCIAL SECURITY SCHEME (ISSS) (SOCIAL WELFARE )

57 PHYSICAL/FINANCIAL ACHIEVEMENT UNDER NATIONAL SOCIAL ASSISTANCE PROGRAMME (NSAP) (SOCIAL WELFARE ) #Item Fund available Exp.Achievement (Beneficiaries) 1Indira Gandhi National Oldage Pension Scheme (IGNOAPS) Indira Gandhi National Widow Pension Scheme (IGNWPS) Indira Gandhi National Disabled Pension Scheme (IGNDPS) National Family Benefit Scheme (NFBS) C S S

58 PENDENCY UNDER DIFFERENT PENSION SCHEMES (SOCIAL WELFARE ) #SchemePendency in Nos. 1Integrated Social Security Scheme (ISSS)4709 2Indira Gandhi National Oldage Pension Scheme (IGNOAPS) Indira Gandhi National Widow Pension Scheme (IGNWPS) 461 4Indira Gandhi National Disabled Pension Scheme (IGNDPS) 340 5National Family Benefit Scheme (NFBS)481

59 PHYSICAL ACHIEVEMENT (PMEGP/JKSES) ## # Name of the Sector / Scheme Unit TargetSponsored SanctionedDisbursed JKSESNos PMEGP  DICNos  KVIBNos Total PMEGPNos

60 PHYSICAL/FINANCIAL ACHIEVEMENT UNDER VSA (SKEWPY) i)No. of male candidates benefitted1024 ii)No. of female candidates benefitted737 iii)Amount of VSA disbursed to male candidates Rs lac iv)Amount of VSA disbursed to female candidates Rs lac Total amount disbursed during Rs lac

61 IMAGES OF ENTERPRENEURS FINANCED UNDER JKSSES SAMEER GUPTA,KALIBARI KATHUA GENERAL STORE

62 DEEPAK KAPOOR WARD NO. 1 KATHUA, AUTO LOAD CARRIER

63 MAJOR FLAGSHIP PROGRAMME MGNREGA ## i)Availability a) State ShareRs lac b) Central ShareRs lac c) Misc/OBRs lac TotalRs lac ii)Expenditure ending March, 2013Rs lac iii)No. of Rural Households83377 No. iv)No. of Job Cards issued50329 No. v)Mandays Generated12.44 lac vi)Women persondays generated0.904 lac vii)No. of households provided 100 days employment 498 households. vii)Works taken up/completed7746/5462 Nos. C S S

64 AWARD UNDER PANCHAYAT EMPOWERMENT ACCOUNTABILITY INITIATIVE SCHEME  Out of three Panchayats of the State, two Panchayats of Kathua District namely Kootah of Hiranagar Block and Nagrota of Barnoti have been awarded under P E A I S

65

66

67 CONST. OF POND AT LOKHALLY PYT.. CHILAKH WEST BLOCK HIRANAGAR UNDER MGNREGA Est. Cost. Rs lacs completed during

68 CONST. OF POND AT JUMBLE PYT.MANGLOOR BLOCK HIRANAGAR UNDER MGNREGA Est. Cost. Rs lacs completed during

69

70 INDIRA AWAS YOJANA (IAY) #SchemeOutlay Availability Expdt. S/SC/S 1IAY Normal RHS G. Total (Rs. in Lac) #Scheme Taken upCompleted Construction of Houses - - 1IAY Normal Rural Housing Scheme4132 C S S

71 Constt. of House under IAY, Sh. Bodh Raj R/o Rappad, Pyt. Bhajwal, Block, Kathua

72 PHYSICAL UNDER NIRMAL BHARAT ABHIYAN (Erstwhile TSC) ## #SchemeTotal Target Ach. Ending 3/2012 Target Ach. During Cum. Ach. Ending 3/ IHHL School Toilets Anganwari Toilets Community Sanitary Complexes Note: Low physical achievements was due to less availability of funds and late start of works after the completion of Base Line Survey under NBA conducted during Oct. 2012

73

74

75

76 BORDER AREA DEV. PROGRAMME (FINANCIAL) i)Approved Outlay Rs lac ii)Funds operated centrally for Skill Dev. Rs lac iii)Funds released to the District Rs lac iv)Additionality/Revalidated Amount Rs lac v)Total availabilityRs lac vi)ExpenditureRs lac (99.20%) C S S

77 BORDER AREA DEV. PROGRAMME (PHYSICAL) 1No. of Rural Dev. works taken up/completed 41/33 2Creation of new Sub Stations8 3Shallow Hand Pumps172 Road constructed/upgraded I)Black topping5.80 Km II)Metalling13.60 Km iii)Shingling9.90 Km iv)Fair weather7.15 Km C S S

78 AUGMENTATION/CREATION OF SUB STN. UNDER BADP Augmentation of Sub Station at Mirpur Ram Est. Cost Rs lac Completed 03/2013 Creation of Sub Station at Mirpur Ram Est. Cost Rs lacs Comp. 03/2013

79 CREATION OF SUB STN. UNDER RURAL ELECTRIFICATION PUMP SETS (CSS) Creation of 100 KVA S/STN at Jarmal Est. Cost Rs lac Completed 03/2013 Creation of Sub Station at Haripur Est. Cost Rs lacs Compl. 03/2013

80 WIDENING/STRENGTHENING OF KALIBARI-KATHUA- HATLI MORE ROAD UNDER ADB BY ERA PACKAGE Cost = Rs Cr. Target date of completion – 04/2013 ## ItemScope of WorkUpto date progress Earth Work6.57 Km Drain12500 RM12485RM Bituminous Macadam Major Bridge11 (Completed) Canal Bridge22 (Completed) Kerb Stone5 Km4.825 Km Retaining Wall300 RM

81 KALIBARI – KATHUA – HATLIMORH AFTER DEVELOPMENT

82 ARIEL VIEW OF KALIBARI – KATHUA – HATLIMORH ROAD

83 CATEGORY-WISE FAMILIES,RATION/KEROSENE OIL DEPOTS AND LPG AGENCIES S. No.Item 1Total Population (Census 2001) APL Families BPL Families AAY Families APS Souls512 6Total No. of families Govt. Ration Depots33 8 Cooperative Ration/K.Oil Dealers04 / 34 9 Private Ration/K.Oil Dealers225 / No. of LPG Agencies08 11 Total No. of LPG domestic Connections 61863

84 REQUIREMENT/ALLOTMENT OF FOODGRAINS AND SUGAR S. No.ItemRequirementAllotmentShortfall 1APL Families BPL Families AAY Families APS Souls51 -- Total Levy Sugar Fig. In Qtls.

85 PROGRESS UNDER RIGHT TO INFORMATION ACT Total Application received upto Disposed ofIst Appeal received Ist Appeal disposed off

86 PROGRESS UNDER PUBLIC SERVICE GURANTEE ACT Total Application received upto Disposed off Pending under time limit No. of appeals received by Ist Appellant Authority Fine/Penality imposed

87 PROGRESS UNDER LAND ACQUISITION #ItemNational HighwayBorder Fencing PMGSY 1 No. of Vill. involved in LA 48 No.17 No. 39 No 5 Final Award Land involved Handed over Balance (Fig.in No.) 1 Amt. deposited Cr Cr. 3 Amt. disbursed Cr 4 Balance Cr 5 Addl. Funds required Cr

88 PROGRESS UNDER LAND ACQUISITION #ItemNational HighwayBorder Fencing PMGSY 1 Amt. deposited Amt. disbursed Balance Addl. Funds required (Rs. in Cr.)

89 PHYSICAL ACHIEVEMENTS OF LAST THREE YEARS OF REGIONAL TRANSPORT OFFICE,KATHUA,H.Q. LAKHANPUROF S.No.Particulars Registration of Vehicles Route Permits Fresh Route Permits Renewed Fitness Fresh Fitness Renewed Driving License Fresh Endorsement for HGV/LMV Endorsement for PSV Driving License Renewed Learner License

90 PHYSICAL ACHIEVEMENTS OF LAST THREE YEARS OF REGIONAL TRANSPORT OFFICE, KATHUA,H.Q. LAKHANPUR S. No. Particulars Token Tax Registration fee D/ License fee T.Permission Fee Fitness Fee Route Permit Road Checking Toll Posts Tax under SRO Total: Rs. In Cr.

91 REVENUE REALISED BY TOLL POSTS OF KATHUA DISTRICT DURING & ## S. No.Toll Post ALakhanpur BMinor Toll Post 1Nagri Goond Govindsar Hatmashka Kote Punnu Mandi Mandikan Paharpur Thein Gandiyal (Kerian) C Cost of Forms etc Total Revenue Rs. In lacs.

92 REVENUE REALISED BY COMMERCIAL TAXES DEPTT. LAKHANPUR DURING & ## S. No.Item Passenger Tax Penalty Security Entry Tax Advance Tax Total Rs. In lacs.

93 Some Major Projects of the District -in pictures

94 OBC HOSTEL AT BASOHLI AAA COST= Rs Lacs Expt. Rs Lacs. Workdone Liabilities= Rs Lacs OBC HOSTEL AT BASOHLI

95 #

96 EXCISE AND COMMERCIAL TAXES OFFICE, TOLL PLAZA LAKHANPUR

97 PARKING YARD FOR TRUCKS AT TOLL PLAZA LAKHANPUR

98 MATA BALA SUNDRI JI DISTRICT KATHUA WAYSIDE AMENITY AT BASE CAMP NEAR BHEENI BRIDGE BILLAWAR COMPLETED at Estd. Cost. of Rs lacs # #

99 WAYSIDE AMENITY AT BASE CAMP NEAR Kharote More Kali Bari at Estd. Cost. of Rs lacs

100 CONSTRUCTION OF POLYTECHNIC COLLEGE AT KATHUA ESTD. COST RS EXP. 03/2013 RS LACS LIKELY DT. OF COMP. 12/2014 # #

101 Construction of 311m span bridge over Tarnah Nallah at Magloor under State Plan Estd. Cost. Rs lacs Exp. 03/2013 Rs lacs Likely date of Com. 03/2015

102 MAJOR ISSUES

103 Construction of 1100 mtr Span Double Lane Bridge at village, Keerian Gandyal. Est. Cost.Rs lac DPR submited to PW (R&B) Department. Village to be benefitted = 03 Souls to be benefitted = 10,000 Construction of drain along NH-1A from Janglote More to Kathua Khad. Length of drain 1.3 Km. Approx. CostRs Cr. Matter taken up by Hon’ble CM with Hon’ble Minister of Roads, Transport and Highways. GOI.

104 Present Status of Drain along NH-1A from Janglote More to Kathua Khad

105 Illegal Extraction of River Bed Material from Ravi River.

106 ILLEGAL MINING IN RIVER RAVI

107 Replacement of Worn-out and purchase of standby Pumping Machinery : Total Pumping Stations 345 Nos. P/Stns. which require standby machinery 266 Nos Cost of purchase of stand by machinery Cr. Liability on account of supply of water through tanker service : LiabilityRs Lac Damages due to heavy rains and snow falls. The year wise liability accrued: Rs lac Rs lac Rs lac. Total - Rs lac.

108 Education Department 4 posts of Principals, 5 posts of ZEOs, 2 post of ZEPOs, 167 posts of Lecturers, 34 posts of Headmasters, 91 posts of Masters and 940 posts of Teachers are lying vacant in the District. Health Department 139 posts of Doctors, 252 posts of Para Medical Staff and 177 posts of Class-IV and Safai Karamcharies are lying vacant in the District. Construction of Inter State Bus Terminal in Village Chak Sajjan.. Construction of Fly Over and Installation of Signal Lights. Untied grants

109 Thank You


Download ppt "PROFILE OF KATHUA DISTRICT S. NoItemMagnitude 1Geographical Area2502 Sq. Kms 2Population as per Census, 2011615711 3Sex Ratio877 4No. of Constituencies05."

Similar presentations


Ads by Google