1 Heavy Engineering Corporation Ltd. Partnering growth in the Coal industry

2  Unique Integrated Engineering facilities with complete line of manufacturing o Starting from Casting, Forging, Fabrication, Machining, Assembly and Testing all located at one place.  It has huge manufacturing facilities and engineering capability backed by 60 years of experience.  HEC pioneered manufacturing heavy mining equipment o In 1966, HEC supplied the first 5 CuM Rope Shovel and contributed significantly in mechanization of Coal mining in India. Heavy Engineering Corporation Ltd.

3 Four Operating units located at one place – Seamless integration Executes Turn- key projects from Concept to commissioning Manufacturer of CNC and Conventional Machine Tools Unique machining facilities Assembly & Testing facilities Research & product Development Wing Steel Melting & Refining facilities Forging facilities Foundry Forge Plant Heavy Machine Building Plant Project Division Heavy Machine Tools Plant

4 HEC contributes by way of Manufacture and supply of equipment Mining Equipment Mineral processing Equipment Executing Turn- key Projects Coal Handling Plant Coal Washery

5 Electric Rope Shovel – 5 CuM HEC is the only Indian manufacturer Time tested equipment Over 590 nos. supplied till date Large population already in CIL No additional training required Low Spares inventory cost Less cost of Ownership Less operation & maintenance cost Less capital cost per cum of material handled No air pollution Long working life Average working life is 20 years Can handle more than 1.7 million cubic meter of material in a year. A rugged machine Workable in all mining conditions

6 Electric Rope Shovel – 10 CuM Time tested & proven equipment Over 30 nos. supplied till date A rugged machine No air pollution Long working life Presently executing order of 4 nos. for MCL Can handle more than 2.7 million cubic meter of material in a year. Less cost of ownership

7 Dragline – 24/96 Time tested & proven equipment Over 13 nos. supplied till date CIL is well conversant with the machine Ongoing manufacturing of 2 Draglines gives advantage to take more orders in pipeline. No air pollution Long working life Can handle more than 4.33 million cubic meter of material in a year. Capital cost per cum material handled is lowest Lowest cost of ownership

8 A wide range of Crushers Gyratory Crusher Cone Crusher Jaw Crusher Two Roll Crusher Four Roll Crusher Single Roll Sinter Crusher Reversible Hammer Mill Vibrating Screens Apron feeders Rod & Ball Mills etc… Gyratory Crusher Cone Crusher Jaw Crusher Two Roll Crusher Four Roll Crusher Single Roll Sinter Crusher Reversible Hammer Mill Vibrating Screens Apron feeders Rod & Ball Mills etc…

9 9 Turn-key Projects Major Coal Handling Plants Executed: Bina at NCL (4.5 mT/yr) Jayant at NCL (10 mT/yr) Nigahi at NCL (10 mT/yr)

10 Turn-key Projects Projects under execution Ore Handling Plant and Coal Handling plant at BSP, Bhilai Ore Bedding & Blending Plant at RSP, Rourkela Coal handling plant – Krishnashila, NCL Iron ore handling plant Meghataburu, SAIL Coal Washery, Madhuband, BCCL Stacker-cum-Reclaimer Wagon TipplerTwin-boom Stacker

11 Support to produce 1 billion Ton coal With Existing product range:

12 Support to produce 1 billion Ton coal On the cards Joint manufacturing of 20 cum Rope Shovel with BEML.  Developmental order requested for 20 cum Rope Shovel Tie-up with foreign companies for Dozers, Loaders etc. Exploring possibility of tie-up for  Hydraulic Excavators  Continuous Miners etc. Target for additional contribution of 200 Million Ton by HEC

13 Support to produce 1 billion Ton coal HEC supplied mine winders to different mines of CIL in the past. HEC presently has an overseas associate in this area and shall be able to support CIL in terms of engineering and supply of equipment for new installations. HEC is also capable for refurbishment of mine winders. Gearing-up for specific contribution in Mine Winders

14 Support for additional need of mineral processing and mineral beneficiation Leverage high level of acquired expertise and experience  To provide complete solution for economical crushing.  Execute concept to commissioning of Turn-key projects in: Coal Handling Plant Coal Washery

15 Other areas of business Steel & Metallurgical Plant equipment Machine Tools Defence & Strategic Sector Heavy Castings & Forgings

16 Assure dedicated support in CIL’s plan to touch 1 billion Ton Coal mining capacity by 2019-20. Thanks


Download ppt "Heavy Engineering Corporation Ltd. Partnering growth in the Coal industry."

Similar presentations


Ads by Google