IL PROBLEMA Macchina in KCHF Costo 95 Aumento 02 Magneti 1474 174 Criogenia 324 34 Radiofrequenze Beamcleaning 160 29 Slowcontrol etc Transfer lines 114.

Similar presentations


Presentation on theme: "IL PROBLEMA Macchina in KCHF Costo 95 Aumento 02 Magneti 1474 174 Criogenia 324 34 Radiofrequenze Beamcleaning 160 29 Slowcontrol etc Transfer lines 114."— Presentation transcript:

1 IL PROBLEMA Macchina in KCHF Costo 95 Aumento 02 Magneti 1474 174 Criogenia 324 34 Radiofrequenze Beamcleaning 160 29 Slowcontrol etc Transfer lines 114 5 Civil engineering 140 55 Service installation 127 55 Final integration 0 60 Experimental areas 254 63 Total 2593 475 LHC +475 Prototyping +143 CERN detect + 56 CERN comput +120 Savings -143 TOTALE +651 EXTRACOSTI del CERN

2 1Riduzione tempo di fascio del 30% 2Riduzione “industrial service support” 3Austerità: viaggi-conferenze-auto 4Taglio in R&D per rivelatori ed acceleratori del 30% 5 Riduzione per “subsistance allowances” 6Fine di CHORUS-CERN 7Moratoria per OPERA-CERN 8Ritardo dell’investimento CNGS RISPARMIO DI 33.5 MCHF RITARDO DI LHC DI UN ANNO : RISPARMIO DI 123MCHF BUDGET 2002 STRAT02

3 NON LHC-PROGRAM Experiments 2001 2002 2003 2004 2005 COMPASS - - - - - - ------------------------------ - - - - - - - - - NA48 ----------------------------------------------- NA49 ---------------------------- - - - - - NA60 ----------------------------------------------- PS fixed target DIRAC ----------------------------- - - - - - - HARP ------------------- - - - - AD ASACUSA ----------------------------------------------------------------------------- ATHENA ----------------------------------------------------------------------------- ATRAP ----------------------------------------------------------------------------- Other Facilities ISOLDE ----------------------------------------------------------------------------- n-TOF -------------------------------------------------- - - - - - - - - CAST - - - - - - - ------------------------------------------ OPERA - - - - - - - - - - - - - - - - - - - - --------------- PLANNING

4 NUMERO DI UTILIZZATORI del CERN----non LHC Programma May-01 Nov-01 Beam Test 74 71 Fix-Target 829 807 General Collab 169 221 Heavy Ions 243 196 ISOLDE+nTOF 282 294 LEAR/AD 185 143 LEP 1324 1040 R&D 52 44 TOTALE 3158 2816 UTILIZZATORI

5 R&D al CERN KCHF Material Budget Staff(Man-year) Fell&Ass Attività 2001 2002 2001 2002 2002 SC cavities 300 0 2.3 1.8 0 CLIC-CTF3 4640 4290 39.0 37.0 7 SPL 250 360 2.5 4.0 0  beams 1125 0 9.0 5.0 2 Other 885 200 5.0 2.0 0 TOTALE 7200 4850 57.8 49.8 9 MAT-BUD02

6 KCHF heads heads Material Budget Staff Fell&Assoc 2001 2002 2002 2003 2002 SPS Fix-Targ 2080 1150 18 18 14 PS Fix-Targ 2715 645 13 13 13 Resto 865 295 10 10 8 Neutrino 1000 780 12 11 4 LEP 3175 895 22 11 34 TOTALE 10160 3765 76 63 73 BUDGET02

7 COSA SUCCEDE? Nominate 5 “Task Forces”: 1)Research Program - D.Schlatter, L.Camilleri, F.Gianotti, W.von Ruden, J.Lefrancois 2) Organisational Structure - H.Wenninger, T.Camporesi, T.Lagrange, Ph.Bryant, T.PettersonG.van Middelkop 3) Industrial Support and Contracts - K.H.Kissler, D.Blechschmidt, P.Ciriani, A.Kurz,A.Gamp 4) Personnel - J.Ferguson, P.Schmid, V.Hatton, M.Vitasse, F.Bordry, P.Geeraert, A.Pritzker 5) Accelerator Sector - S.Myers, J.P.Delahaye, Ph.Lebrun, D.Lewis + un comitato Esterno di “consulenti” COSA

8 PROGRAMMA............................ Febbraio 2002 Relazioni dalle Task-Forces interne Marzo 2002 Relazione della Commissione Esterna June 2002 Relazione finale Commissione Esterna Piano a tempi brevi 2003-2006 Piano a tempi lunghi 2003-2013 PROGRAMMA


Download ppt "IL PROBLEMA Macchina in KCHF Costo 95 Aumento 02 Magneti 1474 174 Criogenia 324 34 Radiofrequenze Beamcleaning 160 29 Slowcontrol etc Transfer lines 114."