Presentation is loading. Please wait.

Presentation is loading. Please wait.

MOUNT MICHAEL BENEDICTINE – TEAM II. Marilynn Theis Sponsor Drafting Teacher Marilynn Theis Sponsor Drafting Teacher Chris Langan Mentor Lamp Rynearson.

Similar presentations


Presentation on theme: "MOUNT MICHAEL BENEDICTINE – TEAM II. Marilynn Theis Sponsor Drafting Teacher Marilynn Theis Sponsor Drafting Teacher Chris Langan Mentor Lamp Rynearson."— Presentation transcript:

1 MOUNT MICHAEL BENEDICTINE – TEAM II

2 Marilynn Theis Sponsor Drafting Teacher Marilynn Theis Sponsor Drafting Teacher Chris Langan Mentor Lamp Rynearson Chris Langan Mentor Lamp Rynearson Jason Schmitz Mentor DLR Group Jason Schmitz Mentor DLR Group Kalle Haines Team Leader Book Editor Revit Kalle Haines Team Leader Book Editor Revit

3 Alex Miklas Landscaping Pavilion Design Alex Miklas Landscaping Pavilion Design Jacob Ramaekers Amphitheater Design Revit 3-D Models Jacob Ramaekers Amphitheater Design Revit 3-D Models Walter Wear Amphitheater Design 3-D Models Walter Wear Amphitheater Design 3-D Models Jacob Hudson Book Editor Research Jacob Hudson Book Editor Research Aaron Meyer Accoustics Research Applied Science Aaron Meyer Accoustics Research Applied Science Jacob Bova Stage Design Drama Expert Jacob Bova Stage Design Drama Expert Matt Davis Research Grading Presentation Matt Davis Research Grading Presentation Malik Amao Bathroom Design Title Block Malik Amao Bathroom Design Title Block Jeremiah Connealy Cost Analysis Pavilion Design Research Jeremiah Connealy Cost Analysis Pavilion Design Research

4 100 % Growth in the last 10 years School needs: – A place for drama – A place for masses – Student- Parent Events – Space for Fall Festival

5 Fall Family Picnic Fall Festival Grandparent’s NightGraduation All School Mass

6 Dr. David Peters President and Principal Mt. Michael Benedictine The Monastic Community Mount Michael Benedictine Abbey Mount Michael Student Body Noelle Kunkel & Bro. Roger Mangel Drama Department

7 Permanent Seating for 250 Blend with the school architecture Picnic Area to accommodate the Fall Picnic and other family gatherings Theatrical Lighting and Sound Equipment

8

9 Pioneer Park - Lincoln Sumpter Amphitheater - Papillion

10 Multi-Use Facility New Construction Accommodate – Fall Family Picnic – Wednesday Night Visits – All School Masses – Concerts – Plays

11 Site #1 – Northeast of the baseball field Site #2 – North of the Mt. Michael Road

12 Positives Scenic View Close to the Student Parking Lot Negatives Higher grading costs No close paved surfaces

13 Positives Handicap accessible Lower cost of grading More Visual impact as you enter the Campus Negatives Potential Drainage issue Distance from current student parking lot

14 Site # 2 Less Grading Position of the Sun Access to the Road

15 Theater and Pavilion Parking

16 A stage area 30’ x 40’ Sound System Theater Lights Ticket Booth Storage

17 30’ x 40’ Performing Area Overhang Storage Area

18 3 Sections – Middle 200 stadium seats – Sides 200 on benches – Grass seating for 730 5,857 Square Feet 4 Square Feet per person Handicap Accessible

19 Acoustics – Researched natural sound reflection – Changed stage back wall shape – Determined best scale – Checked where sound reflected – Confirmed shape and size

20 Spherical vs. Parabolic Shape

21 h = f tan2θ = R tanθ f = R/2 R = 2f

22 Picnic Tables Fire pit Recycled Plastic Benches Ticket booth

23 Occupancy – 1200 Code Requirements: Women’s Restroom – 6 Stalls 1 Handicap stall Men’s Restroom – 3 Urinals 1 Stall 1 Handicap Stall

24 Location – Accessible to both the Theater and the Pavilion

25 Occupancy Handicap Parking Requirements 8 Stalls 9’ X 18’ Accessible to the Theater and the Pavilion

26 Survey of Energy Needs Vertical Axis Wind Turbine High speed is not required Close to self-sufficient Wind Speed (m/s) Annual Energy Output (kWh) Wind Speed (m/s) Annual Energy Output (kWh)

27

28

29 3D printing: simply melting plastic Stage, Pavilion, Seating – Technical issues – Limitations – Troubleshooting

30 Recent Previous Projects – Bell Tower – Football Field – Track Resurfacing – Baseball Field Donated Labor – Pink Grading Company – Bateco

31 Takes longer to draw Building codes Acoustics Learning Revit Teamwork Meeting Deadlines

32 Chris Langon P.E., Mentor – Lamp Rynearson Jason Schmitz AIA, Mentor - DLR Group Dr. David Peters The Monks of the Mount Michael Community Students, Parents & Alums of Mount Michael Mount Michael Faculty Aeolos Wind Energy LTD Sarah and Vincent Carson-Brown Nebraska Shakespeare Company

33 MOUNT MICHAEL BENEDICTINE – TEAM II

34


Download ppt "MOUNT MICHAEL BENEDICTINE – TEAM II. Marilynn Theis Sponsor Drafting Teacher Marilynn Theis Sponsor Drafting Teacher Chris Langan Mentor Lamp Rynearson."

Similar presentations


Ads by Google