1 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO

2 2 Company Profile Trinidad Spain London HQ London Stock Exchange- listed March 2007 Producing Oilfields- Trinidad and Spain Staff- 50 (All local) Net Production Capacity bopd 2P Reserves- 7.6 mmbbls Market Cap- approx. £90 million

3 3 London Management and Board of Directors ChairmanDavid Lenigas Holds a Bachelor of Applied Science in Mining Engineering and has 30 years of resources industry experience. Until recently he was the Executive Chairman of Lonrho plc. David is also the Executive Chairman of Stellar Resources plc, Solo Oil plc, Rare Earth Minerals plc and AfriAg plc. Chief Executive Officer Neil Ritson Has a BSc in Geophysics. He has worked in the energy sector for over 35 years, initially with BP plc for 23 years before managing the international operations of Burlington Resources Inc. and more recently as CEO at Regal Petroleum plc, before founding the Vanguard Energy Group where he was Chairman and CEO. He is a Director of Solo Oil plc and a Non-Executive at Enovation Resources Ltd. Chief Operating Officer Fergus Jenkins Is a Chartered Engineer with a BEng in Mining Engineering and a MEng in Petroleum Engineering. He has over 20 years of experience working in industry, initially in mining before moving to petroleum, where he has worked for most of his career in mid-sized independent oil companies, including Enterprise Oil, LASMO, OMV (UK) Ltd and Afren plc. Finance DirectorJames Thadchanamoorthy Has a degree in Chemistry and is a qualified accountant. He has 18 years’ experience, including over 10 years spent at BP where he held a number of commercial and finance leadership positions. Non-Executive Director Steve Horton Holds a BSc in Mining Engineering and an MBA. He has 35 years experience working in the energy industry including 27 years with BP plc where he held executive roles including worldwide Director of Drilling. He co-founded Silverstone Energy Limited in Steve is a Non-executive Director of Seamwell Limited and, until the recent merger, of Valiant Petroleum plc.

4 4 TRINIDAD

5 5 Current Trinidad Assets Over 7,500 acres of largely unexplored 100% owned private oil leases in the Cedros and adjacent rights held in partnership with Beach Oilfield Limited Trinidad Head Office, San Fernando Goudron IPSC (100%) with 2P reserves of 7.2 mmbbls and over 60 mmbbls of contingent resources associated with a future water flood Icacos Field in the Cedros Peninsula (50%, non-operator), producing ~35 bopd from three wells HOA to acquire the Trinity-Inness IPSC from Rex Caribbean

6 6 Goudron Phase 1 Goudron well GY-257 Reactivated 2012

7 7 Spudded first well, GY-664, on 28 April Completed well GY-664 on 30 May in 278 feet of Gros Morne GY-665, TD on 8 June GY-666, TD on 1 July GY-667, TD on 30 July All wells are expected to be Gros Morne production wells Spudded GY-668 on 9 August drilling ahead in Goudron Sandstone Goudron Phase 2 - Drilling Results to date Rig 20 on GY-665, 7 June 2014

8 8 Well GY-664 First new well on the field for over 32 years Drilled from the central camp area Found 571 feet of net oil pay within 3 reservoirs Completed over an interval of 278 feet of Gros Morne Initial flow rate 240 bopd 37 API oil through a 7/32” choke at a flowing pressure of 660 psi Choked back to 6/32” pressure stable at 540 psi

9 9 Production of 240 bopd through a 7/32-inch choke Constrained production rate

10 10 Excellent log characteristics ‘130 foot’ Gros Morne sandstone in GY-667

11 11 Structure – Top Gros Morne Pad 1 Pad 2

12 12 Drilling Pad 3 Well 6 Well 7 Well 8 Well Third new drill site currently under construction Expect to drill 4 wells Provisionally 1 Goudron only, 2 Goudron/Gros Morne wells and 1 well to the Lower Cruse Continue to use Well Services Rig 20 First well will spud after GY- 668 Wells GY-665 to 668 will be placed on production

13 13 Trinity-Inness

14 Trinity-Inness Asset Summary 14 Installing new well tanks Petrotrin IPSC field 20 km from Goudron Current production bopd from approx. 25 active wells Herrera Sandstone at depth of 1,500 – 5,000 feet Five tank batteries and a 1,500 barrel sales tank Average degree API oil exported directly by pipeline to Pointe-a-Pierre Approx immediate reactivation targets, and an existing CEC for 12 new wells Trinity-Inness sales tank facility

15 15 Cedros Peninsula

16 LGO Cedros Lease Position 16 Installing new well tanks Beach Oilfield Cedros Leases Icacos Leases TED 3D Seismic Bonasse Field Icacos Field LGO Cedros Leases Galpha Point FRM-1 Deep Well

17 Plans for the Cedros 17 Installing new well tanks In collaboration with Beach Oilfield and Dr Krishna Persad; re-evaluate all existing data and wells Acquired a soil geochemistry survey to isolate micro-seepage and areas of fractionated light oil Plan to fly a high resolution gravity and magnetics survey Acquire additional 2D seismic data if necessary to define well locations Drill at least one deep exploration well to test the potential at Herrera Sandstone level Galpha Point Mud Volcano

18 18 SPAIN Ayoluengo Field, Cantabrian National Park, Spain

19 19 Future Potential Enhance production through the side-tracking of existing wells Development of Hontomin as a low cost satellite using existing 3D seismic and re-entry of existing wells Development of Tozo as either a micro-Compressed Natural Gas or Gas-to-Wire project Deepen Ayoluengo to the proven Liassic reservoirs Sub-lease the unconventional gas exploration potential

20 20 Financials

21 21 Revenue: 2010 to 2014E Portfolio has been repositioned to focus on growth Acceleration of the development of Trinidad Spain will be optimised until the extension is confirmed Goudron production coming on line in Q Current Production

22 22 Gross Profit: 2010 to 2014E In 2013 Gross Profit was broadly flat Higher Trinidad volumes were partially offset by lower sales in Spain Gross Profit will rise in 2014 in line with significant growth in volumes Goudron production coming on line in Q Current Production

23 23 Share Price Performance

24 Forward Looking Statements 24 Certain statements in this presentation are “forward looking statements” which are not based on historical facts but rather on the management’s expectations regarding the Company's future growth. These expectations include the results of operations, performance, future capital, other expenditures (amount, nature and sources of funding thereof), competitive advantages, planned exploration and development drilling activity including the results of such drilling activity, business prospects and opportunities. Such statements reflect management's current beliefs and assumptions and are based on information currently available. Forward looking statements involve significant known risks, unknown risks and uncertainties. A number of factors could cause the actual results to differ materially from the results denoted in these statements, including risks associated with vulnerability to general economic market and business conditions, competition, environmental and other regulatory changes, the results of exploration, development drilling and related activities, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although these statements are based upon what management believes to be reasonable assumptions, the Company cannot assure investors that the actual results will be consistent with these forward looking statements.