 Project Status  Accident Data  Comparison with Other State Routes  Alternatives  Next Steps.

Similar presentations


Presentation on theme: " Project Status  Accident Data  Comparison with Other State Routes  Alternatives  Next Steps."— Presentation transcript:

1

2  Project Status  Accident Data  Comparison with Other State Routes  Alternatives  Next Steps

3  Project Study Report (Complete )  Project Report (Jan 2015)  Environmental (Jan 2015)  Design (June/2016)  Construction (July 2017)

4  Highway 17 Santa Cruz/Santa Clara County  Highway 50 El Dorado County  Highway 18 San Bernardino County

5

6

7

8 * = With Concrete Barrier * * DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 5SANTA CRUZ 4SANTA CLARA TOTAL DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 3EL DORADO DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 8SAN BERNARDINO Highway 17 Highway 50 Highway 18

9 SR-18 SBd CO10 YEAR- 1hr duration PREClPITATlON (IN) LOCATION ELEVATION (FT)AVEPEAKPEAKLATITUDELONGITUDE PM SR-17 SCR/SCL Co10 YEAR- 1hr duration PRECIPITATION (IN)LOCATION ELEVATION (FT)AVEPEAKLATITUDELONGITUDE PMPM / ' SR-50 ED Co10 YEAR- 1hr duration PRECIPITATION (IN)LOCATION ELEVATION (FT)AVEPEAKLATITUDELONGITUDE PMPM

10 Ten Year Data 4/1/02 - 3/31/12 - Fatal Collisions = 13 - Injury Collisions = 79 - Property Damage = 39 Total Collisions = 131 Fatalities = 16 Injuries = 157

11  Concrete Barrier  Metal Beam Guardrail  Cable Barrier  Delineators  Reconfigure Lanes

12

13

14

15

16

17 NO BUILD

18  Review All Input Received  Examine Effectiveness of Each Alternative  Solicit Additional Comments from Stakeholders  Install Delineators on Top Section of SR-18  September - Present Proposed Solution for Entire Route (Lake Arrowhead Disaster Meeting)

19 One Final Message

20 Questions ??