1/22 2011. 1. 19 Measures to Advance Basic Administrative Infrastructure (“BAI”) For Better Convenience and Social Efficiency.

Similar presentations


Presentation on theme: "1/22 2011. 1. 19 Measures to Advance Basic Administrative Infrastructure (“BAI”) For Better Convenience and Social Efficiency."— Presentation transcript:

1 1/ Measures to Advance Basic Administrative Infrastructure (“BAI”) For Better Convenience and Social Efficiency

2 2/22 Status of BAI Background Advancement Plan Desired Effects Contents

3 3/22 Background

4 4/ Background Foreign visitors X520 increase etc Mail quantity Population Cellular Phone Automobile Foreigner Unit:Thousand (Mail:million) Administrative environment has rapidly changed for the past 50 years Population X2, Mail quantity X8, Automobile X350 Social adjustment costs increase due to inappropriate BAI (e.g. address system, territory system, postal code, etc.) Annual navigation cost 2.1T, supply cost 0.89T, corporate address refinement cost 8.9M (KRW) Advancing Basic Administrative Infrastructure to reduce social cost and enhance convenience in accordance with the change in social environment

5 5/22 Status of BAI

6 6/22 1 Address System BAI Status 2 Territory System 4 Road Sign 3 Branch Number 5 English Notation Use of lot numbers – difficult to navigate and against international trend No standard territory system – independent management among institutions No unified branching system – independent management among institutions Territory/branch based signs – does not comply with road names Romanization – difficult to read for foreigners

7 7/227/30 7/33 Advancement Plan

8 8/22 Advancement Plan Lot AddressRoad Name Address Territory System Institutional BaseNational Base Territory Branch Number InstitutionalNational Road Sign BranchRoad Name English Notation RomanizationStandard English Address System Enhance National Competitiveness through Advancing BAI Enhance National Competitiveness through Advancing BAI

9 9/ Status & Needs Advancement Plan Adopting Road Name Address System Using land based lot number since 1910s - Disordered lot number (House number 1 next to 60, more than one buildings in a lot number) Majority of countries use road name address -Implementing Address ISO ('09.May~) Raised supplementations to road name address - Low uniqueness in road names, long road names, etc.

10 10/22 Advancement Plan 1 1 Schedule Notification Address Change Guidelines and confirmation of new address to citizens ’11.Mar~Jul Use Parallel Use (’11 Jul~Dec) / Full Use (‘12 Jan~) ’11.Jul~ ’11.Jul~Dec Adopting Road Name Address System Advancement Plan Implementing road name address that is easy to find & conforming to international standard - Naming roads and consecutively numbering buildings for address Policies for enhancing road name address receptivity - Reflecting Inherent names, simplifying long road names, directions in road names - Extending parallel use, supporting private sector address change, diversifying PR Change public registrations (1,095 including resident/construction) Schedule Notification Address Change Confirm & notify new address Change 1,095 public registrations (residence, etc.) ’11.Mar~Jul Use Parallel Use ( ’11.Jul~Dec) / Full Use( ’12.Jan~) ’11.Jul~ ’11.Jul~Dec

11 11/22 Advancement Plan 1 1 Schedule Notification Address Change Guidelines and confirmation of new address to citizens ’11.Mar~Jul Use Parallel Use (’11 Jul~Dec) / Full Use (‘12 Jan~) ’11.Jul~ ’11.Jul~Dec Adopting Road Name Address System Advancement Plan Implementing road name address that is easy to find & conforming to international standard - Naming roads and consecutively numbering buildings for address Policies for enhancing road name address receptivity - Reflecting Inherent names, simplifying long road names, directions in road names - Extending parallel use, supporting private sector address change, diversifying PR Change public registrations (1,095 including resident/construction) Schedule Notification Address Change Confirm & notify new address Change 1,095 public registrations (residence, etc.) ’11.Mar~Jul Use Parallel Use ( ’11.Jul~Dec) / Full Use( ’12.Jan~) ’11.Jul~ ’11.Jul~Dec Ex. of New Address Saimdang-ro1gil Saimdang-ro2gil Saimdang-ro3gil Road Name Dae-ro : 8 lanes + Ro : 2~7 lanes Gil : others Building Number 20m interval left odd, right even “Banpo Dae-ro”

12 12/ ( Ex. of Jongno) Admin Firefight Police Commute(elem.) Mail Status & Needs Advancement Plan Adopting National Territory System Managing administrative territory separately by each institution · Firefight (law sector, lot number) · Police (law sector, lot number) · School (elementary/middle: bracket, high: admin sector) · Mail (Mixed use of law/admin sectors) - Difficulty in sharing territorial statistics due to different standards - Limitation in information use due to large Basic Administrative Service Territories - Address refinement costs due to frequent changes in admin sectors

13 13/22 Advancement Plan 2 2 Current Territory SystemBasic Territory System(Plan) City Province District 119 Firefighting Police Law SectorAdmin. Sector Lot No. Bracket Group Joint House Name Large Sector Basic Unit Sector Basic Territory Statistical Sector School (Elem.) Mail Statistical Sector School (Elem.) Mail Adopting National Territory System Advancement Plan Nationally set/manage minimal unit of basic territory for both public & private use ( U.S. Blocks, U.K. Output Areas, etc.) District 119 Firefighting Police City Province Admin. Sector ※ Unifying different territorial units to Basic Territory

14 14/ Setup Use Schedule Territory Setup Demo Management Full Use Full use in public/private jurisdiction territories ’12~’13 ’11.Dec ’14~ Plan Adopting National Territory System Advancement Plan 30,500 territories based on admin. sector boundaries etc. - 8~9 considering geographical layouts, population, businesses, etc. - Granting 5 digit territory number for the basic territory Public & private sector use ※ Public : Police, Firefighting, Mailing / Private : Commerce· Analyses Demo Plan Confirmation National Setup Re-notify demo management & jurisdiction territories

15 15/22 Adopting National Branch System 3 3 Locate through geographical layouts in case of areas without buildings such as fields, mountains, and streams Lack of unification/relations among institutions - Firefighting (Sign), Maritime Police (breakwater), National Park (Sign), KEPCO (Pole) ※ Independent management of mountain area location signs Inconvenience and difficulty in systematic disaster response Firefighting Maritime Police National Park KEPCO Status & Needs Advancement Plan

16 16/22 Advancement Plan Schedule Nationwide signs of branch number in grid coordinate concept - More simplified and systemized than longitude & latitude coordinates ※ U.S. USNG (United State National Grid), Ex.18UJ Installing unified branch number signs to areas with most frequent access Joint utilization in numerous emergency situations for Emergency Management Agency, Police Agency, Maritime Police etc. 3 3 Infra construction Use Institutionalize/construct branch number system in areas without buildings In phases (communications use other use) ’13.Jan~ ~’12.Dec Adopting National Branch System Advancement Plan

17 17/22 Advancement Plan Schedule Nationwide signs of branch number in grid coordinate concept - More simplified and systemized than longitude & latitude coordinates ※ U.S. USNG (United State National Grid), Ex.18UJ Installing unified branch number signs to areas with most frequent access Joint utilization in numerous emergency situations for Emergency Management Agency, Police Agency, Maritime Police etc. 3 3 Infra construction Use Institutionalize/construct branch number system in areas without buildings In phases (communications use other use) ’13.Jan~ ~’12.Dec Adopting National Branch System Advancement Plan Branch Number (Ex.) 마바 마바 (100×100 ㎞ ) (10×10m) ※ Ex.: 마바 Control point 마바 “Branch Number”

18 18/22 Status & Needs ※ Many countries use road name guidance within city areas Road Sign 4 4 Guiding through area, structure names or branch - Guiding name is discontinuous and confusing due to lack of relativity - Difficult to read due to overwhelming information in limited sized signs Advancement Plan

19 19/22 Current Road Signs Division New Road Name Signs Examples 5.5m×1.35m4.5m×1.2m Information (Center) road names, (sub) land/structure names Land/structure names Converting to “Korean Road Name Method” linked to new address Advancement Plan Road Sign 4 4 Schedule Alternatives Sign Replacement Finalize new road signs after demo service Replace road signs in phases in nationwide cities ’13~’17 ~end of ’12 Advancement Plan

20 20/22 Romanization for English notation of Korean Status & Needs · Nature/cultural property : 독도 (Dokdo), 속리산 (Songnisan), 연화교 (Yeonhwagyo) · Admin. district : 도 (do), 시 (si), 군 (gun), 구 (gu), 읍 (eup), 면 (myeon) · Road name : 대로 (daero), 로 (ro), 길 (gil) - English address becomes too lengthy due to Romanizations ※ 56 Supsokmaeul-ro Ilsandong-gu, Goyang-si, Gyeonggi-do - English address becomes too lengthy due to Romanizations ※ 56 Supsokmaeul-ro Ilsandong-gu, Goyang-si, Gyeonggi-do - Notation by pronunciation causing confusion to foreigners ※ Pronunciation (daero, ro, gil) VS. English (Blvd, St, Rd) - Notation by pronunciation causing confusion to foreigners ※ Pronunciation (daero, ro, gil) VS. English (Blvd, St, Rd) English Notation of Road Address 5 5 Advancement Plan

21 21/22 Simplified Admin. District (Ex.) Consider English notation(Blvd, St, Rd) in Tourist spot etc. Advancement Plan Schedule Alternatives Priority Application English notation of address(plan) through converging opinions of professionals Priority application in guide maps, apply when issuing English documents ’12~ ~’11.Sep ※ Replace during road signs maintenance (renewal) (‘14~) · (Si·Do) Busan Metropolitan BS / Chungcheongbuk-do CB · (Si·Gun·Gu) Jangan-gu Suwon-si Jangan Suwon · (Eup·Myeon) Kanghwa-eup Kanghwa / Buseok-myeon Buseok · (Si·Do) Busan Metropolitan BS / Chungcheongbuk-do CB · (Si·Gun·Gu) Jangan-gu Suwon-si Jangan Suwon · (Eup·Myeon) Kanghwa-eup Kanghwa / Buseok-myeon Buseok 5 5 English Notation of Road Address Advancement Plan

22 22/22 Current English Notation 100 Jukdol-gil, Buseok-myeon, Taean-gun, Chungcheongnam-do, ROK # , 56 Supsokmaeul-ro, Ilsandong-gu, Goyang-si, Gyeonggi-do, ROK International Standard of English Notions of Korean (ex.) Improved English Notation (Plan) # , 56 Supsokmaeul St, Ilsandong, Goyang, GG, ROK 100 Jukdol Rd, Buseok, Taean, CN, ROK 5 5 English Notation of Road Address Advancement Plan

23 23/22 Enhancement of National Competitiveness through Advancing Basic Administrative Infrastructure Advance living environment and reduce social costs 1 Realize safety through better disaster response system 2 Increase convenience by advancing basic administration 3 Standardize Basic Administrative Infrastructure 4 Desired Effects

24 24/2224/30 Thank You