Presentation is loading. Please wait.

Presentation is loading. Please wait.

ORGANISATION CHART OF RSRDC UNIT-1, AJMER RE Rakesh Kr. Jain AAO Sh. Shiv Kr. Sharma ARE Sh. Brijesh Kr. Mathur ARE Sh. N.K. Tak ARE. Sh. Avinash Kumar.

Similar presentations


Presentation on theme: "ORGANISATION CHART OF RSRDC UNIT-1, AJMER RE Rakesh Kr. Jain AAO Sh. Shiv Kr. Sharma ARE Sh. Brijesh Kr. Mathur ARE Sh. N.K. Tak ARE. Sh. Avinash Kumar."— Presentation transcript:

1

2 ORGANISATION CHART OF RSRDC UNIT-1, AJMER RE Rakesh Kr. Jain AAO Sh. Shiv Kr. Sharma ARE Sh. Brijesh Kr. Mathur ARE Sh. N.K. Tak ARE. Sh. Avinash Kumar ARE Sh. J.P. Kansal ARE Sh. Harsh Rai J.En. (Elect.) Sh. O.P. Sharma

3 Financial Work Load in Unit S. No.Name of WorkClient Deptt.A& F SanctionExpenditure till dateBalance Work ARE – I Sh. Brijesh Mathur 1 Parking space at G/F & F/F, Office chamber on S/F and Auditorium on 3 rd floor at BSER, Ajmer B.S.E.R., Ajmer st floor & 2 nd floor over old answer book at BSER, Ajmer B.S.E.R., Ajmer Total Rs. in Lacs.

4 Financial Work Load in Unit S. No. Name of WorkClient Deptt.A& F SanctionExpenditure till date Balance Work ARE – II Sh. N.K. Tak 1Urban Hatt Bazar, AjmerIndustries Deptt LSQ at GRP Campus, Nareli, Ajmer (Part-IV) Police Deptt USQ+LSQ at 11 th RAC Battalion, Nareli, Ajmer (Part-I & II) Police Deptt Company Store & Office for 11 th RAC Battalion Nareli, Ajmer Police Deptt st floor on computer centre (Arya Bhatt Bhawan) at MDSU Ajmer M.D.S.U., Ajmer Women Hostel at MDSU Ajmer M.D.S.U., Ajmer Academic Staff College (Guest House) at MDSU Ajmer M.D.S.U., Ajmer Total Rs. in Lacs.

5 Financial Work Load in Unit Rs. in Lacs. S. No. Name of WorkClient Deptt.A& F SanctionExpenditure till date Balance Work ARE – III Sh. Avinash Kumar 1Part of Academic Building and Workshop at Govt. Mahila Engg. College, Ajmer Principal Women Engg., Ajmer Compound wall at Mahila Engg. College, Ajmer Principal Women Engg., Ajmer Internal Road at Mahila Engg. College, Ajmer Principal Women Engg., Ajmer Canteen Cum Guest House at Engg. College, Ajmer Engg. College Society, Ajmer USQ + LSQ at GRP Campus, Nareli, Ajmer (Part-I, II, III & V) Police Deptt nd floor on Management block at MDSU, Ajmer MDSU, Ajmer

6 S. No.Name of WorkClient Deptt. A& F Sanction Expenditure till date Balance Work ARE – III Sh. Avinash Kumar 7.Social Science Block at M.D.S.U., Ajmer (Development Work) MDSU Ajmer (A) App. Road and Parking Shed at Management Block at MDSU, Ajmer MDSU Ajmer (B)C.C. Interlocking paver block at Bharti niwas at MDSU, Ajmer (C)Laying & Jointing Pipeline UG Tank to Girls Hostel at M.D.S.U., Ajmer (D)Tube Well submersible pump set laying & jointing GI Pipe Environmental Sc. Building at MDSU, Ajmer Dormetory on 1 st Floor at Food Craft Institute at Ajmer M.D.S.U., Ajmer Principal Foof Craft Institute Total

7 Financial Work Load in Unit Rs. in Lacs. S. No. Name of WorkClient Deptt.A& F SanctionExpenditure till date Balance Work ARE – IV Sh. J.P. Kansal 1 Ad.Trainee at PTS Kishangarh.Police Deptt Hostel Building for Trainee at PTS., Kishangarh Police Deptt Adm. Block at RPL Hadirani Battalion, Ajmer Police Deptt Adm. Buidling for Police Outpost at Shastri Nagar, Ajmer Police Deptt Adm. Building for Police out post at Gandhi Nagar, Kishangarh Police Deptt

8 6 Adm. Building for police out post at Saket Nagar, Beawar Police Deptt Adm. Building for Police Police Deptt. out post at Kasai Mohalla, Beawar Adm. Building for Zone officer for CID office, Ajmer Police Deptt Mens Barracks at PTS, Kishangarh Police Deptt. Total

9 Financial Work Load in Unit Rs. in Lacs. S. No. Name of WorkClient Deptt. A& F Sanction Expenditure till date Balance Work ARE – V Sh. Harsh Rai 1100 men barrack at RPLHadirani Battalion (Part-I ) Police Deptt Men Barrack at RPL Hadirani Battalion, Ajmer (Part-II) Police Deptt. Total

10 Bharat Vidhya Adhayan Sankul at M.D.S.U., Ajmer Completion Cost – Rs Crs. Foundation Stone laid by Hon’ble Minister for Higher Education Rajasthan State Sh. Ghanshyam Tiwari in March, 07 Inaugurated by Prof. Sukhdev Thorat Chairman UGC on Important Works Completed during last 5 years

11 Boy’s Hostel at M.D.S.U., Ajmer Completion Cost – Rs Crs. Foundation Stone laid by Hon’ble Minister for Higher Education Rajasthan State Sh. Ghanshyam Tiwari in March, 07

12 Important Works Completed during last 5 years Girls Hostel at M.D.S.U., Ajmer Completion Cost – Rs Crs. Completion Cost – Rs Crs. Inaugurated by Honble Mininster for Higher Education Rajasthan State Govt. Sh. Ghanshyam Tiwari on Foundation Stone laid by Hon’ble Minister for Higher Education & PWD Rajasthan State Sh. Lalit Kishor Chaturvedi on

13 Important Works Completed during last 5 years Social Science Block at M.D.S.U., Ajmer Completion Cost – Rs Crs. Inaugurated by Honble Mininster for Higher Education Rajasthan State Govt. Sh. Ghanshyam Tiwari on Foundation Stone laid by Hon’ble Minister for Mahilla Bal Vikas & JanJati Kashetrya Vikas, Rajasthan State Sh. Kankmal Katara on

14 Important Works Completed during last 5 years Yoga Centre at M.D.S.U., Ajmer Completion Cost – Rs Crs. Inaugurated by Honble Mininster for Higher Education Rajasthan State Govt. Sh. Ghanshyam Tiwari on Foundation Stone laid by Hon’ble Minister for Higher Education & PWD Rajasthan State Sh. Lalit Kishor Chaturvedi on

15 Important Works Completed during last 5 years Women Engineering College at Ajmer Completion Cost – Rs Crs. Foundation Stone laid by Hon’ble Chief Minister Govt. of Rajasthan Smt. Vasundhra Raje on Handed Over in November, 2009

16 Important Works Completed during last 5 years Women Engineering College at Ajmer Completion Cost – Rs Crs. Foundation Stone laid by Hon’ble Chief Minister Govt. of Rajasthan Smt. Vasundhra Raje on Handed Over in November, 2009

17 Important Works Completed during last 5 years Management Block at M.D.S.U., Ajmer Completion Cost – Rs Crs. Inaugurated by Honble Mininster for Industries Rajasthan State Govt. Sh. Rajendra Pareek on

18 Important Works Completed during last 5 years New Answer Book Halls at 1 st Floor & 2 nd Floor in B.S.E.R., Ajmer Completion Cost – Rs Crs. Handed Over in November, 2009

19 Important Works Completed during last 5 years Engineering College, Ajmer Completion Cost – Rs Crs. Inaugurated by Honble Chief Mininster Govt. of Rajasthan Smt.Vasundhra Raje on

20 POLICE HOUSING SCHEME ( ONGOING WORK AT GRP CAMPUS) No. of Quarters: 304 Nos. (L.S.Q U.S.Q.-12) Total Cost: Crores Location: G.R.P. Campus, Nareli, Ajmer Date of Start: February, 2008 / October, 2008 Stipulated Date of Completion: January, 2009 / September, 2009 Expenditure till Date: Crores Likely Completion date: March, 2010 Bottlenecks if any: (i) Sanction for Development works not given. (ii) Water supply connection in campus is to be carried out by PHED. For which Six Months period required. (iii) 60 Nos Qtrs. (L.S.Q.) taken in Phase-II

21 POLICE HOUSING SCHEME ( ONGOING WORK AT GRP CAMPUS)

22 POLICE HOUSING SCHEME (ONGOING WORK AT RAC,NARELI CAMPUS) No. of Quarters:108 Nos. (L.S.Q U.S.Q.-4) Total Cost:5.55 Crores Location:R.A.C. Campus, Nareli, Ajmer Date of Start: February, 2008 / October, 2008 Stipulated Date of Completion:January, 2009 / September, 2009 Expenditure till Date:3.78 Crores Likely Completion date:March, 2010 Bottlenecks if any:(i) 56 L.S.Q. taken in Phase-II work in month of October, 2008 therefore, campus may be ready for handing over by March, 2010.

23 Name of Work:- Various Works in M.D.S. University, Ajmer Construction of First Floor at Computer Centre Total Cost:0.54/0.79 Crore Location:M.D.S. University, Campus Date of Start:September, 2008 Stipulated Date of Completion :April, 2009 Expenditure till Date:0.53 Crore Likely Completion date:March, 2010 Bottlenecks if any:Revised Sanction for additional work received in June, 2009 and delay in payment from client.

24 Name of Work:- Various Works in M.D.S. University, Ajmer Construction of Women Hostel Total Cost:1.81 Crores Location:M.D.S. University, Campus Date of Start:September, 2009 Stipulated Date of Completion :June, 2010 Expenditure till Date:0.08 Crore Likely Completion date:June, 2010 Bottlenecks if any:Work started in October, 2009 due to foundation stone ceremony in September, Foundation Stone Lead by Hon’ble State Minister for Information Technology & Communication Govt. of India Sh. Sachin Piolet on 15 th September, 2009

25 Name of Work:- Various Works in M.D.S. University, Ajmer Construction of Academic Staff College (Guest House) Total Cost:0.75 Crore Location:M.D.S. University, Campus Date of Start:August, 2009 Stipulated Date of Completion :December, 2009 Expenditure till Date:0.11 Crore Likely Completion date:March, 2010 Bottlenecks if any:Funds not released by client timely.

26 Name of Work:- Various Works in M.D.S. University, Ajmer Construction of Environmental Science Building Total Cost: 2.39 Crores Location:M.D.S. University, Campus Date of Start:December, 2009 Stipulated Date of Completion :November, 2010 Expenditure till Date:0.00 Crore Likely Completion date:November, 2010 Bottlenecks if any:- Foundation Stone Lead by Hon’ble State Minister for Information Technology & Communication Govt. of India Sh. Sachin Piolet on 15 th September, 2009

27 Name of Work:- Various Works in Board of Sec. Edu., Rajasthan, Ajmer Construction of Parking, Office, Chamber & Auditorium Total Cost:14.00 Crores Location:B.S.E.R. Campus Date of Start:September, 2008 Stipulated Date of Completion :August, 2011 Expenditure till Date:2.89 Crores Likely Completion date:August, 2011 Bottlenecks if any:Work stopped on account of decision not given by client for Construction of Auditorium hence, Construction of 2 rd Floor held up for Two Months.

28 Name of Work:- Various Works in Board of Sec. Edu., Rajasthan, Ajmer Construction of 1 st & 2 nd Floor on Old Answer Book Hall Total Cost:1.06 Crores Location:B.S.E.R. Campus Date of Start:September, 2008 Stipulated Date of Completion :February, 2010 Expenditure till Date:0.49 Crore Likely Completion date:March, 2010 Bottlenecks if any:(i) Funds not released by client timely. (ii)Work stopped by client on account of thorough passes for access of examination stationary through trucks.

29 Name of Work:- Various Works under Police Modernization Construction of Adm. Training Block at PTS Kishangarh Total Cost:1.5 Crores Location:Kishangarh Date of Start:September, 2008 Stipulated Date of Completion :May, 2009 Expenditure till Date:1.30 Crores Likely Completion date:January, 2010 Bottlenecks if any:Part sanction of Rs. 0.5 crores received in phase-II.

30 Name of Work:- Various Works under Police Modernization Construction of Hostel Building of Trainee at PTS Kishangarh Total Cost:1.00 Crore Location:Kishangarh Date of Start:September, 2008 Stipulated Date of Completion :May, 2009 Expenditure till Date:0.55 Crore Likely Completion date:January, 2010 Bottlenecks if any:Part sanction of Rs. 0.2 crores received in phase-II.

31 Name of Work:- Various Works under Police Modernization Construction of Adm. Building for RPL, Hadi Rani Battalion, Ajmer Total Cost:1.25 Crores Location:Nareli, Ajmer Date of Start:January, 2009 Stipulated Date of Completion :December, 2009 Expenditure till Date:0.31 Crore Likely Completion date:January, 2010 Bottlenecks if any:Work Started in July, 2009 due to non availability of land.

32 Name of Work:- Various Works under Police Modernization Construction of 100 mens barracks at RPL, Hadi Rani Battalion, Ajmer (Part-I) Total Cost:1.00 Crore Location:Nareli, Ajmer Date of Start:January, 2009 Stipulated Date of Completion :December, 2009 Expenditure till Date:0.03 Crore Likely Completion date:January, 2010 Bottlenecks if any:Work Started in July, 2009 due to non availability of land.

33 Name of Work:- Various Works under Police Modernization Construction of 100 mens barracks at RPL, Hadi Rani Battalion, Ajmer (Part-II) Total Cost:1.00 Crore Location:Nareli, Ajmer Date of Start:January, 2009 Stipulated Date of Completion :December, 2009 Expenditure till Date:0.006 Crore Likely Completion date:January, 2010 Bottlenecks if any:Work Started in July, 2009 due to non availability of land.

34 Name of Work:- Various other works in Unit-I, Ajmer Construction of Canteen cum Guest House at Engineering College, Ajmer Total Cost:0.42 Crore Location:Ajmer Date of Start:December, 2007 Stipulated Date of Completion :July, 2008 Expenditure till Date:0.26 Crore Likely Completion date:March, 2010 Bottlenecks if any:-

35 Name of Work:- Various other works in Unit-I, Ajmer Construction of Urban Hatt at Ajmer Total Cost:1.60 / 1.90 Crores Location:Ajmer Date of Start:June, 2007 Stipulated Date of Completion :May, 2008 Expenditure till Date:1.14 Crores Likely Completion date:March, 2010 Bottlenecks if any:Work Stopped since October, 2008 due to funds not released by client

36 Proposed New Works S. No.Name of WorkClient Deptt.ModeEstimated Cost Actual plus / Tendered 1.Const. of Women Engineering college (Ph.-II) Principle Mahilla Engineering College, Ajmer Actual Plus Lacs. 2.Additional Works in ITI Building and Campus at Beawar. Institute Management Committee of ITI, Beawar Actual Plus60.00 Lacs.