David Crook P.Eng. Manager, Engineering and Environmental Services Westshore Terminals LP Westshore Terminals Presentation to EMA 20 Feb 2014.

Similar presentations


Presentation on theme: "David Crook P.Eng. Manager, Engineering and Environmental Services Westshore Terminals LP Westshore Terminals Presentation to EMA 20 Feb 2014."— Presentation transcript:

1 David Crook P.Eng. Manager, Engineering and Environmental Services Westshore Terminals LP Westshore Terminals Presentation to EMA 20 Feb 2014

2 ● Opened 1970 as single pad ● Doubled size in ● New single dumper 1992

3 Westshore export coal types 60% steelmaking coal 40% energy coal

4 South Korea No. 1 Shipments by destination

5 Over 700 million tonnes shipped in our 43 years December 6 th, 2012

6 Compensation Habit Created by PortMetroVan

7 December 7th, 2012

8

9

10 Land-side stabilization and clean-up

11

12

13 Controlled blasting was used to separate the road deck from pile caps

14

15 Preparations to receive coal via suction dredge

16 Berth 1 trestle Reconstruction

17 Trestle reconstructed in two months Trestle reconstructed in two months

18 Business as usual

19 Railcars sprayed with binder at mine load-out

20 Rail-Car Unloading By Rotary Dumper

21 Water sprays in the Dumper Pit Railcar washing after unloading

22 Rail mounted Stacker-Reclaimers Stockpiling and Reclaiming

23 Dust suppression □ 94 ground level rain guns □ 10 high mast sprays □ 17 tower sprays (Big Berthas) □ fleet of 3 water trucks Big Bertha

24 Enhanced site coverage

25 94 low level rain-gun sprays

26 Dust suppression Other methods  Water Trucks spray and wash  Coal roads compacted and MgCl

27 Putting it all together

28 Off-site Mobile Air Monitoring Unit

29 Emissions Reduction - vehicle replacement to upgrade engine Tier status (MetroVan Off-road Diesel Emissions Reduction Program) - anti-idling program - more efficient operations (reduction in bulldozing)

30 Energy savings with PowerSmart Energy Saving - 60w v. 400w Long Life - up to12 years Daylight comparable white light Directional - limits spilled light No on/off strike delay  Switching to VFD Motor Control  Switching to LED Lighting

31 Existing Development

32 Future development

33 Westshore Terminals


Download ppt "David Crook P.Eng. Manager, Engineering and Environmental Services Westshore Terminals LP Westshore Terminals Presentation to EMA 20 Feb 2014."

Similar presentations


Ads by Google