Presentation is loading. Please wait.

Presentation is loading. Please wait.

“I would say that if the village perishes, India will perishes too” … Mahatma Gandhi ji Appraisal of infrastructure facilities of a backward taluka on.

Similar presentations


Presentation on theme: "“I would say that if the village perishes, India will perishes too” … Mahatma Gandhi ji Appraisal of infrastructure facilities of a backward taluka on."— Presentation transcript:

1 “I would say that if the village perishes, India will perishes too” … Mahatma Gandhi ji
Appraisal of infrastructure facilities of a backward taluka on gis platform - case study of nizar taluka of tapi district, gujarat, india  Presented By B.K.Patel (Director) Design Point Consult Pvt. Ltd., Surat, Gujarat, India A Concept developed under the guidance of Shri. S. Jagadeesan (I.A.S.)- M.D. Narmada Nigam, Govt. Of Gujarat, India October, 2011

2 STRUCTURE OF THE PRESENTATION
NIZAR TALUKA OVERVIEW CREATION OF GIS BASE DATA BASE INFRASTRUCTURE GAP ANALYSIS PROPOSALS VILLAGE DEVELOPMENT PLAN

3 TAPI DISTRICT : An Overview
Taluka Population Population (in %) BPL Family BPL Family (in %) Literacy (in %) S.T. Population S.T. Population (in %) NIZAR 105385 15.93 20297 29.33 45013 13.25 83843 14.15 UCHHAL 36827 5.57 10095 14.59 27402 8.06 71084 12.00 SONGADH 181839 27.48 12528 18.10 82047 24.15 164392 27.75 VYARA 249810 37.75 19025 27.49 136884 40.28 208916 35.27 VALOD 87878 13.28 7261 10.49 48453 14.26 64120 10.82 TAPI DISTRICT 661739 100.00 69206 339799 592355 Source : Tapi Socio-Economic Review,

4 Existing Situation Analysis : GIS Software
Nizar Creation of Village Level Data Base

5 Existing Situation Analysis : GIS Software
Fulwadi Creation of Village Level Data Base (Facility wise)

6 Existing Situation Analysis
BPL Population Literacy Rate

7 Primary Data Collection
Department wise Infrastructure Gap Analysis Road and Building Department Water Supply Department Electricity Department Irrigation Department Education Department Health Department Agriculture Department Animal Husbandry Department Questionnaire designed and Infrastructure requirements collected for NizarTaluka collected from respective department

8 Primary Survey Primary Survey - Infrastructure Gap Analysis
- Existing Socio-Economic Status - Opinion Survey (Villagers) - Stakeholders Consultation

9 Education Department Nizar Taluka – Total Anganwadi 152 Nos.
Without Drinking Water Facility - 67 (44%) Without Toilet Facility – 91 (60%) Without Kitchen Facility – 30 (20%) Without Electricity – 42 (28%) Without own building – 14 (9%) In Nizar, out of 86 Primary School, 22 nos Toilets facilities not available. Kukurmunda, Nizar, Moramba have immediate requirements of additional class rooms because of increase number of students

10 Roads & Buildings Department
Nizar Taluka Sr. No. Name of Vilages Name of road Length of road in km Existing Road surface 1 Khanora Sayla Khanora Road 1.20 Poor Metal 2 Nevala State Highway to Nevala Road 2.20 3 Juna Utavad State Highway to Juna Hathoda Road 6.40 Total No of Govt. Buildings under R & B Department, Nizar – 56 nos. Very Poor Condition – 2 Poor Condition – 11 Maintenance Required - 18

11 Agriculture Department
About 48% geographical land area under cultivation About 39% of the cultivable land are irrigated About 61% of the cultivable land is rain fed Soil is poor in organic carbon (0.5) Seed Farm may be opened Farmer’s training need to be a frequent phenomena Pasture land may be developed to promote animal husbandry Organic manures may be manufactured by using gobar/organic waste to increase the soil carbon content Infrastructure condition of APMC Market, Nizar need to be improved. Surat APMC model can be adopted.

12 APMC Market and Role of APMC
Existing APMC Market need to upgrade and exploring the possibilities for trading of vegetables, fruits and even commencing Chilling Centre Advice for Production Planning Marketing Information Advice on Improved Marketing Practices Group Action Transportation, grading and packing units etc. in PPP mode

13 Irrigation Department
About 39% of the cultivable land are irrigated In Songadh taluka only 20% land under irrigation Lift Irrigation to be promoted : Lift Irrigation Project at Village Maoulipada of Nizar Taluka : Lift Irrigation Project at Village Lakshmikheda of Nizar Taluka (sanction amount Rs. 12 Lakhs)

14 Dairy Production – (YEAR 2207-08)
Dairy production - major economic activities in Nizar Taluka Sr.No. Taluka Name Nos. Milk Sahkari Mandali Nos. of members Quantity of storage milk during year in Liter 1 Valod 43 9023 2 Vyara 140 27709 3 Songadh 169 30157 4 Uchchhal 61 12601 5 Nizar 87 18157 Tapi District 500 97647

15 Existing Milk Production Co-operative Societies - Nizar

16 Backwardness Index – Nizar Taluka
Weightage No of Villages Ranking % Backwardness Name of the Villages >120 9 1 17.65 Extreme Umja, Chokiamli, Boarikuva, Kevadamoi, Chiramatti, Metawal, Methpur, Zumkadi, Sahatole 20 2 39.22 Moderate <100 22 3 43.14 Low Total 51  100 In Spatial Planning thrust will be given to the extreme backward villages within the Nizar Taluka

17 Backwardness Index

18 Nodal Villages of Nizar Taluka - Overview
Shale, Nizar, Fulwadi, Moramba, Balde identified as Nodal Village and Nizar as a taluka headquarter treated in a separate way Consisting 30.55% of the total Taluka’s Population Each Nodal Village’s having catchment area of sqkm and population of Population of Shale (10,425), Fulwadi (10,239) and Nizar (6871) already established Nodal Village in the taluka Each Nodal village will served other villages with average catchment area of 10 km and the Highway connectivity already established

19 Nodal Villages – Along Major Highways
Nizar Taluka UCHCHHAL Taluka Nizar Taluka Population : 1.05 Lakhs Future Agro based Industries can also take advantage of its location along major Highways

20 PROPOSALS AND SCHEMES

21 Centrally Sponsored Schemes : Rural
National Rural Employment Guarantee Programme (NREGP) Pradhan Mantri Gram Sadak Yojana (PMGSY) Indira Awas Yojana (IAY) National Social Assistance Programme (NSAP) National Rural Health Mission (NRHM) Integrated Child Development Services (ICDS) Accelerated Rural Water Supply Programme (ARWSP) Mid-Day Meals Programme (MDP) Sarva Shiksha Abhiyan (SSA) Accelerated Irrigation Benefits Programme (AIBP) Rajiv Gandhi Grameen Vidhyautikaran Yojana (RGGVY)

22 Financial Resource Available : Nizar Taluka (2009-10)
Name of Scheme Total Rs. In Lacs Central Sector Scheme 649.80 Central Sponsored Scheme 9.45 State Government Scheme 110.18 Finance Commissioner Grant 56.79 M.P./M.L.A. Fund 24.74 Local Revenue 0.00 Other Funds 850.96

23 CM’s TEN POINT PROGRAMME (VANBANDHU KALYAN YOJONA)
EMPLOYMENT OPPORTUNITY QUALITY OF EDUCATION ECONOMIC DEVELOPMENT HEALTH HOUSING SAFE DRINKING WATER IRRIGATION ALL WEATHER ROAD CONNECTIVITY UNIVERSAL ELECTRIFICATION URBAN DEVELOPMENT

24 BASIC PARAMETERS FOR TALUKA DEVELOPMENT
INFRASTRUCTURE (PHYSICAL, SOCIAL & ECONOMIC) IMPROVED EXISTING INFRASTRUCTURE NEW INFRASTRUCTURE IMPROVED AGRICULTURAL PRACTICES REDUCTION OF WASTELAND CROPPING PATTERN & INTENSITY FLORICULTURE IRRIGATION REDUCTION OF NON IRRIGATED AREA LIFT IRRIGATION IMPROVED AGRICULTURAL PRACTICES TO IMPROVE PER CAPITA INCOME OF THE VILLAGERS

25 INTEGRATED DEVELOPMENT OF WASTELAND
Name of the Taluka Geographical Area (ha.) Un utilized land /Pasture Area to be covered for watershed development (ha.) Songadh 135404 6770 Nizar 40079 2004 Uchchhal 66500 3325 Vyara 81260 4063 Valod 20228 1011 Total 343471 17174 Focus will be on prevention of salinity ingress, reclamation of soil, development of waste land, afforestation, construction of check dams/ Khet Talawdies and other water harvesting structures

26 VILLAGE WISE WASTELAND AREA

27 MAJOR FOOD CROPS AND CASH CROPS
PADDY (MAJOR) PULSES (MAJOR) OILSEEDS WHEAT CASH CROPS SUGARCANE (MAJOR) SUNFLOWER (MAJOR) SOYABEAN COTTON INTERVENTION NEEDED : WASTELAND DEVELOPMENT SUBSIDY TO HYV SEEDS FARMERS AWARENESS & TRAINING ORGANIC FARMING

28 VILLAGE WISE NON IRRIGATED AREA

29 PROPOSED LIFT INNRGATION SCHEME IN NIZAR TALUKA

30 HORTICULTURE – CULTIVATION OF FRUIT CROPS IN WASTELAND
Sr. No. Fruit Production per Ha Nizar (wasteland area HA) 1 Mango 20000 2 Sapota 3 Banana 108010 4 Lime 11080 5 Aonla 15600 6 Papaya 96000 7 Ber 34625 8 Guava 13850

31 INFRASTRUCTURE GAP ANALYSIS & COSTING

32 INFRASTRUCTURE GAP ANALYSIS - NIZAR
Facilities Existing Required as per Norms Gap Education Anganwadi 49 51 2 Primary School 50 1 Secondary School 9 16 7 Higher Secondary School 8 6 College Tech. Training Institute Agriculture Research Centre Medical Facility Govt/Panchyat Dispensary or Sub PHC or Health Centre 36 15 PHC & CHC 5 Child Welfare and Maternity Home 12 Hospital 4 Nil Transportation Pucca Village Approach Road Bus/Auto Stand provision 30 21 Drinking Water Public Latrines 11 40 Cremation Ground Post Office 25 Gram Panchayat Building 37 APMC Fire Station Police Station Community Hall 28

33 FUND REQUIREMENT FOR NEW INFRASTRUCTURE - NIZAR
Facilities Gap Amount Rs. Education Anganwadi 2 Primary School 1 Secondary School 7 Higher Secondary School 6 College Tech. Training Institute Agriculture Research Centre Medical Facility Govt/Panchyat Dispensary or Sub PHC or Health Centre 15 PHC & CHC Child Welfare and Maternity Home Hospital Nil Transportation Pucca Village Approach Road Bus/Auto Stand provision 21 Drinking Water Public Latrines 40 Cremation Ground Post Office Gram Panchayat Building 16 APMC Fire Station Police Station Community Hall TOTAL AMOUNT RS. ADD 5 % CONTI. CHARGES RS. GRAND TOTAL RS. GRAND TOTAL RS. IN CRS 34.377

34 VILLAGE LEVEL INFRASTRUCTURE ANALYSIS - NIZAR
TOTAL ROAD LENGTH : KM

35 VILLAGE LEVEL INFRASTRUCTURE ANALYSIS - NIZAR
ESTIMATED COST OF INFRASTRUCTURE DEVELOPMENT FOR NIZAR Sr.No. Component Length in Km. Cost per K.M. Total Amount Rs. 1 Gas pipe line 20.00 2 C.C. road 15.00 3 Water supply scheme 4 Under ground drainage TOTAL AMOUNT RS. TOTAL AMOUNT RS. IN CRS 12.86

36 DETAIL TO PROVIDE 100 % IRRIGATION FACILITY IN NIZAR TALUKA
IRRIGATION- NIZAR DETAIL TO PROVIDE 100 % IRRIGATION FACILITY IN NIZAR TALUKA (Based on the study of Abhyuththan Gram Vikas Mandal, Songadh) Sr.No. Detail of the scheme Nos. of scheme Nos. of village Command area in Acre Nos. of benifitiaries Estimated cost in Rs. Lac. 1 Lift irrigation scheme based on Ukai reservoir 14 22063 9926 13526 2 Lift irrigation scheme based on the check dam on river, creeck, kotar 9 665 407 524 3 Lift irrigation scheme based on well 39 15 365 292 351 TOTAL 62 38 23093 10625 14401

37 Village Development Plan

38 Public Infrastructure & Services Required for Model Village
Sl. No. Infrastructure 1 Pucca Village Approach Road 2 Public Transport 3 Electricity 4 Water Supply 5 Sanitation 6 Drainage system 7 Anganwadi 8 Primary school 9 Govt./Panchayat Dispensary 10 Vetendry Doctor Visit 11 Trained Midwife 12 Ration shop 13 Milk Production Coperative Society 14 Fertilizer/Seed Shop 15 Lift Irrigation Scheme 16 Self Help Group Basic Infrastructure Social & Health Related Economic Related

39 Need and Characteristics
User Friendly Less time Consuming Remove Overlapping/duplications Existing Situation Analysis Provides guidelines for Taluka Development Both Financial Requirements and Implementation Monitoring Modules for individual Villages and Taluka as a whole A professional tool for Decision Makers

40 Modules : Taluka Development Plan
Sample Module Education – Primary Education – Anganbari - Only No. of Students need to be filled up Nodal Villages already identified in the software with geographically distributed and acted as Growth Centre with specified catchment area and population

41 Modules : Taluka Development Plan
Management Information System (MIS)Outputs Implementation Monitoring (Half Yearly) - Physical Achievements - Financial Achievements - Highlights sectors/areas not achieved desired level MIS automatically generate automatically for the decision makers

42 Thank you…


Download ppt "“I would say that if the village perishes, India will perishes too” … Mahatma Gandhi ji Appraisal of infrastructure facilities of a backward taluka on."

Similar presentations


Ads by Google