L.K. Korovin General Director, SPbPO Ecology and Business Chairman, HELCOM LAND 1.

Similar presentations


Presentation on theme: "L.K. Korovin General Director, SPbPO Ecology and Business Chairman, HELCOM LAND 1."— Presentation transcript:

1 L.K. Korovin General Director, SPbPO Ecology and Business Chairman, HELCOM LAND 1

2 YearsP-PO4 t/aР tot. t/a  100  , ,62392,

3 3 Date Flow m 3 /s P-PO4, mg/l P tot. (filtered sample) mg/l P tot. (Unfiltered sample) mg/l ,10,0070,0200, ,51,5203,0863, ,90,0200,0360, ,8691,0501, ,0310,0450, ,20,0060,0080, ,40,0060,0170, ,8472,0392, ,0050,0110, ,1661,2001, ,0150,0230, ,0100,0260,044

4 DateSampling location LaboratoryР tot. mg/lР –РО4 mg/l KingiseppSPB UGMS0,041- KingiseppSYKE0,0370, KingiseppSPB UGMS0,074- KingiseppSYKE0,0720,016 KingiseppMetropoliLab.0,0720,015 Ust-LugaSPB UGMS0,291- Ust-LugaSYKE0,3770,272 Ust-LugaMetropoliLab.0,3600, KingiseppSPB UGMS0,056- KingiseppSYKE0,056- Ust-LugaСSPB UGMS0,263- Ust-LugaSYKE0,330- 4

5 Sampling locationР tot., mg/lР-РО4, mg/l Gorsky Brook (dissipating discharge of treated Phosphorit wastewater) 9,78,7 Verhovskoy Brook (outside Phosphorit industrial area) 123,0110,0 5

6 Sampling location LaboratoryР-РО4, mg/lР tot., mg/l Gorny Brook (WWTP outlet) TSLATI (Rosprirodnadzor) 2,73,1 EuroChem laboratory2,82,9 Verhovskoy BrookTSLATI (Rosprirodnadzor) 8,89,2 EuroChem laboratory8,59,3 6

7 * Kaj Forsius, (BALTHAZAR, HELCOM), * Seppo Knuuttila, SYKE, * Karl-Johan Lehtinen, NEFCO, * Risto Valo, senior consultant, Poyry,Finland, * Kristiina Isokallio, Director, Ministry of Environment, Finland, * Anatoly Grabovsky – Head of Department, Roshydromet in NW Russia * Vasily Fedorov – Rosprirodnadzor in NW Russia * Sergey Ermolov – Chairman, State Control Committee, Natural Resources Use and Environmental Safety of the Leningrad Oblast – * Leonid Korovin – General Director, SPbPO Ecology and Business, * Larisa Makarova – Deputy General Director, International Cooperation, SPbPO Ecology and Business * Igor Schelkunov – Administrative Director, OAO MHK EuroChem * Alexander Tugolukov – Technical Director, OAO MHK EuroChem * Ilya Kuftin – OAO MHK EuroChem * Vladimir Torin – OAO MHK EuroChem * Vladimir Erlykov – Executive Director, OOO PG Phosphorit * Sergey Sheibak – Technical Director, OOO PG Phosphorit * Piotr Kravtsov – Administrative Director, OOO PG Phosphorit 7

8 8 1. Daily control of phosphorus concentrations in the Verhovskoy Brook by Phosphorit Testing laboratory 2. Agreement between Phosphorit and NW Hydromet Department concerning financing of hydrological and hydrochemical observations of the water bodies in the Luga River area 3. Construction of pumping facility in the area of phosphogypsum storage in order to pump ground water at the rate of 200 cubic meters per hour and pass it to wastewater neutralization station for phosphorus removal and then to WWTP 4. Reconstruction of WWTP

9  Protection screen is eventually repaired and tight bunding is made at phosphogypsum storage site  200 cubic meters per hour ground water pumping facility installed and put into operation at phosphogypsum storage site and water is pumped to wastewater neutralization station for phosphorus removal and further treatment at WWTP  An agreement is signed between Phosphorit and NW Roshydromet Department concerning financing of hydrological and hydrochemical observations of water bodies in the Luga River catchment area  Samples from Verhovskoy Brook are taken and analyzed daily to monitor phosphorus content in the Verhovskoy Brook water. 9

10  Samples taken twice a month (COD, Р tot., Р-РО4, N tot.) – 11 months (154 samples)  3 sampling locations (2 samples: left bank and middle of the Luga River): 50 m upstream of the Gorsky mouth (dissipating discharge of Phosphorit wastewater) 500 m downstream of wastewater outlet 50 m downstream of the Luga and Verhoskoy intersection  Ust-Luga (1 sampling site) 10

11 11 Sampling sites № 1а; 1б0.05 km upstream of Gorsky mouth (left bank of the Luga river and its middle) № 2а; 2б0.5 downstream of the Gorsky and Luga intersection (left bank of the Luga river and its middle) № 4а; 4б0.5 km downstream of the Verhovskoy and Luga intersection (left bank of the Luga river and its middle) № 5Luga mouth

12 12 DateР-РО4 mg/l DateР-РО4 Mg/l DateР-РО4 mg/l , , , , , , , , , , , , , , , , , , , , , , ,8

13 13 Thank you very much! Welcome to the Russia!