Presentation is loading. Please wait.

Presentation is loading. Please wait.

Weatherization Works! NETL Project Management Center Contracting Staff Listing for WAP Denise Riggi(304) Lead/Contracting.

Similar presentations


Presentation on theme: "Weatherization Works! NETL Project Management Center Contracting Staff Listing for WAP Denise Riggi(304) Lead/Contracting."— Presentation transcript:

1 Weatherization Works! NETL Project Management Center Contracting Staff Listing for WAP Denise Riggi(304) Lead/Contracting Officer John Golovach(412) ME, MA, NH, NY, RI, VT Janet Spaulding(412) DC, KY, MD, NJ, PA, VA, WV Daniel Stevens(412) AR, FL, GA, MI, NC, SC, TN Lisa Kuzniar(304) IN, IA, MI, MN, MO, OH, WI Theresa Hafer(304) KS, LA, MT, NE, NM, ND, OK, SD, TX, UT, WY Kelly McDonald(304) AZ, CA, HI, ID, ITCA, Navajo Nation, NV, OR, WA

2 Weatherization Works! Golden Field Office Project Management Center Project Officer Staff Listing for WAP Golden Staff NamePhone # AddressAssignment Gary Burch(303) Director Jeff James(303) Lead Michael Peterson(303) IN, IA, MI, MN, MO, OH, WI Rob DeSoto(303) KS, LA, MT, NE, NM, ND, OK, SD, TX, UT, WY Carole Gates(303) AZ, CA, HI, ID, ITCA, Navajo Nation, NV, OR, WA

3 Weatherization Works! NETL Project Management Center Project Officer Staff Listing for WAP NETL Staff NamePhone # AddressAssignment Angela Young(412) Director Greg Davoren(412) Lead Greg Davoren (Acting)(412) ME, MA, NH, NY, RI, VT Eric Bell(412) AR, FL, GA, MI, NC, SC, TN Magda Rivera(304) DC, KY, MD, NJ, PA, VA, WV

4 Weatherization Works! Major Issues from Pre- and Post- Consolidation Meetings Hold Post-consolidation meeting Clarify and communicate role of States Coordinator PMC should serve as advocate Possible WAP Transfer from EERE to HHS Annual Operating Plan (AOP) Funds for T&TA Importance of Technical Assistance and Monitoring Procedures used to process grant actions

5 Weatherization Works! Major Issues from Pre- and Post-Consolidation Meetings Cost Issues: –Average Cost Per Unit, Consumer Price Index (CPI) Training and Technical Assistance: –Training Center Issues Tribal Issues: –Isolation; Need to Leverage Resources; Need to Provide Greater Impact; Re-evaluate Allocation; Average Cost Per Unit Issues Monitoring Policy: –State Priorities; Peer Monitoring Between States Market Transformation with Advanced Technologies: –Training on Affordable Housing/Mobile Homes; Best Practices on Low-End Homes; Green Buildings WAP and Renewable Energy: –WAP Serves as Testing Ground for New Technologies; Collaborating with Building Codes staff; Relationship with Green Buildings

6 Weatherization Works! Major Issues from Pre- and Post-Consolidation Meetings PMC Staff Travel Restrictions (Need for Face-to-Face Interactions) Face-to-Face Meetings at WAP Nat’l/Reg’l and PMC Meetings Possible Meetings on topics/themes and new regional groupings Use of webcasts, teleconferences, videoconferences, newsletters, etc. Annual plan and schedule for all WAP-related meetings in U.S. Help to communicate success stories to decision makers

7 Weatherization Works! Major issues from State Managers’ Meeting Complete 2007 Program Guidance Provide responses to questions raised in Grants.gov session Revise definition of leveraging in Guidance Is Pollution Occurrence Insurance needed Discussion on failure rate of Energy Star refrigerators and CFLs Revisit renewables section of Guidance

8 Weatherization Works! Other Points of Discussion AOP Regional Meetings/Conferences State Grouping (regional, sub-regional, climatic) Training and information on WinSAGA, Grant.gov, and STRIPES External procedures Regular Communications

9 Weatherization Works! Hot Humid Mixed Humid Cold I Cold II Cold III Hot Dry Marine

10 Weatherization Works! Western RO Offices Consolidate to Golden Eastern RO Offices Consolidate to NETL Golden NETL * For WAP and SEP, NETL is Project Office for Eastern States, and Golden is Project Office for Western States

11 Weatherization Works! For More Information, Please Visit… EERE Project Management Center (PMC): DOE Office of Energy Efficiency and Renewable Energy: PMC Stakeholder Update (Newsletter): WAP Technical Assistance Center:


Download ppt "Weatherization Works! NETL Project Management Center Contracting Staff Listing for WAP Denise Riggi(304) Lead/Contracting."

Similar presentations


Ads by Google