ISE 6 Phase 2 Demo Scenario Nov 20, 2008. 2 Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat.

Similar presentations


Presentation on theme: "ISE 6 Phase 2 Demo Scenario Nov 20, 2008. 2 Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat."— Presentation transcript:

1 ISE 6 Phase 2 Demo Scenario Nov 20, 2008

2 2 Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat Systems) –IWS 2 (Above Water Sensors) –PEO Ships Policy Makers –NAVSEA 04L –OPNAV N40 Shipyards (Acquisition and Planning Yard)

3 Invitation List Jim Colson (Army LOGSA) 04L - Bernie Coval, Tim Kriegal, Bucky Buchanan ISW1 – Jolene Marshall, CAPT Mall ISW2 – Noel Smith, PMS 500 – Cheryl Smorto, –Claude Barrens (CGX ship design manager) NAVSSES – Joe Picossi PHD – Troy Sutton, Fabio Vitale, CAPT Ruehlin PEO Ships PEO Subs PEO Carriers 3

4 Demo Date Phillys in DC April 13-16 Easter is April 12 4

5 5 Process Improvements Exchange of integrated design and logistics product data –Between Design and Logistics –Between ISEA, NAVSEA 05, Shipyards, and OEMs –Throughout full life cycle (currently only in acquisition) Standardized data exchange formats –Neutral format IDE data –Improved quality and reduced cost through standardized schema and automated validation/exchange –Enable data reuse Automated identification of change impacts –Reduce costs to evaluate changes –Support cost benefit analysis, design trade studies, etc. –Impact of design or logistics changes Enables Virtual Navy Enterprise

6 As-is Scenario OEM (RSC) ISEA (PHD) Shipyard / NAVSSES Collaboration Develop ECR Changes Revised Radar Mod 2 Radar Program Office Authorization, Funding NDE-FMP Revised Radar Data Revised HM&E Data Identify Changes Navy S1000D Database (Content@) CDMD OA TDMIS LEAPS NAVICP WSF Authorization, Funding Program IDE LSA R Update Design and Logistics Update Design and Logistics

7 Demo Scenario OEM (RSC) ISEA (PHD) Shipyard / NAVSSES Collaboration Develop ECR Revised Radar Program Office(s) Authorization, Funding NDE-FMP Revised Radar Data Revised HM&E Data Update Design and Logistics Navy S1000D Database (Content@) CDMD OA TDMIS LEAPS NAVICP WSF AP 239 + S1000D Authorization, Funding AP 239 + S1000D AP 239 + S1000D Program IDE LSA R PLCS Identify Changes Update Design and Logistics Changes AP 239 + S1000D AP 239 + S1000D

8 Demo Scenario by System OEM (SIR) ISEA (episTree) Shipyard / NAVSSES Collaboration Develop ECR Revised Radar Program Office(s) Authorization, Funding NDE-FMP Revised Radar Data Revised HM&E Data Update Design and Logistics Navy S1000D Database (Content@) CDMD OA TDMIS LEAPS NAVICP WSF AP 239 + S1000D Authorization, Funding AP 239 + S1000D AP 239 + S1000D Program IDE (Teamcenter) LSA R PLCS Identify Changes Update Design and Logistics Changes AP 239 + S1000D AP 239 + S1000D S1000D modules Need to add S1000D repository From OEM and Shipyard

9 In-service Ship Alt PEO authorization SHIPMAIN coordinates development of Alt –ISEA develops Alt for radar system ISEA submits ECR to OEM Update design (drawings) Update logistics (ILS) –Planning yard / NAVSSES develop Alt for HM&E Update design (drawings) Update logistics (ILS)

10 10 Current Issues Investigate LOGSA LSAR DEX – Tim, Ted, Mike

11 Clarifciations Separate Ship Constructor demo –Maybe ShipTech –Different audiuence – 2 nd tier yards 11

12 Demo Data Content@ DB –John Crehan to work with Bernie –End of Jan – link from RSC is operational to deliver modules Fall back plan – manually add to Content@ Dual Band Radar –Receiver Exciter (REX) Spy 3 30 data modules Functional description, Removal, Procedure, graphics –John Crehan provide metadata by Dec 5 –Matt P. – acquire LCB data, including HSC numbers 12

13 Demo Data HM&E system –Use AC system (514) –Use AC Plant #1 (51421) –Change the motor (514212122) and compressor (514212121) –Mike talk to Harold Roll about S1000 DM for AC plant –Ben – find additional VFI tech data for motor and compressor Tim – find out who has S1000D data for LPD 17 motors –Populate data sheet –CAD model for equipment Could export from CATIA Need GUIDS for LEAPS Mike – Provide STEP files for distributed systems 13

14 Previous Demo Planning Slides 14

15 15 ISE 6 Phase 2 Demo Scenario Initial Data Exchange and Load –Export selected HVAC system from LPD IDE as PLCS data with links to S1000D data modules –Export selected Dual Band Radar (DBR) system from NSWC PHD/Raytheon (System TBD) as PLCS data with links to S1000D data modules –PLCS data modified to allow import into DDG 1000 IDE –PLCS data imported into DDG 1000 IDE –S1000D data and publication modules for HVAC and DBR delivered to Navy Common Source Data Base (CSDB) Change Management –New Mod of Dual Band Radar is developed and authorized for use –New radar cabinets generate more heat, require additional cooling in the space –New cooling requirements passed to Shipyard Engineering –HVAC system is redesigned –Affected S1000D data modules for HVAC and DBR system Technical Manuals are updated –HVAC and DBR system Technical Manuals updated –Updated design passed to LEAPS

16 16 PLCS & S1000D: Functional Scenario Shipyard B Design (3D CAD Data) Shipyard B IDE (Update Tech Pub) Navy IDE (Design & Analysis) Shipyard A IDE (Design, Logistics, Support) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change)

17 17 Shipyard B IDE Teamcenter DDG 1000 IDE Software CAD Tool Design Shipyard LEAPS Navy Design & Analysis Repository Navy IDE AIM/SIR LPD 17 IPDE Software Shipyard A IDE episTree Knowledge Management Software 3D Design New Support Requirements AP 239 + S1000D AP 214 HVAC AP 239 + S1000D Ship Alt Changes PLCS & S1000D: Exchange Scenario AP 239 + S1000D Common Source DB NAVSEA / NSWCCD NAVSEA / Navy ISEA TBD System S1000D Modules S1000D Modules Content@ Candidate Data Module Updates

18 18 Updated Requirements PLCS & S1000D: Data Scenario DM 1.1 DM 1.2 DM 1.3 Chillers Duct 1 Chiller 2 Duct 2 HVAC Sys Drawing2 DM 2.3 DM 2.2 HVAC Sys TM 1 HVAC Sys TM 2 ISEA IDE (Radar) DM 1.1 DM 1.2 Mod 1 Radar TM Mod 1 DM 1.3 Mod 2 DM 2.1 Mod 2 Radar TM DM 2.2 Chiller 1 HVAC Sys HVAC Ducts HVAC Sys Drawing1 Shipyard Design & IDE

19 19 Demo Data HVAC and DBR system PLCS data –Similar to last year’s demo –Equipment – chiller? –AP 227 implications HVAC and DBR system Tech Manual / Data Modules –Need to define minimal TM content, divide into DM –Define DMC structure –Define necessary metadata

20 20 Backup

21 21 AIM/SIR LPD 17 IPDE Software Teamcenter DDG 1000 IDE Software episTree Knowledge Management Software LEAPS Navy Design & Analysis Repository CATIA (V4 AEC) ShipConstructor 2006 ShipConstructor 2008 AP 227 AP 239 AP 214 Design Navy IDE Shipyard A-IDE Shipyard B-IDE 3D Design Design & Logistics AP 214 AP 239 Design & Logistics, including 3D Design AP 239 AP239/PLCS (ISE-6 Phase 1) Demo Scenario

22 22 PLCS & S1000D: Functional Scenario Shipyard A Design (3D CAD Data) Shipyard A IDE (Update Tech Pub) Navy IDE (Design & Analysis) Navy Depot (Design, Logistics, Support) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change)