Permit to Work System Permit Orientation Training PTWS – Permit Orientation Training.

Similar presentations


Presentation on theme: "Permit to Work System Permit Orientation Training PTWS – Permit Orientation Training."— Presentation transcript:

1 Permit to Work System Permit Orientation Training PTWS – Permit Orientation Training

2 Typical work at our site Introducing: Sue – who has come to repair the toilet at Z Mana Fred – who has come to install new electrical socket Jack – who has come to install a tank for a new site Lisa – who has come to drop off tobacco at Z Skyway PTW System –PI Training

3 PTWS Requirements At Z, we reckon everybody should work safe and go home safe. The PTWS is: Risk focused Specific to Z work activities Specific to Z site environments A system to ensure hazards are: - identified, -risk assessed, -controls established and -work undertaken by competent people PTW System –PI Training

4 PTWS– Other HSSE Z policies/systems/rules for HSSE: These include: -HSSE Management System Manual -Life Saving Rules -Working at height policy -Contractor Prequalification -Site specific rules (e.g. ChCh airport depot, Retail sites, construction sites); Standard Operating Procedures - Permit to work system All workers are required to comply with all regulatory requirements and Z policies/systems/rules. PTW System – PI Training

5 PTWS Requirements Authority: All Z employees, site representatives, contractors and workers, are authorised to stop the work if there is a HSSE concern. This new PTWS requirements - effective as of 1 May Existing requirements remains in force until then. PTW System –PI Training

6 Z’s Life Saving Rules PTW System – PI Training

7 PTWS Applicability Applies to all workers conducting work for and on behalf of Z on premises operated by Z. The PTWS is mandatory and applies to non- routine work being completed at workplaces under Z operational control, Retail sites, Mini Tanker Zee sites, work conducted under a Z Construction Contract, or when working on Z owned equipment at sites owned or operated by others. A permit is required for all permitable activities. PTW System – PI Training

8 Non-routine Work Non-routine Work - Work that is NOT performed regularly in a controlled environment with an approved Standing Operating Procedure or equivalent document. For example non-routine work is a work activity that is, but not limited to, any of the below: Performed infrequently Outside of normal duties Does not have an approved standing operating procedure Performed in a different way from the standing operating procedure Has never been performed before PTW System – PI Training

9 Roles Z CEO – overall owner of PTWS HSSE Manager – PTWS custodian, responsible for the implementation of this PTWS. PTWS Orientation Trainer – provides PTWS training. PTWS Administrator –administering documents, records, PTWS website Senior Permit Issuer –monitors operational performance of the PTWS PTW System – PI Training

10 Roles Permit Issuer - prepares, authorises and issues Permits to Work Permit Holder – ensures the permit requirements are put in practice; taking all necessary steps to perform the work in a safe and environmentally sound manner Authorised Gas Tester – tests and confirms the environmental working condition is safe to work in Site Representative - the site staff member who confirms the site environment is safe for the contractor to work; sign contractor on and off site via the Work Clearance Form (WCF ) PTW System – PI Training

11 Responsibilities Permit Issuer primary responsibility: By signing the permit the Permit Issuer agrees that they have reviewed and discussed the work scope and required documentation with the Permit Holder, and identified any hazards they are aware of in the permit Permit Holder primary responsibility: By signing the permit the Permit Holder agrees to comply by putting in place the permit and supporting documents requirements and continuously supervising the work PTW System – PI Training

12 Roles Matrix PTW System – PI Training

13 Activity Risk Levels Work activities are categorised based on risk: Permitable (High Risk) activities Non-permitable: Medium Risk activities, Low Risk activities, and Deliveries Each risk category has different control measure requirements PTW System – PI Training

14 Permitable Activities PTW System – PI Training Permitable Activities - High Risk: Hot work in hazardous area Confined space entry Excavations >/= 1.5 m Live Electrical Work Abnormal work or maintenance - overriding/disabling safety critical device Hazardous substance exposure of high residual risk or greater Energised high pressure system work to hydrant lines Live Product Line Work Work at height exceeding 1.8 metres (refer exclusions)

15 Permitable Activities Permitable Activities continued - High Risk: Shop roof construction and/or installation Canopy construction and /or installation Working on single skin canopy roof Working on a non-trafficable secondary surface Tank Removal and/or installation Demolition – excluding soft strip out Crane work – excluding standard stock deliveries Any other activity that has a high or extreme residual risk Any other activity as determined by Z senior management/permit issuer PTW System – PI Training

16 Non Permitable Medium Risk Activities: Restricted Space Excavations between 0.5 metres and 1.5 metres High pressure system work to a compressed air system Work at height 0.5 metres or greater (excluding permitable) Non powered hoist use involving a suspended load Work off site in roadways Work on electrical equipment and circuits Erection structures PTW System – PI Training

17 Non Permitable Medium Risk Activities continued: Pump out of product from tanks Drilling of monitoring wells or soil borings Hazardous substance exposure of medium residual risk Hot work outside of the hazardous zone Any other risk that has a medium residual risk Any other activity as determined by Z senior management/permit issuer PTW System – PI Training

18 Non Permitable Low Risk: Any other activity deemed low risk using Z’s risk matrix E.g. changing the washer on the tap Deliveries: Delivery only services – drop off and pickup standard deliveries of stock For example: -Coca cola delivery to retail store or -construction material to a stock pile on site PTW System – PI Training

19 Documentation Documentation for the PTWS is available at Work Clearance Form must be completed daily by all Contractors for all work prior to starting work Safe Work Method Statement must be completed for Permitable activities – high risk prior to obtaining the permit Job Safety Analysis or equivalent must be completed for Medium risk work prior to performing the work Permit (permit to work) must be completed by the PermitIssuer for Permitable work. Certificates where applicable must be used with a Permit PTW System – PI Training

20 Permit Certificates Certificates: A – Hot Work Certificate B – Confined Space Certificate C - Work at Height - roofs, canopies and temporary structures D – Excavation Certificate E – Isolation Certificate F – Tank Removal / Installation Certificate G - Demolition Certificate H - Overhead Crane Certificate PTW System – PI Training

21 Work Clearance Form Work Clearance Form: a process of hazard identification designed to stop work or trigger the need for a Permit etc completed by the contractor/worker performing the work in conjunction with the Z Site Representative for manned sites/offices. PTW System – PI Training

22 Z Risk Assessment Matrix

23 SWMS/JSA Hierarchy of Controls Hierarchy of controls for determining control measures in order: 1. Eliminate the hazard e.g. by changing the work 2. Substitute e.g. change material/equipment to one with less hazards 3. Isolate the hazard e.g. by providing a form of barrier 4. Engineering Controls e.g. physical guards, structures, stop buttons 5. Administration Controls e.g. SWMS, Procedures, Training 6. PPE e.g. by providing protective equipment PTW System – PI Training

24 Hierarchy of Fall Protection Controls Fall Protection hierarchy of controls for determining work at height control measures in order: 1. Eliminate the work at height e.g. by changing the work 2. Work from permanent guard rail 3. Work from temporary guard rail or elevating working platform (scissor lift/boom 4. Work with fall restraint means - PPE 5. Work with fall arrest means - PPE PTW System – PI Training

25 Permit Validity Permit is valid for: a specific activity, site, within a specific period of time. only issued for a maximum of 5 consecutive calendar days. applied for in advance of the work – ideally 10 working days issued immediately prior to the start of the permitable work renewed via the Work Clearance Form each day by Permit Holder expires after 5 days regardless of the activity Self Permits No one is allowed to issue a Permit to themselves PTW System – PI Training

26 Permit Validity Remote Permits A remote Permit can ONLY be issued if ALL of the following criteria is satisfied: -The PI has knowledge of the site or has reliable drawings and site data -The PI has a detailed knowledge of the task and activities to be permitted -The PI has experience working with the Contractor and individual PH. -The Z senior permit issuer or delegate confirms remote permitting is appropriate and the above criteria have been met. PTW System – PI Training

27 Permit Validity Contractor Permitting A PI may issue a Permit to another person in the same Contractor organisation. Blanket Permits Blanket Permits are not permitted. Derogations and standard operating procedure approval SOP more appropriate for repetitive, routine activities. Refer to PTWS Manual for procedure to obtain derogation approval Changes in Conditions Stop work and notify Permit Issuer PTW System – PI Training

28 Training and Competency PTW System – PI Training Permit Issuer Training

29 Training and Competency Permit Issuer Training – specific activity requirements PTW System – PI Training

30 PTWS Documentation Available Contacts Andy Velasquez Tracy – PTWS Orientation Trainer PTW System – PI Training

31 Transition Timeline PTWS transitional requirements timeframe : 1 May 14 - effective date for all criteria except: -30 Jun 14 Updated Z PTWS Orientation training completed -1 Jul 14 SWMS template compliance by Permit Holder -1 May 15 Updated Safetrac training completed by Z employees -1 May 15 Updated legal documents -1 May 15 Full Permit Issuer competency requirements compliance (plan to meet requirements and progress evidence to be submitted to the PTWS Trainer by 30 Jun 14, 1 Dec 14, 1 Mar May 15 Full compliance to PTWS Manual PTW System – PI Training

32 Typical work at our site Introducing: Sue – who has come to repair the toilet at Z Mana Fred – who has come to install new electrical socket Jack – who has come to install a tank for a new site Lisa – who has come to drop off tobacco at Z Skyway PTW System –PI Training

33 Tank installation

34

35

36

37

38

39