Presentation is loading. Please wait.

Presentation is loading. Please wait.

PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision ) Quality Bulletin ProductClaim sectionClaim dateS/No.Date.

Similar presentations


Presentation on theme: "PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision ) Quality Bulletin ProductClaim sectionClaim dateS/No.Date."— Presentation transcript:

1 PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision ) Quality Bulletin ProductClaim sectionClaim dateS/No.Date of imp Model Horizontal deployment Running modelNew modelRe-FPANew part approval Quality issueCauseCount measure BeforeImprovedReferences Water Leakage from Drain Elbow. Temp countermeasure : Elbow design modification done to angular shape (120 Degree angle). Analysis Why?  Water leakage due to elbow right angle. Why?  Improper fitment of drain pan and elbow in liner. Prepared CKD App REF Field 24-08-2013 Shape design changed from right angle to angular (120 degree) Permanent countermeasure : Elbow design modification done to angular shape (120 Degree angle). 24-08-2013All Models 1. Drain elbow design was at 90 degree

2 PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision ) Quality Bulletin ProductClaim sectionClaim dateS/No.Date of imp Model Horizontal deployment Running modelNew modelRe-FPANew part approval Quality issueCauseCount measure BeforeImprovedReferences Water Leakage from Drain pan. Temp countermeasure : Drain Pan design modification done for Knob from straight to angular position as per drain elbow.. Analysis Why?  Water leakage due to elbow right angle. Why?  Improper fitment of elbow and drain pan in liner. Prepared CKD App REF Field 24-08-2013 Drain Pan design modification done for Knob from straight to angular position as per drain elbow.. Permanent countermeasure : 1. Drain pan design modification done 24-08-2013All Models 1. Drain elbow design was at 90 degree

3 PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision ) Quality Bulletin ProductClaim sectionClaim dateS/No.Date of imp Model Horizontal deployment Running modelNew modelRe-FPANew part approval Quality issueCauseCount measure BeforeImprovedReferences Water Leakage from Drain Elbow. Temp countermeasure : Drain Tube design changed from PVC to LDPE. Analysis Why?  Water leakage due to elbow right angle. Why?  Improper fitment of elbow and drain pan in liner. Prepared CKD App REF Field 24-08-2013 More flexible pipe Permanent countermeasure : Drain Tube design changed from PVC to LDPE. 24-08-2013All Models


Download ppt "PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision ) Quality Bulletin ProductClaim sectionClaim dateS/No.Date."

Similar presentations


Ads by Google