1 We can help Guaranteed products Professional indemnity insurance Proven track record FLOOD PROTECTION SPECIALISTS BS 1188 PAS-1

2 FLOOD PROTECTION SPECIALISTS Some of our team and our head office/factory ISO : 2012

3 What we do All properties protected have obtained flood insurance Products that come with a year guarantees sttc’s Products manufactured in our own factory to BSI QM standards ISO 9001 Bespoke solutions to protect your property/assets A Detailed Flood Risk Survey / Assessment A full flood solution for almost all types of property /assets Some of our Clients / Partners: anglian water Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No AIS Presentation

4 Flood Mitigation Methods Flood Consequences are affected by:- Flood Sources - Fluvial, Coastal, Surface Water, Sewer Flooding, Groundwater, Dam Bust. Prolongation of the flood, Winter / Summer flood Type of construction - masonry /brick /clad walls, concrete / timber floors, age of property, listing. Ground Conditions- Rock, Sands/ Gravels, Clay, Alluvium Topography- Check OS maps / contours, basements, ground floor level changes in the property Below Ground Drainage- GF Shower/WC, Old Land drains, Old Leets etc. Services- Gas, Electricity, Water, Cables into the property, overflows, sink wastes etc. Sundries - Door threshold levels, Air vents / Airbricks, Gas / Electric meter cupboards, exiting / proposed flood defences and defence heights. Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

5 TFS SOLUTION CHOSEN TO COMPLETE THE SCHEMES MISSING LINK The scheme for Pershore comprises two phases, phase one to protect two properties and the footpath between them and phase two the main clay core earth bund to protect the rest of this part of the town. The EA’s dilemma was how to provide the permanent protection to the two properties, one of which is listed. TFS ‘s complete solution was chosen to provide the missing link and to satisfy the conservation Architect and property owners needs providing a robust overall solution. TFS CASE STUDY – EA -PERSHORE Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

6 TFS COMPLETES PHASE ONE AHEAD OF PROGRAMME The contract to protect the two properties in Bridge Street was placed in March 2010, commenced early April and was completed early May a week ahead of programme. The Toll House is Grade 2 Listed. Phase two commenced as planned and abuts phase one providing permanent protection to this part of Pershore. TFS CASE STUDY – EA -PERSHORE Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

7 TFS CHOSEN TO PROVIDE RETRACTABLE BARRIERS TO MAIN FLOODWALL OVER WINDOW OPENINGS The Floods in Carlisle in January 2005 devastated large areas of this important town. Flood defence plans were accelerated to provide a greater level of protection than originally proposed. A defence wall was designed but light and access was needed for the windows so TFS were chosen to design a bespoke version of their retractable barriers to provide the barriers to these sections of the wall. TFS CASE STUDY – EA –Caldew Maltings Caldew Maltings - Carlisle – Flood Alleviation Scheme Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

8 TFS CHOSEN TO PROVIDE RETRACTABLE BARRIERS TO MAIN FLOODWALL OVER WINDOW OPENINGS TFS CASE STUDY – EA –Caldew Maltings Caldew Maltings - Carlisle – Flood Alleviation Scheme The barrier widths ranged from 2.4m to 3.6m and were designed so that one person could deploy them. The cover plates were designed in sections so that each one was less than 25kg in weight and the mechanism and pull rods enable simple deployment. The barriers were manufactured in our factory in Pontarddulais, transported to site and craned into position and fixed by our own staff. Volker Stevin then concreted the barriers into position and TFS commissioned the system. Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

9 TFS CASE STUDY – EA – Sturminster Newton 1-3 Old Bridge Cottages – Flood Alleviation Scheme Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Properties Flood four times in ten years at cost of some £300,000 to insurers TFS were called in by Aviva Insurance who paid for a full flood risk survey on behalf of the client of one of the Cottages as they were considering ceasing insurance on their insured. The report concluded that all three properties needed protection due to the porous walls between the properties. A design was developed which aimed at alleviating the flood problem of all three properties from the Coombe Stream After several years of negotiation with neighbours, the EA and LA a solutions was approved and contributions agreed.

10 TFS CASE STUDY – EA – Sturminster Newton 1-3 Old Bridge Cottages – Flood Alleviation Scheme Properties Flood four times in ten years after conversion from Commercial to Residential use The solution comprised a veneer walling system taken down to the clay layer of the stream bed and up to the 1:100 + CC flood height, raising the yard walls, sumps an pumps in the floor and yards, NRV’s and door barriers The project was completed in six weeks after all legal's and approvals were obtained between the parties. Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

11 Specialist contractor appointed in November for the flood alleviation work on Substation and Grid Relay Room in Carlisle in Carlisle after floods in January A detailed Survey revealed that the flood depth in January 2005 was 830mm, after extensive tender process TFS were chosen from the 12 options / contractors considered by the client. The project was ‘fast tracked’ as the client wanted completion by mid December before the first anniversary of the recent flood. The project was completed on time within budget and to the required standards. Case study 1 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

12 Utility Client had a number of sites with Marshalling Kiosks (MK) which are on significantly vulnerable sites and needed a cost effective solution to protect them. A bespoke system was developed and fully tested at the companies own test facilities to provide protection from a variety of flash, coastal or fluvial flooding The system is based on our tried and tested flood alleviation systems which have been proven in a variety of actual floods. Installations have been completed and further bespoke solutions have been developed for other types of vulnerable utility equipment in other sectors. Case study 2 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

13 TFS has successfully undertaken Major Projects for significant commercial clients to alleviate flood risk on their sites. These include a £750k project in Tamworth, £650k project in Nottingham £540k project in Rochdale an £800k project in Northampton. We are currently involved in a major project of over £1.5m for Anglian Water to protect a number of their vulnerable sites. All systems are fully tested at the companies own test facilities to provide protection from a variety of flash, coastal or fluvial flooding The systems are our tried and tested flood alleviation systems which have been proven in a variety of actual flood events. Case study 3 Major Projects Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

14 Utility Client with a large site with 33kVa and 132kVa assets which had flooded from surface water twice in two years to a depth of 620mm. Following a ‘near miss’ in November 2009 which TFS undertook temporary protection work, they decided in December to undertake an asset based flood alleviation solution which they required completing by March A bespoke solution was designed and implemented commencing on site on 11th Jan 2010 and was completed on 26 th March To meet the program we had two teams on the site who worked on a seven day week basis with every fourth weekend off. The project was delivered within budget and program. Case study 4 Rochdale Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

15 Utility Client with a very large site with 132kVa assets which had flooded from fluvial flood water twice in ten years to a depth of 540mm. As part of their ‘Flood Alleviation Programme’ requirements by OFGEM, TFS were appointed following a competitive tender bid award in May 2011 for their East West and Central Midlands assets A bespoke solution was designed and implemented commencing on site on 1 st August 2011, the substation building, four transformer and 18 separate asset protection was completed on 26 th October To meet the program we had one team on the site who worked on a seven day week basis with every fourth weekend off The project was delivered within budget and program. Case study 5 Northampton Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

16 Utility Client with a number of 33kVa and 132kVa assets which are at significant risk from fluvial, pluvial and coastal flooding. As part of their ‘Flood Alleviation Programme’ and the requirements by OFGEM, TFS were appointed following a competitive tender bid award in October 2011 for their Scottish assets A range of bespoke solutions have been designed and implemented commencing on site on 5 th January 2012, the substation building, two transformer and 4 separate asset protection was completed on in April A further 8 projects were awarded and another 8 are in the pipeline with further sites awaiting surveys The projects have to date been delivered within budget and program. Case study 6 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

17 17 Case Study 7 – Barrow WTW Structural Defence Option

18 18 Case Study 7 – Barrow WTW Flood Proofing Option

19 Case study 7 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Anglian Water Client Sites at Barrow

20 Case study 7 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Anglian Water Client Sites at Barrow

21 Case study 8 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Sutton & East Surrey Water Client Sites at Woodmansterne

22 Case study 7 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Further Water Utility Client Sites

23 Water Utility Client has a number of sites with a variety of assets which are on significantly vulnerable sites and needed cost effective solutions to protect them. A bespoke system was developed and fully tested at the companies own test facilities to provide protection from a variety of flash, coastal or fluvial flooding The systems are based on our tried and tested flood alleviation systems which have been proven in a variety of actual flood events. Several Installations have been completed and further bespoke solutions have been developed for other types of vulnerable equipment for other sites which are ongoing. Case study 8 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

24 Further Water Utility Client Sites Case study 9 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

25 Further Water Utility Client Sites Case study 10 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

26 Further Water Utility Client Sites Case study 10 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

27 Bespoke products Small Flood Proof Security CabinetsLarge Flood Proof Cabinet with Security Doors Commercial / Industrial certificated to LPCB Level 3 & 4 Commercial / Industrial Sectional Building certificated to LPCB Level 3 & 4 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

28 Bespoke products Commercial / Industrial Building certificated to LPCB Level 3 & 4 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Large Flood Proof Cabinet with Security Doors Bespoke flood proof cabinets for Major Utility Clients who look to protect their critical assets which are at significant risk from fluvial, pluvial, ground water, dam break and coastal flooding. These cabinets are fitted to existing / extended or new bases with sumps and pumps discharging above the flood level to outside. The cabinets can be made in a variety of sizes and are designed to protect a variety of vulnerable assets from flooding from all sources of flooding even over prolonged periods.

29 Bespoke products Flood Proof Single Stable DoorsFlood Proof Double Doors with Stable single door Commercial / Industrial Doors Manufactured by TFS Ltd Commercial / Industrial Building Doors Manufactured by TFS Ltd Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

30 Bespoke products Flood Proof Security DoorsFlood Proof Double Security Doors Commercial / Industrial Building Doors Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

31 Bespoke products Flood Proof Security DoorsFlood Proof Double Security Doors Commercial / Industrial Doors certificated to LPCB Level 3 & 4 Commercial / Industrial Building Doors certificated to LPCB Level 3 & 4 Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

32 Bespoke Flood Barriers Single & Double Flood Barriers up to 9m wide x 4m high Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No

33 Bespoke Flood Barriers Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Single & Double Flood Barriers up to 9m wide x 4m high

34 Bespoke Flood Barriers Registered Office: Total Flood Solutions Limited Unit 12 (F1) Llanelli Gate Dafen, Llanelli, DYFED, SA14 8LQ Registered in England & Wales Company No VAT No Upton on Severn Single & Double Flood Barriers & glazed Barriers


Download ppt "We can help Guaranteed products Professional indemnity insurance Proven track record www.totalfloodsolutions.com 0845 456 7175 FLOOD PROTECTION SPECIALISTS."

Similar presentations


Ads by Google