1 Author: Saša Ilić JP “SRBIJAGAS” 21000 Novi Sad,Narodnog fronta 12 Serbia and Montenegro DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO Athens,

Similar presentations


Presentation on theme: "1 Author: Saša Ilić JP “SRBIJAGAS” 21000 Novi Sad,Narodnog fronta 12 Serbia and Montenegro DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO Athens,"— Presentation transcript:

1 1 Author: Saša Ilić JP “SRBIJAGAS” Novi Sad,Narodnog fronta 12 Serbia and Montenegro DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO Athens, November 2005

2 2 BASIC ACTIVITIES OF NIS – PETROLEUM INDUSTRY OF SERBIA m EXPLORATION AND PRODUCTION m NATURAL GAS AND LPG TRANSPORT, DISTIBUTION AND MARKETING m REFINERY PROCESSING m MARKETING AND TRADE m ENGINEERING SERVICES m RELATED ACTIVITIES (NON CORE)

3 3 BOARD OF DIRECTORS NIS-PETROLEUM INDUSTRY OF SERBIA BOARD OF DIRECTORS GENERAL DIRECTOR SUPERVISORY BOARD EXECUTIVE BOARD -General director -Deputy general director - Assistant general director - Directors of operative divisions NIS-NAFTAGAS NOVI SAD NIS-GAS NOVI SAD NIS-ENERGOGAS BEOGRAD NIS-RNP PANCEVO NIS-RNS NOVI SAD NIS-RNB BEOGRAD NIS-FAM KRUSEVAC NIS-JUGOPETROL BEOGRAD NIS-NAP NOVI SAD NIS-ENGINEERING NOVI SAD

4 4 NIS-GAS NOVI SADNIS-ENERGOGAS BEOGRAD JP SRBIJAGAS INVOLVED IN FOLLOWING ACTIVITIES CONNECTED TO NATURAL GAS: m TRANSPORTATION, m DISTRIBUTION, m STORAGE, m SYSTEM OPERATING, m TRADING

5 5 PIPELINE SYSTEM OF SERBIA SRBIJAGAS - GAS - Energogas YugoROS gas Max. capacity mil. m3 per yearMax. capacity mil. m3 per year Maximum working pressure 50 barMaximum working pressure 50 bar Total length of high-pressure pipeline is 2135 kmTotal length of high-pressure pipeline is 2135 km Dimensions range from DN 150 to DN 750Dimensions range from DN 150 to DN 750 Average age of pipeline: 25 yearAverage age of pipeline: 25 year 533 metering and regulating stations from 100 to Sm3/h533 metering and regulating stations from 100 to Sm3/h MAIN FEATURES OF PIPELINE SYSTEM

6 6 THE CONSUMPTION OF NATURAL GAS IN SERBIA DURING THE PERIOD

7 7 The Heating Plant and Household share in yearly gas consumption in Serbia

8 8 NATURAL GAS DEMAND FORECAST FOR THE PERIOD

9 9 GAS PIPELINE SYSTEM DEVELOPMENT PLAN UNTIL m CONSTRUCTION OF HIGH PRESSURE PIPELINES m UNDERGROUND GAS STORAGE “BANATSKI DVOR” m DISTRIBUTION NETWORKS m REHABILITATION AND UPGRADING OF EXISTING PIPELINE SYSTEM

10 10 PLANNED HIGH PRESSURE PIPELINES IN NORTHERN PART OF SERBIA ESTIMATED COST OF INVESTMENT EUR 82 mil. No.DNLength Inch m 1. 30” 30 km 900, ” 170 km 4,000, ” 70 km 1,400, ” 27 km 324, ” 84 km 840, / 8 ” 37 km 319, / 8 ” 40 km 265, ½” 12 km 54,000 Total 470 km 8 182,000 PIPELINE SYSTEM OF SERBIA Planned pipelines in Northern part of Serbia

11 11 Ref no. DNLength Inch m 1.28” 248 km ” 70 km km ” 216 km ” 68 km ” 62 km Total 752 km PLANNED HIGH PRESSURE PIPELINES IN CENTRAL AND SOUTHERN PART OF SERBIA ESTIMATED COST OF INVESTMENT EUR 140 mil. PIPELINE SYSTEM OF SERBIA Planned pipelines in Central and Southern part of Serbia

12 12 Ref no. DNLength Inch m 1. 16” 215km 3,440, ” 210 km 2,100,000 Total 425 km 5,540,000 PLANED HIGH PRESSURE PIPELINES FOR AND IN MONTENEGRO ESTIMATED COST OF INVESTMENT EUR 55 mil. PIPELINE SYSTEM OF SERBIA Planned pipelines in Montenegro

13 13 BASIC PARAMETERS FOR UNDERGROUND GAS STORAGE CONSTRUCTION BASIC PARAMETERS FOR UNDERGROUND GAS STORAGE CONSTRUCTION m GAS CONSUMPTION IN 1997, 2.6 billion m 3 m ESTIMATED GAS CONSUMPTION UNTIL 2010, 3.3 billion m 3 m DOMESTIC GAS PRODUCTION 300 million m 3 m DOMINANT IMPORTATION OF RUSSIAN GAS UNTIL 2010 m UNEVEN GAS CONSUMPTION DYNAMICS m EVEN GAS IMPORTATION DYNAMICS m REQUIRED GAS STORAGE FOR 25-30% OF YEARLY CONSUMPTION

14 14 PIPELINE SYSTEM OF SERBIA SRBIJAGAS - Gas - Energogas - Yugorosgas - Gas Storage LOCATION, AND TECHNICAL FETURES OF UNDERGROUND GAS STORAGE CAPACITY :CAPACITY : MAX 800 million m3MAX 800 million m3 I phase 300 million m3I phase 300 million m3 INJECTION CAPACITY: INJECTION CAPACITY: max. 7 million m3/daymax. 7 million m3/day min. 1.3 million m3/daymin. 1.3 million m3/day PRODUCTION CAPACITY: PRODUCTION CAPACITY: max. 10 million m3/daymax. 10 million m3/day min. 1.6 million m3/daymin. 1.6 million m3/day WELL PRODUCTIVITY: WELL PRODUCTIVITY: max. 0,55 million m3/daymax. 0,55 million m3/day min. 0,3 million m3/daymin. 0,3 million m3/day

15 15 PROJECT INVESTMENTS m REQUIRED INVESTMENT 128 million EUR m EQUIPMENT AND WORKS 65 million EUR m CUSHION GAS 63 million EUR GAS STORAGE IS PLANED TO BE CONSTRUCTED IN TWO PHASES m PHASE I 2004./ million EUR  EQUIPMENT AND WORKS 7 million EUR  CUSHION GAS 43 million EUR m PHASE II STAGE million EUR

16 16 CONSTRUCTION OF MUNICIPAL NATURAL GAS DISTRIBUTION NETWORKS Distribution network comprise m steel pipelines diameter 2”-12” - metering and regulation stations Sm3/h m PE pipes diameter d40 - d225- residential and commercial stations G-4 to G-25 m Municipal gas networks could be constructed in more than 80 districts all over the Serbia. m The construction of the said municipal networks would allow the connection of households

17 17 FUNDS FOR MUNICIPAL NATURAL GAS DISTRIBUTION NETWORKS m The construction of the municipal networks would be funded partly from J.P.”SRBIJAGAS” own assets, from credits, and partly by local municipalities and by domestic and foreign qualified partners. m The participation of foreign partner is expected in the realization of this project in technical and financial terms. m The construction of municipal networks is planned for the next ten years. The estimated value for the construction of municipal gas distribution networks amounts to EUR 500.mil.

18 18 REHABILITATION OF THE EXISTING GAS PIPELINE SYSTEM Goals: to provide reliable and safe gas transportation - Modernization of technological systems for: - Remote control and surveillance - Measurement of the delivered and received quantities of energy - Inspection of pipeline with the modern pipeline inspection tools - Replacement of battered pipes and equipment on the pipelines - Environmental protection - Replacement of pipeline section for the purpose of increasing the reliability of transportation. - Reconstruction of existing metering and regulation stations. Estimated cost of the investment: EUR 30 mil

19 19 RECAPITULATION OF INVESTMENTS m HIGH PRESSURE PIPELINES 277 million EUR m UNDERGROUND GAS STORAGE “BANATSKI DVOR” 128 million EUR m DISTRIBUTION NETWORKS 500 million EUR m REHABILITATION AND UPGRADING OF EXISTING PIPELINE SYSTEM 30 million EUR TOTAL 935 million EUR

20 20 THANK YOU FOR YOUR ATTENTION Saša Ilić SRBIJAGAS Novi Sad, Narodnog Fronta 12 Serbia and Montenegro


Download ppt "1 Author: Saša Ilić JP “SRBIJAGAS” 21000 Novi Sad,Narodnog fronta 12 Serbia and Montenegro DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO Athens,"

Similar presentations


Ads by Google