Ramón Cerero ES Session 3 - Block2 - Barcelona 12-15 May 2003 Integration of Control Centre and Power Quality Information at IBERDROLA Ramón Cerero Ana.

Similar presentations


Presentation on theme: "Ramón Cerero ES Session 3 - Block2 - Barcelona 12-15 May 2003 Integration of Control Centre and Power Quality Information at IBERDROLA Ramón Cerero Ana."— Presentation transcript:

1 Ramón Cerero ES Session 3 - Block2 - Barcelona 12-15 May 2003 Integration of Control Centre and Power Quality Information at IBERDROLA Ramón Cerero Ana Gzlez Bordagaray Mikel Abendaño

2 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -2 n Iberdrola: Company introduction n Need for iPODAC n Interfaces with other systems n Architectural Design n User Interface n Conclusions and further developments Index

3 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -3 Company Introduction VALLADOLID VALENCIA BILBAO MADRID CACERES TOLEDO ALICANTE MURCIA 9,3 Million Customers. 8 Control centres distributed along Spanish territory (formerly 37 in 1997) 50.000 MV outages, 20.000 planned jobs 900 Substations (all telecontrolled)+ 2000 telecontrolled locations in MV Feeders. Transformation Capacity : 11.900 MW (MV) + 25.200 MVA(LV) 6.000 HV/MV Feeders 78.000 MV/LV Transformers. Main numbers:

4 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -4 n General reingeneering. Grouping of control centres and systems, Implementation of new systems (DMS, Maintenance) and demand for information all around the company n Need for Integration (SCADA/DMS, AM/FM/GIS, MAINTENANCE/RELIABILITY, CIS) n Need for real time information (Maintenance, operation) and historical data (planning, maintenance, operation, management). n Web technologies: Corporate access from anywhere, small bandwidth requirement, friendliness. n New regulation requirements (exoneration, customer discounts, auditability, etc..) Why was iPODAC needed?

5 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -5 WEB ACCESS to iPODAC through the Browser Outages, calls, Quality of service information... Outages Information for Bill Discounts Field Orders Measurements Counters (SCADA/DMS/EMS) GIS/AM/FM (Sigrid system) CIS (Customer Bills) SAP environment RELIABILITY AND MAINTENANCE (GAMAD system) Network Model & Inventory iPODAC Interfaces Real time Data Outages/jobs history Quality of service indexes Other Statistical reports iPODAC

6 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -6 Architectural Design

7 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -7 User Interface n Web Based Aproach user interface: n Easy to access from anywhere inside/outside the company n User Friendly interface. n Future oriented (mobile access, internet,…) n Flexible design. n Currently Following Functionality implemented: n Real time outages (Maintenance, operation). n Historic outages (planning, maintenanace, operation, management). n Quality of service indexes (Indexes such as TIEPI, NIEPI, individual Quality of Service) n Tracking of exoneration n Other general statistical reports (number of outages, Calls. Response times, expected & quality tendency, etc…) n SMS sending.

8 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -8

9 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -9

10 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -10 Final Conclusions n Success Based in User experiences and comments n True improvements: systems management and maintenance, flexibility for changes, users satisfaction with solution. n Future objectives: n Mobile access, planned outages, graphic visualization of results (map like), improvements based on new quality of service regulation requirements n Connection with other Web systems (SCADA alarms, Maintenance reports, etc..)

11 Barcelona 12-15 May 2003 Ramón Cerero ES Session 3 - Block2 -11 Contact Information Ramón Cereroramon.cerero@iberdrola.es+34944664303 Ana Gzlez. Bordagarayana.gb@iberdrola.es+34944663551 Mikel Abendañomabendano@iberdrola.es+34944664957